In the light of the historical substantial data (covering a 70-year period) collected in the Lower Jingjiang segment and aided by topological grey method, here we attempt to characterize the occurrence and future tren...In the light of the historical substantial data (covering a 70-year period) collected in the Lower Jingjiang segment and aided by topological grey method, here we attempt to characterize the occurrence and future trend of flood calamities in the study area. Our findings indicate that overall the high-frequent flood disasters with middle to lower damage prevail at present. A series of dramatic flood waves will appear in the years of 2016, 2022, 2030 and 2042, particularly a destructive flood will occur between 2041 and 2045 in the Lower Jingjiang reaches. Typical of sensitive response to flood hazards in close association with its special geographical location, the lower Jingjiang segment hereby can reflect the development trend of floods in the middle Yangtze reaches. According to the results, a good fitness was revealed between the prediction and practical values. This actually hints that the topological grey method is an effective mathematical means of resolving problems containing uncertainty and indetermination, thus providing valuable information for the flood prediction in the middle Yangtze catchment.展开更多
River cutoff works have been implemented on Lower Jingjiang section for 30 years. Engineering practices have shown that channel straightening has been the river regulation measure for the permanent control of the mean...River cutoff works have been implemented on Lower Jingjiang section for 30 years. Engineering practices have shown that channel straightening has been the river regulation measure for the permanent control of the meandering Lower Jingjiang section. River cutoff have been carried out in accordance with the evolution property of meandering rivers and these works have brought about expected benefits. It has also been noted that certain aspects in river cutoff had not been fully understood. River cutoff is a dynamic engineering. River channel evolution properties shall be fully understood so as to adroitly guide actions according to circumstances in cutoff works. In addition, river channel evolution observation and engineering effectiveness monitoring should be strengthened with a view to update the designs. The diversion canals for channel shortening are of great importance that will account for the success or failure of river cutoff works. The newly formed river channels and the river regime control works on the adjacent upper and lower reaches are guarantees for river cutoff works to be brought into play in the long run.展开更多
Geomorphic dynamics of alluvial rivers in response to upstream damming have substantial impacts on navigation, habitat protection, and channel stability. The purpose of this study was to determine how flow and sedimen...Geomorphic dynamics of alluvial rivers in response to upstream damming have substantial impacts on navigation, habitat protection, and channel stability. The purpose of this study was to determine how flow and sediment regimes, and meander characteristics affect the morphological adjustment of bends in the Lower Jingjiang Reach(LJR) before and after the Three Gorges Project(TGP). Based on detailed field measurements and hydrological and topographic datasets from 1991 to 2016, banks and point bars morphodynamics of 12continuous bends in the LJR were comprehensively analyzed. Point bars in the LJR mainly experienced a net deposition before the TGP operation, but substantially deteriorated with a net erosion rate of 4.6 million m^(3) yr^(-1) in the post-TGP periods(2003–2016), and erosion on heads and upstream margins of point bars was a general adjustment pattern in the 12 bends.The most significant morphological changes of point bars and banks occurred in 2006–2011,indicating a delayed response of the channel evolution of the LJR to damming. Detailed observations suggested that the medium discharges(16,000–18,000 m^(3) s^(-1)) were the most contributive discharges in shaping the morphology of point bars and banks in the LJR after damming. In addition, we revealed the importance of sediment supply on meander deformation of the LJR, driven by sediment exchange over point bars, and more upstream planform deformation tended to occur in bends with high sinuosity(>2.0) in the LJR after damming.The relationship between meander deformation and sinuosity was manifested through the geometric adjustment range of point bars. The morphological adjustments of point bars in the highly curved or compound bends of the LJR were more conducive to cause flow deflections,leading to form concave-bank bars after the TGP operation.展开更多
文摘In the light of the historical substantial data (covering a 70-year period) collected in the Lower Jingjiang segment and aided by topological grey method, here we attempt to characterize the occurrence and future trend of flood calamities in the study area. Our findings indicate that overall the high-frequent flood disasters with middle to lower damage prevail at present. A series of dramatic flood waves will appear in the years of 2016, 2022, 2030 and 2042, particularly a destructive flood will occur between 2041 and 2045 in the Lower Jingjiang reaches. Typical of sensitive response to flood hazards in close association with its special geographical location, the lower Jingjiang segment hereby can reflect the development trend of floods in the middle Yangtze reaches. According to the results, a good fitness was revealed between the prediction and practical values. This actually hints that the topological grey method is an effective mathematical means of resolving problems containing uncertainty and indetermination, thus providing valuable information for the flood prediction in the middle Yangtze catchment.
文摘River cutoff works have been implemented on Lower Jingjiang section for 30 years. Engineering practices have shown that channel straightening has been the river regulation measure for the permanent control of the meandering Lower Jingjiang section. River cutoff have been carried out in accordance with the evolution property of meandering rivers and these works have brought about expected benefits. It has also been noted that certain aspects in river cutoff had not been fully understood. River cutoff is a dynamic engineering. River channel evolution properties shall be fully understood so as to adroitly guide actions according to circumstances in cutoff works. In addition, river channel evolution observation and engineering effectiveness monitoring should be strengthened with a view to update the designs. The diversion canals for channel shortening are of great importance that will account for the success or failure of river cutoff works. The newly formed river channels and the river regime control works on the adjacent upper and lower reaches are guarantees for river cutoff works to be brought into play in the long run.
基金Key Program of National Natural Science Foundation of China,No.U2040219National Natural Science Foundation of China,No.51579015Program of National Key Research and Development Plan of China,No.2016YFC0402108, No.2016YFC0402103。
文摘Geomorphic dynamics of alluvial rivers in response to upstream damming have substantial impacts on navigation, habitat protection, and channel stability. The purpose of this study was to determine how flow and sediment regimes, and meander characteristics affect the morphological adjustment of bends in the Lower Jingjiang Reach(LJR) before and after the Three Gorges Project(TGP). Based on detailed field measurements and hydrological and topographic datasets from 1991 to 2016, banks and point bars morphodynamics of 12continuous bends in the LJR were comprehensively analyzed. Point bars in the LJR mainly experienced a net deposition before the TGP operation, but substantially deteriorated with a net erosion rate of 4.6 million m^(3) yr^(-1) in the post-TGP periods(2003–2016), and erosion on heads and upstream margins of point bars was a general adjustment pattern in the 12 bends.The most significant morphological changes of point bars and banks occurred in 2006–2011,indicating a delayed response of the channel evolution of the LJR to damming. Detailed observations suggested that the medium discharges(16,000–18,000 m^(3) s^(-1)) were the most contributive discharges in shaping the morphology of point bars and banks in the LJR after damming. In addition, we revealed the importance of sediment supply on meander deformation of the LJR, driven by sediment exchange over point bars, and more upstream planform deformation tended to occur in bends with high sinuosity(>2.0) in the LJR after damming.The relationship between meander deformation and sinuosity was manifested through the geometric adjustment range of point bars. The morphological adjustments of point bars in the highly curved or compound bends of the LJR were more conducive to cause flow deflections,leading to form concave-bank bars after the TGP operation.