In order to study the stress characteristics of the initial support and secondary lining of the large section tunnel and to solve the problem of secondary lining cracking during operation. Taking the large section tun...In order to study the stress characteristics of the initial support and secondary lining of the large section tunnel and to solve the problem of secondary lining cracking during operation. Taking the large section tunnel in Zihong village, Qi County as the research object, a numerical simulation method was used to establish a finite element model of the large section tunnel. So as to simulate and analyze the stress characteristics of the support structure of this tunnel. Through the simulation of the initial support and second lining of this large section tunnel in terms of displacement, stress, plastic zone damage and anchor shaft force, the results show that as the excavation progresses, the stress and displacement on the surface of the newly excavated tunnel profile is faster, especially at the side walls and arch footings, the stress and displacement values are slightly larger than other characteristic points, but the final values are stable and converge, and are basically consistent with the field monitoring results, which indicates that this support system is basically in stable state. Therefore, during the tunnel excavation and support process, special attention should be paid to the stability of the sidewalls and footings, and the results of this study will be of great practical significance for tunnel construction and maintenance.展开更多
The Gaoloushan Tunnel in Longnan City,Gansu Province,China,frequently experiences rockburst disasters due to high in-situ stress.Managing rockburst in deep-buried tunnels remains a challenging issue.This paper employs...The Gaoloushan Tunnel in Longnan City,Gansu Province,China,frequently experiences rockburst disasters due to high in-situ stress.Managing rockburst in deep-buried tunnels remains a challenging issue.This paper employs RFPA(Rock Failure Process Analysis)software to establish a calculation model of constant resistance and large deformation(CRLD)anchorages and analyzes the effects of different support methods and pre-stress levels on rockburst.We simulate the process of tunnel rockburst disasters and find that ordinary anchor support incurs rockburst on the right arch waist and arch top,forming a V-shaped explosion pit.CRLD anchor support has several advantages in rockburst control,such as more uniform stress distribution in the surrounding rock,a uniform distribution of plastic zones,less noticeable damage to the tunnel,and effective control of the arch top displacement.The effectiveness of the CRLD anchor support under varying pre-stress conditions shows that a higher prestress results in a smaller plastic zone of the surrounding rock and arch top displacement and a lower number of acoustic emission signals,which better explains the excavation compensation effect.Moreover,adding long anchorages in the deep surrounding rock area can better control rockburst and reduce surrounding rock deformation.Based on these findings,we propose a comprehensive control system that combines long and short anchorages and provides the optimal scheme based on calculations.Therefore,by using high-prestress CRLD anchor support and the combination of long and short anchorages at critical positions,we can enhance the integrity of the surrounding rock,effectively absorb the energy released by the surrounding rock deformation,and reduce the incidence of rockburst disasters.展开更多
As in the building of deep buried long tunnels,there are complicated conditions such as great deformation,high stress,multi-variables,high non-linearity and so on,the algorithm for structure optimization and its appli...As in the building of deep buried long tunnels,there are complicated conditions such as great deformation,high stress,multi-variables,high non-linearity and so on,the algorithm for structure optimization and its application in tunnel engineering are still in the starting stage. Along with the rapid development of highways across the country,it has become a very urgent task to be tackled to carry out the optimization design of the structure of the section of the tunnel to lessen excavation workload and to reinforce the support. Artificial intelligence demonstrates an extremely strong capability of identifying,expressing and disposing such kind of multiple variables and complicated non-linear relations. In this paper,a comprehensive consideration of the strategy of the selection and updating of the concentration and adaptability of the immune algorithm is made to replace the selection mode in the original genetic algorithm which depends simply on the adaptability value. Such an algorithm has the advantages of both the immune algorithm and the genetic algorithm,thus serving the purpose of not only enhancing the individual adaptability but maintaining the individual diversity as well. By use of the identifying function of the antigen memory,the global search capability of the immune genetic algorithm is raised,thereby avoiding the occurrence of the premature phenomenon. By optimizing the structure of the section of the Huayuan tunnel,the current excavation area and support design are adjusted. A conclusion with applicable value is arrived at. At a higher computational speed and a higher efficiency,the current method is verified to have advantages in the optimization computation of the tunnel project. This also suggests that the application of the immune genetic algorithm has a practical significance to the stability assessment and informationization design of the wall rock of the tunnel.展开更多
The shallow tunnelling method(STM)often uses temporary supports to divide large section tunnels into several closed or semiclosed sections so as to share the upper load.The complex support system composed of primary a...The shallow tunnelling method(STM)often uses temporary supports to divide large section tunnels into several closed or semiclosed sections so as to share the upper load.The complex support system composed of primary and temporary supports can ensure safety during tunnel construction.Based on the large section tunnel of Beijing Subway Line 12,the mechanical characteristics of support system by the double-side-drift method(DSDM)during excavation and demolition were analyzed through numerical simulation and monitoring.The study showed that the middle cave excavation was the most critical stage of the DSDM,during which the load on the supporting structure increased significantly.The temporary vertical support bore most of the new load during middle cave excavation.During the demolition stage,the load was redistributed,which caused arch settlement and section convergence.The removal of the temporary vertical support exerted the greatest impact in this process.The lateral temporary inverted arch changed from axial compression to axial tension after the middle and lower caves were excavated.Based on the mechanical characteristics of the support system,some engineering suggestions were proposed for large section tunnel construction.These research results can provide reference for the design and construction of similar large section tunnels.展开更多
This paper summarizes the experience that was gained during the construction of the 15.4 km long Ceneri Base Tunnel (CBT), which is the southern part of the fiat railway line crossing the Swiss Alps from north to so...This paper summarizes the experience that was gained during the construction of the 15.4 km long Ceneri Base Tunnel (CBT), which is the southern part of the fiat railway line crossing the Swiss Alps from north to south. The project consisted of a twin tube with a diameter of 9 m interconnected by cross- passages, each 325 m long. In the middle of the alignment and at its southern end, large caverns were excavated for logistical and operational requirements. The total excavation length amounted to approx- imately 40 km. The tunnel crossed Alpine rock formations comprising a variety of rock typologies and several fault zones. The maximum overburden amounted to 850 m. The excavation of the main tunnels and of the cross-passages was executed by means of drill-and-blast (D&B) excavation. The support con- sisted of bolts, meshes, fiber-reinforced shotcrete and, when required, steel ribs. A gripper tunnel boring machine (TBM) was used in order to excavate the access tunnel. The high overburden caused squeezing rock conditions, which are characterized by large anisotropic convergences when crossing weaker rock formations. The latter required the installation of a deformable support. At the north portal, the tunnel (with an enlarged cross-section) passed underneath the A2 Swiss highway (the major road axis connect- ing the north and south of Switzerland) at a small overburden and through soft ground. Vertical and sub- horizontal jet grouting in combination with partial-face excavation was successfully implemented in order to limit the surface settlements. The south portal was located in a dense urban area. The excavation from the south portal included an approximately 220 m long cut-and-cover tunnel, followed by about 300 m of D&B excavation in a bad rock formation. The very low overburden, poor rock quality, and demanding crossing with an existing road tunnel (at a vertical distance of only 4 m) required special excavation methods through reduced sectors and special blasting techniques in order to limit the blast-induced vibrations. The application of a comprehensive risk management procedure, the execution of an intensive surface survey, and the adaptability of the tunnel design to the encountered geological conditions allowed the successful completion of the excavation works.展开更多
文摘In order to study the stress characteristics of the initial support and secondary lining of the large section tunnel and to solve the problem of secondary lining cracking during operation. Taking the large section tunnel in Zihong village, Qi County as the research object, a numerical simulation method was used to establish a finite element model of the large section tunnel. So as to simulate and analyze the stress characteristics of the support structure of this tunnel. Through the simulation of the initial support and second lining of this large section tunnel in terms of displacement, stress, plastic zone damage and anchor shaft force, the results show that as the excavation progresses, the stress and displacement on the surface of the newly excavated tunnel profile is faster, especially at the side walls and arch footings, the stress and displacement values are slightly larger than other characteristic points, but the final values are stable and converge, and are basically consistent with the field monitoring results, which indicates that this support system is basically in stable state. Therefore, during the tunnel excavation and support process, special attention should be paid to the stability of the sidewalls and footings, and the results of this study will be of great practical significance for tunnel construction and maintenance.
基金funded by the National Natural Science Foundation of China(52174096,42277174)the Fundamental Research Funds for the Central Universities(2022YJSSB03)the Scientific and Technological Projects of Henan Province(232102320238)。
文摘The Gaoloushan Tunnel in Longnan City,Gansu Province,China,frequently experiences rockburst disasters due to high in-situ stress.Managing rockburst in deep-buried tunnels remains a challenging issue.This paper employs RFPA(Rock Failure Process Analysis)software to establish a calculation model of constant resistance and large deformation(CRLD)anchorages and analyzes the effects of different support methods and pre-stress levels on rockburst.We simulate the process of tunnel rockburst disasters and find that ordinary anchor support incurs rockburst on the right arch waist and arch top,forming a V-shaped explosion pit.CRLD anchor support has several advantages in rockburst control,such as more uniform stress distribution in the surrounding rock,a uniform distribution of plastic zones,less noticeable damage to the tunnel,and effective control of the arch top displacement.The effectiveness of the CRLD anchor support under varying pre-stress conditions shows that a higher prestress results in a smaller plastic zone of the surrounding rock and arch top displacement and a lower number of acoustic emission signals,which better explains the excavation compensation effect.Moreover,adding long anchorages in the deep surrounding rock area can better control rockburst and reduce surrounding rock deformation.Based on these findings,we propose a comprehensive control system that combines long and short anchorages and provides the optimal scheme based on calculations.Therefore,by using high-prestress CRLD anchor support and the combination of long and short anchorages at critical positions,we can enhance the integrity of the surrounding rock,effectively absorb the energy released by the surrounding rock deformation,and reduce the incidence of rockburst disasters.
基金supported by the National Natural Science Foundation of China (No.50808090)
文摘As in the building of deep buried long tunnels,there are complicated conditions such as great deformation,high stress,multi-variables,high non-linearity and so on,the algorithm for structure optimization and its application in tunnel engineering are still in the starting stage. Along with the rapid development of highways across the country,it has become a very urgent task to be tackled to carry out the optimization design of the structure of the section of the tunnel to lessen excavation workload and to reinforce the support. Artificial intelligence demonstrates an extremely strong capability of identifying,expressing and disposing such kind of multiple variables and complicated non-linear relations. In this paper,a comprehensive consideration of the strategy of the selection and updating of the concentration and adaptability of the immune algorithm is made to replace the selection mode in the original genetic algorithm which depends simply on the adaptability value. Such an algorithm has the advantages of both the immune algorithm and the genetic algorithm,thus serving the purpose of not only enhancing the individual adaptability but maintaining the individual diversity as well. By use of the identifying function of the antigen memory,the global search capability of the immune genetic algorithm is raised,thereby avoiding the occurrence of the premature phenomenon. By optimizing the structure of the section of the Huayuan tunnel,the current excavation area and support design are adjusted. A conclusion with applicable value is arrived at. At a higher computational speed and a higher efficiency,the current method is verified to have advantages in the optimization computation of the tunnel project. This also suggests that the application of the immune genetic algorithm has a practical significance to the stability assessment and informationization design of the wall rock of the tunnel.
基金Beijing Science and Technology Planning Project(CN),Grant/Award Number:Z201100008120013Fundamental Research Funds for the Central Universities,Grant/Award Number:2022YQLJ01Major Achievements Transformation and Industrialization Projects of Central Universities in Beijing,Grant/Award Number:ZDZH20141141301。
文摘The shallow tunnelling method(STM)often uses temporary supports to divide large section tunnels into several closed or semiclosed sections so as to share the upper load.The complex support system composed of primary and temporary supports can ensure safety during tunnel construction.Based on the large section tunnel of Beijing Subway Line 12,the mechanical characteristics of support system by the double-side-drift method(DSDM)during excavation and demolition were analyzed through numerical simulation and monitoring.The study showed that the middle cave excavation was the most critical stage of the DSDM,during which the load on the supporting structure increased significantly.The temporary vertical support bore most of the new load during middle cave excavation.During the demolition stage,the load was redistributed,which caused arch settlement and section convergence.The removal of the temporary vertical support exerted the greatest impact in this process.The lateral temporary inverted arch changed from axial compression to axial tension after the middle and lower caves were excavated.Based on the mechanical characteristics of the support system,some engineering suggestions were proposed for large section tunnel construction.These research results can provide reference for the design and construction of similar large section tunnels.
文摘This paper summarizes the experience that was gained during the construction of the 15.4 km long Ceneri Base Tunnel (CBT), which is the southern part of the fiat railway line crossing the Swiss Alps from north to south. The project consisted of a twin tube with a diameter of 9 m interconnected by cross- passages, each 325 m long. In the middle of the alignment and at its southern end, large caverns were excavated for logistical and operational requirements. The total excavation length amounted to approx- imately 40 km. The tunnel crossed Alpine rock formations comprising a variety of rock typologies and several fault zones. The maximum overburden amounted to 850 m. The excavation of the main tunnels and of the cross-passages was executed by means of drill-and-blast (D&B) excavation. The support con- sisted of bolts, meshes, fiber-reinforced shotcrete and, when required, steel ribs. A gripper tunnel boring machine (TBM) was used in order to excavate the access tunnel. The high overburden caused squeezing rock conditions, which are characterized by large anisotropic convergences when crossing weaker rock formations. The latter required the installation of a deformable support. At the north portal, the tunnel (with an enlarged cross-section) passed underneath the A2 Swiss highway (the major road axis connect- ing the north and south of Switzerland) at a small overburden and through soft ground. Vertical and sub- horizontal jet grouting in combination with partial-face excavation was successfully implemented in order to limit the surface settlements. The south portal was located in a dense urban area. The excavation from the south portal included an approximately 220 m long cut-and-cover tunnel, followed by about 300 m of D&B excavation in a bad rock formation. The very low overburden, poor rock quality, and demanding crossing with an existing road tunnel (at a vertical distance of only 4 m) required special excavation methods through reduced sectors and special blasting techniques in order to limit the blast-induced vibrations. The application of a comprehensive risk management procedure, the execution of an intensive surface survey, and the adaptability of the tunnel design to the encountered geological conditions allowed the successful completion of the excavation works.