This paper concerns the robust non-fragile guaranteed cost control for nonlinear time delay discrete-time systems based on Takagi-Sugeno (T-S) model. The problem is to design a guaranteed cost state feedback control...This paper concerns the robust non-fragile guaranteed cost control for nonlinear time delay discrete-time systems based on Takagi-Sugeno (T-S) model. The problem is to design a guaranteed cost state feedback controller which can tolerate uncertainties from both models and gain variation. Sufficient conditions for the existence of such controller are given based on the linear matrix inequality (LMI) approach combined with Lyapunov method and inequality technique. A numerical example is given to illustrate the feasibility and effectiveness of our result.展开更多
An objective function model is proposed for cost in optimizing and allocating tolerance with consideration of manufacturing conditions. With the fuzzy comprehensive evaluation method,a manufacturing difficulty coeffic...An objective function model is proposed for cost in optimizing and allocating tolerance with consideration of manufacturing conditions. With the fuzzy comprehensive evaluation method,a manufacturing difficulty coefficient is derived,which takes into account of several factors affecting the manufacturing cost,including the forming means of the blank,size,machining surface features,operator’s skills and machinability of materials. The coefficient is then converted into a weight factor used in the inversed square model representing the relationship between the cost and tolerance,and,hence,an objective function for cost is established in optimizing and allocating tolerance. The higher is the manufacturing difficulty coefficient,the higher is the relative manufacturing cost and the higher is the weight factor of the tolerance allocation,which indicates the increase of the tolerance’s effects on the total manufacturing cost and,therefore,a larger tolerance should be allocated. The computer-aided tolerance allocation utilizing this model makes it more convenient,accurate and practicable.展开更多
The goal of the research is to develop a methodology to minimize the public’s exposure to harmful emissions from coal power plants while maintaining minimal operational costs related to electric distribution losses a...The goal of the research is to develop a methodology to minimize the public’s exposure to harmful emissions from coal power plants while maintaining minimal operational costs related to electric distribution losses and coal logistics. The objective is achieved by combining EPA Screen3, ISC3 and Japanese METI-LIS model equations with minimum spanning tree (MST) algorithm. Prim’s MST algorithm is used to simulate an electric distribution system and coal transportation pathways. The model can detect emission interaction with another source and estimate the ground level concentrations of emissions up to distances of 25 kilometers. During a grid search, the algorithm helps determine a candidate location, for a new coal power plant, that would minimize the operational cost while ensuring emission exposure is below the EPA/NIOSH thresholds. The proposed methodology has been coded in form of a location analysis simulation. An exhaustive search strategy delivers a final candidate location for a new coal power plant to ensure minimum operational costs as compared to the random or greedy search strategy. The simulation provides a tool to industrial zone planners, environmental engineers, and stakeholders in coal-based power generation. Using operational and emissions perspectives, the tool helps ascertain a list of compromise locations for a new coal power plant facility.展开更多
文摘This paper concerns the robust non-fragile guaranteed cost control for nonlinear time delay discrete-time systems based on Takagi-Sugeno (T-S) model. The problem is to design a guaranteed cost state feedback controller which can tolerate uncertainties from both models and gain variation. Sufficient conditions for the existence of such controller are given based on the linear matrix inequality (LMI) approach combined with Lyapunov method and inequality technique. A numerical example is given to illustrate the feasibility and effectiveness of our result.
文摘An objective function model is proposed for cost in optimizing and allocating tolerance with consideration of manufacturing conditions. With the fuzzy comprehensive evaluation method,a manufacturing difficulty coefficient is derived,which takes into account of several factors affecting the manufacturing cost,including the forming means of the blank,size,machining surface features,operator’s skills and machinability of materials. The coefficient is then converted into a weight factor used in the inversed square model representing the relationship between the cost and tolerance,and,hence,an objective function for cost is established in optimizing and allocating tolerance. The higher is the manufacturing difficulty coefficient,the higher is the relative manufacturing cost and the higher is the weight factor of the tolerance allocation,which indicates the increase of the tolerance’s effects on the total manufacturing cost and,therefore,a larger tolerance should be allocated. The computer-aided tolerance allocation utilizing this model makes it more convenient,accurate and practicable.
文摘The goal of the research is to develop a methodology to minimize the public’s exposure to harmful emissions from coal power plants while maintaining minimal operational costs related to electric distribution losses and coal logistics. The objective is achieved by combining EPA Screen3, ISC3 and Japanese METI-LIS model equations with minimum spanning tree (MST) algorithm. Prim’s MST algorithm is used to simulate an electric distribution system and coal transportation pathways. The model can detect emission interaction with another source and estimate the ground level concentrations of emissions up to distances of 25 kilometers. During a grid search, the algorithm helps determine a candidate location, for a new coal power plant, that would minimize the operational cost while ensuring emission exposure is below the EPA/NIOSH thresholds. The proposed methodology has been coded in form of a location analysis simulation. An exhaustive search strategy delivers a final candidate location for a new coal power plant to ensure minimum operational costs as compared to the random or greedy search strategy. The simulation provides a tool to industrial zone planners, environmental engineers, and stakeholders in coal-based power generation. Using operational and emissions perspectives, the tool helps ascertain a list of compromise locations for a new coal power plant facility.