For a water supply system with long-distance diversion pipelines, in addition to the water hammer problems that occur beyond pumps, the safety of the water diversion pipeline in front of pumps also deserves attention....For a water supply system with long-distance diversion pipelines, in addition to the water hammer problems that occur beyond pumps, the safety of the water diversion pipeline in front of pumps also deserves attention. In this study, a water hammer protection scheme combined with an overflow surge tank and a regulating valve was developed. A mathematical model of the overflow surge tank was developed, and an analytical formula for the height of the overflow surge tank was derived. Furthermore, a practical water supply project was used to evaluate the feasibility of the combined protection scheme and analyze the sensitivity of valve regulation rules. The results showed that the combined protection scheme effectively reduced the height of the surge tank, lessened the difficulties related to construction, and reduced the necessary financial investment for the project. The two-stage closing rule articulated as fast first and then slow could minimize the overflow volume of the surge tank when the power failure occurred, while the two-stage opening rule articulated as slow first and then fast could be more conducive to the safety of the water supply system when the pump started up.展开更多
The extensively built long-distance water transmission pipelines have become the main water sources for urban areas. To ensure the reliability and safety of the water supply, from the viewpoint of overall management, ...The extensively built long-distance water transmission pipelines have become the main water sources for urban areas. To ensure the reliability and safety of the water supply, from the viewpoint of overall management, it would be necessary to establish a system of information management for the pipeline. The monitoring, calculating and analyzing functions of the system serve to give controlling instructions and safe operating rules to the automatic equipment and technician, making sure the resistance coefficient distribution along the pipeline is reasonable; the hydraulic state transition is smooth when operating conditions change or water supply accidents occur, avoiding the damage of water hammer. This paper covered the composition structures of the information management system of long-distance water transmission pipelines and the functions of the subsystems, and finally elaborated on the approaches and steps of building a mathematics model for the analysis of dynamic hydraulic status.展开更多
According to the engineering investigation of long-distance oil and gas pipelines, the criterions and measures of route selection are drawn as follows: the flat landform is the first choice in route alignment. The fo...According to the engineering investigation of long-distance oil and gas pipelines, the criterions and measures of route selection are drawn as follows: the flat landform is the first choice in route alignment. The foot of mountain is the first choice when the route passes by the valley. The route should pass by but the shady and deposited slope and not in sunny and erosive slope as possible as it can. The pipeline should be vertical to contour climbing and descending the mountain except steep slope. Tunnel can be used in crossing foothill. Perpendicularly traversing the river is better than beveling; the worst choice is to put the pipeline along the river. Bypass is the best choice in karsts area. The order of route selection should be pre-choosing, investigation, optimization and adjustment.展开更多
The oilfield construction and long-distance oil pipeline engineering has been developed extensively in China. The risk assessment of oil industry will, however, be an important objective to cope with the development o...The oilfield construction and long-distance oil pipeline engineering has been developed extensively in China. The risk assessment of oil industry will, however, be an important objective to cope with the development of oil industry , The risk assessment of oil industry has many subjects worthy to be studied.The major purpose of the paper is to research the risk cases of long-distance oil pipeline engineering in Ganshu and Shaanxi provinces.展开更多
Given fierce competition in the overseas pipeline project market, human resources localization has become the only way to sustain the development of overseas pipeline projects. Thus, in this paper, the significance of...Given fierce competition in the overseas pipeline project market, human resources localization has become the only way to sustain the development of overseas pipeline projects. Thus, in this paper, the significance of human resources localization is analyzed in terms of the needs of the "going global" strategy, the reduction of labor costs, the aversion of project risks, and project communication. In addition, relevant measures for human resources localization are proposed, taking the Indian project as an example.展开更多
The Bangladeshi government signed a framework agreement with China for construction of a 220-km pipeline to carry oil from tankers in the Bay of Bengal to storage plants on Chinese mainland. Bangladesh's Economic Rel...The Bangladeshi government signed a framework agreement with China for construction of a 220-km pipeline to carry oil from tankers in the Bay of Bengal to storage plants on Chinese mainland. Bangladesh's Economic Relations Department (ERD) Secretary Kazi Shofiqul Azam and Chinese Ambassador to Bangladesh Ma Mingqiang signed the framework agreement in the capital of Dhaka.展开更多
On July 4 2002, a project attracting world attention, i.e., the West-East Gas Pipeline Project was declared in full-scale commencement. The project will write history with its enormous social and economic benefits.
The West East pipeline project attracted the attention from all over the world for its long distance, huge diameter, complex geographic conditions, and diversified welding techniques being applied.In this paper the de...The West East pipeline project attracted the attention from all over the world for its long distance, huge diameter, complex geographic conditions, and diversified welding techniques being applied.In this paper the detail welding process and procedures used in the project are discussed and the distinguished achievements on welding techniques of China pipeline construction are described.展开更多
A practical approach is discussed for sub-sea pipeline monitoring and leak detection based on the real time transient model . The characteristic method of transient simulation is coupled with the Extended Kalman Filt...A practical approach is discussed for sub-sea pipeline monitoring and leak detection based on the real time transient model . The characteristic method of transient simulation is coupled with the Extended Kalman Filter to estimate the system state where the only observed data are inlet and outlet flow rate and pressure. Because EKF has a time variant track under the non-stationary stochastic process with additive Gaussian noise, the high sensitivity of RTTM to non-stationary operating condition is reduced. A leak location recursion estimation formula is presented based on the real time observed data. The results of 27 groups of test data indicate that the procedure presented is sensitive to a wide range of detectable leak sizes and has a low average relative error of leak location .展开更多
China and Kazakhstan are reviewing the possibil-ity of building a pipeline to deliver natural gas fromwestern Kazakhstan to Xinjiang Uygur AutonomousRegion,on China’s western border,to satisfy the
The directional crossing drilling works were applied in the West East gas pipeline (WEGTP) project. The main researchs on the directional crossing drilling include:(1)to analyze the forces applied on the drilling tool...The directional crossing drilling works were applied in the West East gas pipeline (WEGTP) project. The main researchs on the directional crossing drilling include:(1)to analyze the forces applied on the drilling tool and the failure mechanism in order to obtain the proper configuration of the drilling tool and solve the failure prevention;(2)to analyze the existing mud, to propose a viable mud composition;(3)in respect of mud mixing and environmental protection, to develop a quick cycloning mud hydration and recycling device;(4)to develop a interface picture software for direction controlling measured parameter to improve directional drilling accuracy; (5) to develop an electronic search software incorporating large amount of construction specifications and mud compositions, used for construction. In this paper the first one of the above mentioned points is introduced, including existing problems with directional drilling, optimization of the drilling tool, analysis of drill collar fracture failure, research on stress scattering structure of drilling tool thread and thread sticking prevention measures, etc.展开更多
基金supported by the National Natural Science Foundation of China(Grants No.52179062 and 51879087).
文摘For a water supply system with long-distance diversion pipelines, in addition to the water hammer problems that occur beyond pumps, the safety of the water diversion pipeline in front of pumps also deserves attention. In this study, a water hammer protection scheme combined with an overflow surge tank and a regulating valve was developed. A mathematical model of the overflow surge tank was developed, and an analytical formula for the height of the overflow surge tank was derived. Furthermore, a practical water supply project was used to evaluate the feasibility of the combined protection scheme and analyze the sensitivity of valve regulation rules. The results showed that the combined protection scheme effectively reduced the height of the surge tank, lessened the difficulties related to construction, and reduced the necessary financial investment for the project. The two-stage closing rule articulated as fast first and then slow could minimize the overflow volume of the surge tank when the power failure occurred, while the two-stage opening rule articulated as slow first and then fast could be more conducive to the safety of the water supply system when the pump started up.
基金Hi-Tech Research and Development Program of China (863 Program)(2002AA601140)
文摘The extensively built long-distance water transmission pipelines have become the main water sources for urban areas. To ensure the reliability and safety of the water supply, from the viewpoint of overall management, it would be necessary to establish a system of information management for the pipeline. The monitoring, calculating and analyzing functions of the system serve to give controlling instructions and safe operating rules to the automatic equipment and technician, making sure the resistance coefficient distribution along the pipeline is reasonable; the hydraulic state transition is smooth when operating conditions change or water supply accidents occur, avoiding the damage of water hammer. This paper covered the composition structures of the information management system of long-distance water transmission pipelines and the functions of the subsystems, and finally elaborated on the approaches and steps of building a mathematics model for the analysis of dynamic hydraulic status.
文摘According to the engineering investigation of long-distance oil and gas pipelines, the criterions and measures of route selection are drawn as follows: the flat landform is the first choice in route alignment. The foot of mountain is the first choice when the route passes by the valley. The route should pass by but the shady and deposited slope and not in sunny and erosive slope as possible as it can. The pipeline should be vertical to contour climbing and descending the mountain except steep slope. Tunnel can be used in crossing foothill. Perpendicularly traversing the river is better than beveling; the worst choice is to put the pipeline along the river. Bypass is the best choice in karsts area. The order of route selection should be pre-choosing, investigation, optimization and adjustment.
文摘The oilfield construction and long-distance oil pipeline engineering has been developed extensively in China. The risk assessment of oil industry will, however, be an important objective to cope with the development of oil industry , The risk assessment of oil industry has many subjects worthy to be studied.The major purpose of the paper is to research the risk cases of long-distance oil pipeline engineering in Ganshu and Shaanxi provinces.
文摘Given fierce competition in the overseas pipeline project market, human resources localization has become the only way to sustain the development of overseas pipeline projects. Thus, in this paper, the significance of human resources localization is analyzed in terms of the needs of the "going global" strategy, the reduction of labor costs, the aversion of project risks, and project communication. In addition, relevant measures for human resources localization are proposed, taking the Indian project as an example.
文摘The Bangladeshi government signed a framework agreement with China for construction of a 220-km pipeline to carry oil from tankers in the Bay of Bengal to storage plants on Chinese mainland. Bangladesh's Economic Relations Department (ERD) Secretary Kazi Shofiqul Azam and Chinese Ambassador to Bangladesh Ma Mingqiang signed the framework agreement in the capital of Dhaka.
文摘On July 4 2002, a project attracting world attention, i.e., the West-East Gas Pipeline Project was declared in full-scale commencement. The project will write history with its enormous social and economic benefits.
文摘The West East pipeline project attracted the attention from all over the world for its long distance, huge diameter, complex geographic conditions, and diversified welding techniques being applied.In this paper the detail welding process and procedures used in the project are discussed and the distinguished achievements on welding techniques of China pipeline construction are described.
文摘A practical approach is discussed for sub-sea pipeline monitoring and leak detection based on the real time transient model . The characteristic method of transient simulation is coupled with the Extended Kalman Filter to estimate the system state where the only observed data are inlet and outlet flow rate and pressure. Because EKF has a time variant track under the non-stationary stochastic process with additive Gaussian noise, the high sensitivity of RTTM to non-stationary operating condition is reduced. A leak location recursion estimation formula is presented based on the real time observed data. The results of 27 groups of test data indicate that the procedure presented is sensitive to a wide range of detectable leak sizes and has a low average relative error of leak location .
文摘China and Kazakhstan are reviewing the possibil-ity of building a pipeline to deliver natural gas fromwestern Kazakhstan to Xinjiang Uygur AutonomousRegion,on China’s western border,to satisfy the
文摘The directional crossing drilling works were applied in the West East gas pipeline (WEGTP) project. The main researchs on the directional crossing drilling include:(1)to analyze the forces applied on the drilling tool and the failure mechanism in order to obtain the proper configuration of the drilling tool and solve the failure prevention;(2)to analyze the existing mud, to propose a viable mud composition;(3)in respect of mud mixing and environmental protection, to develop a quick cycloning mud hydration and recycling device;(4)to develop a interface picture software for direction controlling measured parameter to improve directional drilling accuracy; (5) to develop an electronic search software incorporating large amount of construction specifications and mud compositions, used for construction. In this paper the first one of the above mentioned points is introduced, including existing problems with directional drilling, optimization of the drilling tool, analysis of drill collar fracture failure, research on stress scattering structure of drilling tool thread and thread sticking prevention measures, etc.