Presents the new techniques leading to the improvements in aerodynamics of 200MW steam turbine high pressure cylinder and mid pressure cylinder, discusses the rear loaded profile and blade bowing, and concludes from n...Presents the new techniques leading to the improvements in aerodynamics of 200MW steam turbine high pressure cylinder and mid pressure cylinder, discusses the rear loaded profile and blade bowing, and concludes from numerical simulation and experimental results that the application of rear loaded profile and blade bowing has improved the performance of 200 MW unit.展开更多
The 300 MW steam turbine installed in Waigaoqiao Power Plant with combined HPIP cylinders of double casing structure is a product of the Shanghai Turbine Works utilizing licensed technology. It has a large heat storag...The 300 MW steam turbine installed in Waigaoqiao Power Plant with combined HPIP cylinders of double casing structure is a product of the Shanghai Turbine Works utilizing licensed technology. It has a large heat storage capacity and good thermal insulation, so the metal temperature of first stage of HP cylinder (FSMTI) may reach 400-450℃ after shut down and it takes 7-8 days to cool to 150℃ by natural cooling, Now with a forced cooling system the cooling time may be reduced to 40 hours, so that the turbine may be opened for repair work in about 5-6 days. The cooling system for #2 unit and test procedure are briefly described below.展开更多
文摘Presents the new techniques leading to the improvements in aerodynamics of 200MW steam turbine high pressure cylinder and mid pressure cylinder, discusses the rear loaded profile and blade bowing, and concludes from numerical simulation and experimental results that the application of rear loaded profile and blade bowing has improved the performance of 200 MW unit.
文摘The 300 MW steam turbine installed in Waigaoqiao Power Plant with combined HPIP cylinders of double casing structure is a product of the Shanghai Turbine Works utilizing licensed technology. It has a large heat storage capacity and good thermal insulation, so the metal temperature of first stage of HP cylinder (FSMTI) may reach 400-450℃ after shut down and it takes 7-8 days to cool to 150℃ by natural cooling, Now with a forced cooling system the cooling time may be reduced to 40 hours, so that the turbine may be opened for repair work in about 5-6 days. The cooling system for #2 unit and test procedure are briefly described below.