期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Analysis on the Status Quo and Existing Problems of the Longgang River Basin Management
1
作者 Chen Chunxing 《Meteorological and Environmental Research》 CAS 2019年第5期117-118,124,共3页
In this paper,status quo of water pollution control in the Longgang River Basin is summarized,and the current status of water environment quality is analyzed,and the main problems in water environment management are d... In this paper,status quo of water pollution control in the Longgang River Basin is summarized,and the current status of water environment quality is analyzed,and the main problems in water environment management are discussed.The research aims to provide reference for the management of the Longgang River basin. 展开更多
关键词 The longgang river basin WATER ENVIRONMENT PROBLEM ANALYSIS
下载PDF
龙岗河流域2023年“9·7”极端特大暴雨洪涝反演分析
2
作者 林程 吴辉明 《水利发展研究》 2024年第10期117-125,共9页
深圳“9·7”极端特大暴雨导致龙岗流域发生严重洪涝灾害,由于该流域缺乏水文监测站,给洪涝分析和灾害复盘带来挑战。为明晰小尺度城市流域洪涝灾害特点,本研究结合现场调查和实测水位数据,采用实测降雨资料,修正暴雨等值线图参数,... 深圳“9·7”极端特大暴雨导致龙岗流域发生严重洪涝灾害,由于该流域缺乏水文监测站,给洪涝分析和灾害复盘带来挑战。为明晰小尺度城市流域洪涝灾害特点,本研究结合现场调查和实测水位数据,采用实测降雨资料,修正暴雨等值线图参数,推求流域各典型断面设计洪水,通过洪涝数学模型模拟演算,分析暴雨洪涝计算成果,并与流域设计洪水比较,给出2023年“9·7”龙岗河洪水等级。进一步剖析暴雨洪涝特性及成因,并围绕洪涝灾害防治中存在问题,提出从工程措施和非工程措施两个方面完善防洪体系对策建议,以期为高密度城市小尺度流域洪涝灾害防治工作提供参考。 展开更多
关键词 2023年“9·7”极端特大暴雨 洪水分析 洪涝模拟 龙岗河流域
下载PDF
Integrated river basin management in rapidly urbanizing areas:a case of Shenzhen,China 被引量:1
3
作者 Lei LIU Xiaoming MA 《Frontiers of Environmental Science & Engineering》 SCIE EI CSCD 2011年第2期243-254,共12页
The rapid urbanization of China is causing a burden on their water resources and hindering their sustainable development.This paper analyzes effective methods to integrated river basin management(IRBM)using Longgang R... The rapid urbanization of China is causing a burden on their water resources and hindering their sustainable development.This paper analyzes effective methods to integrated river basin management(IRBM)using Longgang River basin of Shenzhen as an example,which is the city with the fastest rate of urbanization in China and even the whole world.Over the past 20 years,China has undergone a population boom due to the increase of immigrant workers and rapid development of laborintensive industries,which led to the sharp increase of water consumption and sewage discharge.However,the construction of the water infrastructure is still lagging far behind the environmental and social development,with only 32.7%of sewage in the district being treated.Currently,every water quality indicator of the Longgang River basin was unable to meet the required corresponding environmental standards,which further aggravated the water shortages of the region.Thus,an analytical framework is proposed to address the IRBM of the study area.The problems with the current management system include the lack of decentralization in decision-making,lack of enforcement with redundant plans,weak management capacity,financial inadequacy,and a poor system of stakeholder participation.In light of the principles of IRBM and the situation of the region,corresponding measures are put forward,including an increase of power given to sub-district offices,fewer but more feasible plans,capacity building among stakeholders,a combination of planning and marketing for overcoming financial inadequacy,and profound reform in the public participation system.The framework and institutional suggestions could inform similar processes in other representative river basins. 展开更多
关键词 integrated river basin management(IRBM)model longgang river basin SHENZHEN DECENTRALIZATION stakeholder participation
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部