期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
风电基地升压站500kV电气主接线方式优化 被引量:1
1
作者 刘彦杰 许云飞 +1 位作者 赵鹏 李天 《东北电力技术》 2014年第1期13-15,22,共4页
针对东北及蒙东地区规划与在建GW级风电基地500 kV汇集升压站主要采用以点对网方式接入系统运行特点,以在建工程为例,运用全寿命周期理念对汇集升压站500 kV电气主接线进行优化,通过对2种方式全寿命周期成本比较,推荐采用扩大单元线路... 针对东北及蒙东地区规划与在建GW级风电基地500 kV汇集升压站主要采用以点对网方式接入系统运行特点,以在建工程为例,运用全寿命周期理念对汇集升压站500 kV电气主接线进行优化,通过对2种方式全寿命周期成本比较,推荐采用扩大单元线路变压器组接线方式,可较大降低工程造价、减少项目运维及拆除成本。经进一步优化及智能设备整合可作为智能汇集升压站500 kV通用主接线,体现了设计新技术方向。 展开更多
关键词 风电基地 汇集升压站 500 kV电气主接线 全寿命周期 智能整合
下载PDF
Grounding Systems for Power Supply Facilities
2
作者 Vladimir Anatolevich Konusarov Evgeniy Alekseevich Shutov Tatyana Evgenievna Turukina 《Energy and Power Engineering》 2019年第1期1-14,共14页
The goal of this work is creation of optimal grounding model at the substation 10/0.4 kV of the urban power distribution network. The electric current can pose a major threat to the man’s life and health. In addition... The goal of this work is creation of optimal grounding model at the substation 10/0.4 kV of the urban power distribution network. The electric current can pose a major threat to the man’s life and health. In addition to pose a threat for health, the rise of the short circuit, as a consequence of insulation faults, poses a threat to retirement of electric systems and fire risks. The reliable grounding system design has significant implications for protection of human being as well as for electrical facility protection. The set objective was performed on the base of analytical and software-based methods. Analytical method gives a qualitative indication at each step in analysis. It also allows evaluating the values effect on the result, but the method is not susceptible of tolerable accuracy, that is why analytical method serves as initial approximation in differentiating. Specified estimation can be performed in such software package as MATLAB or ETAP. Software-based estimation is based on the finite element method (FEM), the main advantage of which is the ability to create different forms of grounding and allows obtaining distribution graphs of the step potential on the earth’s surface and touch potential. The calculation results in comparison of analytical and software-based methods taking into account the grounding optimization. There are conclusions on the most effective ground network. 展开更多
关键词 Grounding Device Current-Using Equipment Short-Circuit FAULT Single Phase-to-Ground FAULT main step down substation (msds) TN-C TN-S TN-C-S TT IT Indirect Contact step Potential FEM IEEE
下载PDF
220kV降压变电站一次部分设计 被引量:1
3
作者 赖学胜 何利力 《电工技术》 2019年第7期51-52,54,共3页
介绍了220kV降压变电站主接线和变压器选型等电气一次部分设计,通过对变电站短路电流的计算,分析了断电路和隔离开关的选择。
关键词 降压变电站 变压器 电路主线路 电气一次设计
下载PDF
火电厂内1000kV升压站的现场安装技术
4
作者 李健豪 商政 +1 位作者 贺彦鹏 易海波 《电力勘测设计》 2021年第9期58-63,共6页
某火电厂内升压站采用1000 kV气体绝缘金属封闭开关设备(GIS)及1000 kV主变压器的方案,介绍该工程中1000 kV主变运输及卸车、主变安装、GIS安装、GIS防尘安装管理等现场安装技术,提出主变运输卸车与其它施工工序交叉的控制措施,以及利... 某火电厂内升压站采用1000 kV气体绝缘金属封闭开关设备(GIS)及1000 kV主变压器的方案,介绍该工程中1000 kV主变运输及卸车、主变安装、GIS安装、GIS防尘安装管理等现场安装技术,提出主变运输卸车与其它施工工序交叉的控制措施,以及利用多级防尘措施及防尘房进行GIS防尘安装作业,从而使安装工作顺利进行,为工程投运提供保障。 展开更多
关键词 火电厂 1000kV升压站 主变压器 GIS 防尘房
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部