The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial u...The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial use.The water source area of the MR-SNWDP is the region that is most sensitive to and most affected by the construction of this water diversion project.In this study,we used Landsat Thematic Mapper(TM)and HJ-1 A/B images from 2000 to 2015 by an object-based approach with a hierarchical classification method for mapping land cover in the water source area.The changes in land cover were illuminated by transfer matrixes,single dynamic degree,slope zones and fractional vegetation cover(FVC).The results indicated that the area of cropland decreased by 31%and was replaced mainly by shrub over the past 15 years,whereas forest and settlements showed continuous increases of 29.2% and 77.7%,respectively.The changes in cropland were obvious in all slope zones and decreased most remarkably(–43.8%)in the slope zone above 25°.Compared to the FVC of forest and shrub,significant improvement was exhibited in the FVC of grassland,with a growth rate of 16.6%.We concluded that local policies,including economic development,water conservation and immigration resulting from the construction of the MR-SNWDP,were the main drivers of land cover changes;notably,they stimulated the substantial and rapid expansion of settlements,doubled the wetlands and drove the transformation from cropland to settlements in immigration areas.展开更多
This paper assess the eco-environmental benefits that may come from the middle route project of China's South-North Water Transfer Scheme(SNWT) with principles and methods of eco-economics and planning reports of ...This paper assess the eco-environmental benefits that may come from the middle route project of China's South-North Water Transfer Scheme(SNWT) with principles and methods of eco-economics and planning reports of SNWT's middle route project. Some benefits were calculated in monetary units. To make sure that the results can be comparable with normal monetary indices, concrete assessment objects and the parameters are prudently selected according to the major characteristics of the project and its water import region. Primary assessment revealed that in different project construction stages, the benefit could be more than 13 07 billion RMB Yuan in 2010 and 19 79 billion RMB Yuan in 2030, respectively. The monetary value tends to increase with social-economic development. To realize these potential benefits, however, calls for more endeavors.展开更多
Previous research shows that there is a strong correlation between saltwater intrusion in the Yangtze Estuary and discharge at Datong. In the near future, the discharge of the Yangtze River during dry seasons will dec...Previous research shows that there is a strong correlation between saltwater intrusion in the Yangtze Estuary and discharge at Datong. In the near future, the discharge of the Yangtze River during dry seasons will decrease due to the construction and operation of large water diversion projects, including the South-to-North Water Transfer Project, which will further exacerbate saltwater intrusion in the estuary. In this paper, a nested 1D river network model and a 2D saltwater numerical model are used to associate saltwater intrusion in the Yangtze Estuary with different values of discharge at Datong. It is concluded that 13 000 m3/s is the critical discharge at Datong for preventing saltwater intrusion and controlling the volume of water transferred by the South-to-North Water Transfer Project. Furthermore, based on the analysis of river discharge from Datong to Xuliujing and in consideration of the influence of all of the water diversion projects, operation schemes are proposed for the Eastern Route of the South-to-North Water Transfer Project for different hydrological years.展开更多
In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel...In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel boring machine (TBM). The classification standard of surrounding rocks is put forward on the basis of physical simulations and engineering practices. Damage, deformation and evolution of surrounding rocks induced by TBM excavation are discussed. Meanwhile, the long-term deformation mechanisms and stability of surrounding rocks are also studied. On this basis, a three-dimensional constitutive model for interbedded sandstone slate and a fiat shell-joint element-foundation system for calculating internal forces of segment lining are established. The deformation features of surrounding rocks of deep and steep interbedded sandstone slate and their influences on internal forces of segment lining are presented. Finally, the design methods of segment lining constructed in deep and steep flysch are proposed.展开更多
Objective To recognize and assess the impact of the South-to-north Water Transfer Project (SNWTP) on the ecological environment of Xiangfan, Hubei Province, situated in the water-out area, and develop sound scientific...Objective To recognize and assess the impact of the South-to-north Water Transfer Project (SNWTP) on the ecological environment of Xiangfan, Hubei Province, situated in the water-out area, and develop sound scientific countermeasures. Methods A three-layer BP network was built to simulate topology and process of the eco-economy system of Xiangfan. Historical data of ecological environmental factors and socio-economic factors as inputs, and corresponding historical data of ecosystem service value (ESV) and GDP as target outputs, were presented to train and test the network. When predicted input data after 2001 were presented to trained network as generalization sets, ESVs and GDPs of 2002, 2003, 2004... till 2050 were simulated as output in succession. Results Up to 2050, the area would have suffered an accumulative total ESV loss of RMB 104.9 billion, which accounted for 37.36% of the present ESV. The coinstantaneous GDP would change asynchronously with ESV, it would go through an up-to-down process and finally lose RMB89.3 billion, which accounted for 18.71% of 2001. Conclusions The simulation indicates that ESV loss means damage to the capability of socio-economic sustainable development, and suggests that artificial neural networks (ANNs) provide a feasible and effective method and have an important potential in ESV modeling.展开更多
The factors influencing the water supply price of a hydraulic project include natural conditions and economic policies. This paper thoroughly demonstrates the water price of South-to-North Water Transfer Project from ...The factors influencing the water supply price of a hydraulic project include natural conditions and economic policies. This paper thoroughly demonstrates the water price of South-to-North Water Transfer Project from the viewpoint of economic policies. It is considered that if the project is assigned as a profitable one and built depending on commercial loan from bank completely or mostly, the water price will be too high to be undertaken by users,and if the project places the public good at first while considering the economic benefit, its investment mainly relies on the state (national or local governments) appropriation and self-raised funds and a little from the bank loan on favorable terms, the price determined according to the principle of satisfying the cost and reasonable profit will be relatively lower and can be undertaken by the users in the North China where water shortage is serious. The problem of higher water price of agricultural irrigation to the north of the Yellow River can be tackled by taking measures such as "compensating agriculture by industry" according to foreign practical experiences and relevant suggestions.展开更多
The over-exploitation of water resources in the Haihe River Basin (HRB) has now become a serious problem. This is clearly evidenced by the fact that many local rivers and lakes are drying up and the total amount of ...The over-exploitation of water resources in the Haihe River Basin (HRB) has now become a serious problem. This is clearly evidenced by the fact that many local rivers and lakes are drying up and the total amount of over-exploited groundwater has reached over 1000×10^8m^3. It is important to note that the exploitation of water resources in HRB was reasonable before 1979. After 1980, however, over-exploitation happened with an annual average amount of 40×10^8m^3. Both the dry season and rapid economic growth in HRB took place at the same time. Therefore, the over-exploitation of water in HRB was actually the negative result of the conjunction of a continuous dry season and rapid economic growth. So the over-exploitation would not be as serious as it is today if either of the above two stopped. After the first stage of south-to-north water transfer project, the water shortage problem in HRB could be eased for the following reasons: firstly, water transfer project will bring to the Basin 60x108m3 water resources; secondly, a wet season will come back eventually according to natural law of climate variability; finally, its agricultural and industrial use and total water consumption all have decreased from the peak value, so that the groundwater table will raise certainly and ecological water in rivers and lakes that were dried-up will be partly restored. In the future, the main problem of water resources security in HRB will include water pollution, operation risk of the south-to-north water transfer project, groundwater pollution and engineering geological hazards that may be brought by groundwater rise. The proposed countermeasures are as follows: keeping strengthening water demand management, raising water price as well as subsidies for the low- income family and improving other water related policies, preventing and dealing with water pollution seriously and getting fully prepared for the operation of south-to-north water transfer project.展开更多
The unsteady flow in the Middle Route South-to-North Water Transfer Channel was simulated numerically using an implicit solution procedure for the Saint Venant equations. An equivalent roughness was used to simulate t...The unsteady flow in the Middle Route South-to-North Water Transfer Channel was simulated numerically using an implicit solution procedure for the Saint Venant equations. An equivalent roughness was used to simulate the effect of many transfer structures on the water levels in the main channel. Various gate operating and control methods were analyzed to study the response to disturbances produced by varying the flow rates through the Tianjin outlet. The results show that when the inflow at the head changes in the same way as the sum of the flow rates through all the outlets, the transition time and the fluctuation of the water levels using the timed gate operation method are less than when using the simultaneous gate operation method, but the variations of the gate openings and flow rates through each control gate are much larger. The flow disturbances produced by the Tianjin outlet can be rectified within several channel sections and the transition time can be greatly shortened by allowing the water levels immediately upstream of the control gates to vary within proscribed ranges, rather than being held constant.展开更多
选择南水北调中线工程沿线邯郸、正定、涿州为代表地区,利用1979-2021年冬季逐日气温数据,分析各代表区气温序列统计频率分布与理论概率分布的拟合情况,提出标准化温度指数(standardized temperature index,STI),并据此建立新的冬季冷...选择南水北调中线工程沿线邯郸、正定、涿州为代表地区,利用1979-2021年冬季逐日气温数据,分析各代表区气温序列统计频率分布与理论概率分布的拟合情况,提出标准化温度指数(standardized temperature index,STI),并据此建立新的冬季冷暖量化评估模型。结果表明:STI方法与国标法的冬季冷暖评估结果基本一致,但在各代表区强冷冬和强暖冬划定上,STI评估得出的年份数量均少于国标法;各代表区以1月份气温计算得出的冷暖等级阈值对应的气温值均明显低于按整个冬季3个月计算结果。工程所在纬度越高,冬季冷暖等级阈值对应的气温值越低;根据STI评估结果,邯郸、正定、涿州发生强冷冬概率分别为7.14%、9.52%和4.76%,发生弱冷冬及以上的概率分别为38.09%、40.48%和38.09%,发生平冬的概率分别为21.43%、28.57%和21.43%,发生弱暖冬及以上的概率分别为40.48%、30.95%和40.48%,发生强暖冬的概率分别为4.76%、7.14%和2.38%。研究成果与基于正态分布的国标法相比,考虑了气温序列的偏态性概率分布特征,对相对冷暖的判别更科学,有推广应用价值。展开更多
The Western Route of the South-to-North Water Transfer Project will divert water from the upper Yangtze River and its tributaries, the Dadu River and Yalong River, to the upper Yellow River. The project may ease the w...The Western Route of the South-to-North Water Transfer Project will divert water from the upper Yangtze River and its tributaries, the Dadu River and Yalong River, to the upper Yellow River. The project may ease the water shortage in the Yellow River Basin. However, it may also have some effects on the ecosystem in the upper Yangtze River Basin. Benthic invertebrates play an important role in the river ecosystem, particularly in the circulation of materials and nutrition. Benthic invertebrates are widely used to quickly assess river ecosystems because of their rapid response to changes in the water environment. The diversity of benthic invertebrates is closely associated with the aquatic habitat area. This study examined this interaction by sampling the benthic invertebrates in an expanding area. The conclusions are that the diversity of benthic invertebrates begins to decrease when the aquatic habitat area is reduced to 45% of the original area, and decreases dramatically when the aquatic habitat area is reduced to 10% of the original area. The aquatic habitat area should be kept at more than 45% of the original area in order to maintain the significant diversity of benthic invertebrates.展开更多
To evaluate the ecological effects of lakeshore wetland rehabilitation on the eastern route of the Southto-NorthWater Transfer Project,species composition,coverage,height,and biomass of wetland communities at 22 sites...To evaluate the ecological effects of lakeshore wetland rehabilitation on the eastern route of the Southto-NorthWater Transfer Project,species composition,coverage,height,and biomass of wetland communities at 22 sites of the study area on the shore of Nansi Lake in April and May 2007 were investigated.The wetlands under investigation were divided into platform fields,transition zones,and shallow water zones according to differences in elevations,water levels,and human activities.The species richness index,Shannon-Wiener index,Simpson index,and Pielou Evenness index were adopted to delineate and discuss the ecological effects of lakeshore wetland rehabilitation in 22 quadrates.Results showed that the species richness of the wetland areas after 2 years’rehabilitation amounted to 47 of 24 families,higher than 25 of 20 families in areas without rehabilitation.The biodiversity index and abundance index of rehabilitated areas were also higher than those of platform fields and fish ponds where there was no rehabilitation.In addition,the Shannon-Wiener index,Simpson index,and community evenness index of platform fields in rehabilitated wetland areas were 1.619,0.745,and 0.860,respectively,higher than those of the platform fields before rehabilitating.The results suggested that the constructed lakeshore wetland played an important role in protecting the diversity of species.展开更多
基金Under the auspices of the National Key Research and Development Program of China(No.2016YFC0500201-01)National Natural Science Foundation of China(No.41671365,41771464)the Annual Project of the Office of the South-to-North Water Diversion Project(No.2018-21)
文摘The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial use.The water source area of the MR-SNWDP is the region that is most sensitive to and most affected by the construction of this water diversion project.In this study,we used Landsat Thematic Mapper(TM)and HJ-1 A/B images from 2000 to 2015 by an object-based approach with a hierarchical classification method for mapping land cover in the water source area.The changes in land cover were illuminated by transfer matrixes,single dynamic degree,slope zones and fractional vegetation cover(FVC).The results indicated that the area of cropland decreased by 31%and was replaced mainly by shrub over the past 15 years,whereas forest and settlements showed continuous increases of 29.2% and 77.7%,respectively.The changes in cropland were obvious in all slope zones and decreased most remarkably(–43.8%)in the slope zone above 25°.Compared to the FVC of forest and shrub,significant improvement was exhibited in the FVC of grassland,with a growth rate of 16.6%.We concluded that local policies,including economic development,water conservation and immigration resulting from the construction of the MR-SNWDP,were the main drivers of land cover changes;notably,they stimulated the substantial and rapid expansion of settlements,doubled the wetlands and drove the transformation from cropland to settlements in immigration areas.
文摘This paper assess the eco-environmental benefits that may come from the middle route project of China's South-North Water Transfer Scheme(SNWT) with principles and methods of eco-economics and planning reports of SNWT's middle route project. Some benefits were calculated in monetary units. To make sure that the results can be comparable with normal monetary indices, concrete assessment objects and the parameters are prudently selected according to the major characteristics of the project and its water import region. Primary assessment revealed that in different project construction stages, the benefit could be more than 13 07 billion RMB Yuan in 2010 and 19 79 billion RMB Yuan in 2030, respectively. The monetary value tends to increase with social-economic development. To realize these potential benefits, however, calls for more endeavors.
基金supported by the National Natural Science Foundation of China (Grant No 50339010)
文摘Previous research shows that there is a strong correlation between saltwater intrusion in the Yangtze Estuary and discharge at Datong. In the near future, the discharge of the Yangtze River during dry seasons will decrease due to the construction and operation of large water diversion projects, including the South-to-North Water Transfer Project, which will further exacerbate saltwater intrusion in the estuary. In this paper, a nested 1D river network model and a 2D saltwater numerical model are used to associate saltwater intrusion in the Yangtze Estuary with different values of discharge at Datong. It is concluded that 13 000 m3/s is the critical discharge at Datong for preventing saltwater intrusion and controlling the volume of water transferred by the South-to-North Water Transfer Project. Furthermore, based on the analysis of river discharge from Datong to Xuliujing and in consideration of the influence of all of the water diversion projects, operation schemes are proposed for the Eastern Route of the South-to-North Water Transfer Project for different hydrological years.
基金Supported by the National Key Technology R&D Program in the 11th Five-year Plan of China (2006BAB04A06)
文摘In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel boring machine (TBM). The classification standard of surrounding rocks is put forward on the basis of physical simulations and engineering practices. Damage, deformation and evolution of surrounding rocks induced by TBM excavation are discussed. Meanwhile, the long-term deformation mechanisms and stability of surrounding rocks are also studied. On this basis, a three-dimensional constitutive model for interbedded sandstone slate and a fiat shell-joint element-foundation system for calculating internal forces of segment lining are established. The deformation features of surrounding rocks of deep and steep interbedded sandstone slate and their influences on internal forces of segment lining are presented. Finally, the design methods of segment lining constructed in deep and steep flysch are proposed.
文摘Objective To recognize and assess the impact of the South-to-north Water Transfer Project (SNWTP) on the ecological environment of Xiangfan, Hubei Province, situated in the water-out area, and develop sound scientific countermeasures. Methods A three-layer BP network was built to simulate topology and process of the eco-economy system of Xiangfan. Historical data of ecological environmental factors and socio-economic factors as inputs, and corresponding historical data of ecosystem service value (ESV) and GDP as target outputs, were presented to train and test the network. When predicted input data after 2001 were presented to trained network as generalization sets, ESVs and GDPs of 2002, 2003, 2004... till 2050 were simulated as output in succession. Results Up to 2050, the area would have suffered an accumulative total ESV loss of RMB 104.9 billion, which accounted for 37.36% of the present ESV. The coinstantaneous GDP would change asynchronously with ESV, it would go through an up-to-down process and finally lose RMB89.3 billion, which accounted for 18.71% of 2001. Conclusions The simulation indicates that ESV loss means damage to the capability of socio-economic sustainable development, and suggests that artificial neural networks (ANNs) provide a feasible and effective method and have an important potential in ESV modeling.
文摘The factors influencing the water supply price of a hydraulic project include natural conditions and economic policies. This paper thoroughly demonstrates the water price of South-to-North Water Transfer Project from the viewpoint of economic policies. It is considered that if the project is assigned as a profitable one and built depending on commercial loan from bank completely or mostly, the water price will be too high to be undertaken by users,and if the project places the public good at first while considering the economic benefit, its investment mainly relies on the state (national or local governments) appropriation and self-raised funds and a little from the bank loan on favorable terms, the price determined according to the principle of satisfying the cost and reasonable profit will be relatively lower and can be undertaken by the users in the North China where water shortage is serious. The problem of higher water price of agricultural irrigation to the north of the Yellow River can be tackled by taking measures such as "compensating agriculture by industry" according to foreign practical experiences and relevant suggestions.
基金supported by the National Natural Sciences Fund of China (40971298)
文摘The over-exploitation of water resources in the Haihe River Basin (HRB) has now become a serious problem. This is clearly evidenced by the fact that many local rivers and lakes are drying up and the total amount of over-exploited groundwater has reached over 1000×10^8m^3. It is important to note that the exploitation of water resources in HRB was reasonable before 1979. After 1980, however, over-exploitation happened with an annual average amount of 40×10^8m^3. Both the dry season and rapid economic growth in HRB took place at the same time. Therefore, the over-exploitation of water in HRB was actually the negative result of the conjunction of a continuous dry season and rapid economic growth. So the over-exploitation would not be as serious as it is today if either of the above two stopped. After the first stage of south-to-north water transfer project, the water shortage problem in HRB could be eased for the following reasons: firstly, water transfer project will bring to the Basin 60x108m3 water resources; secondly, a wet season will come back eventually according to natural law of climate variability; finally, its agricultural and industrial use and total water consumption all have decreased from the peak value, so that the groundwater table will raise certainly and ecological water in rivers and lakes that were dried-up will be partly restored. In the future, the main problem of water resources security in HRB will include water pollution, operation risk of the south-to-north water transfer project, groundwater pollution and engineering geological hazards that may be brought by groundwater rise. The proposed countermeasures are as follows: keeping strengthening water demand management, raising water price as well as subsidies for the low- income family and improving other water related policies, preventing and dealing with water pollution seriously and getting fully prepared for the operation of south-to-north water transfer project.
基金Supported by China Postdoctoral Science Foundation (No. 20060390078)
文摘The unsteady flow in the Middle Route South-to-North Water Transfer Channel was simulated numerically using an implicit solution procedure for the Saint Venant equations. An equivalent roughness was used to simulate the effect of many transfer structures on the water levels in the main channel. Various gate operating and control methods were analyzed to study the response to disturbances produced by varying the flow rates through the Tianjin outlet. The results show that when the inflow at the head changes in the same way as the sum of the flow rates through all the outlets, the transition time and the fluctuation of the water levels using the timed gate operation method are less than when using the simultaneous gate operation method, but the variations of the gate openings and flow rates through each control gate are much larger. The flow disturbances produced by the Tianjin outlet can be rectified within several channel sections and the transition time can be greatly shortened by allowing the water levels immediately upstream of the control gates to vary within proscribed ranges, rather than being held constant.
文摘选择南水北调中线工程沿线邯郸、正定、涿州为代表地区,利用1979-2021年冬季逐日气温数据,分析各代表区气温序列统计频率分布与理论概率分布的拟合情况,提出标准化温度指数(standardized temperature index,STI),并据此建立新的冬季冷暖量化评估模型。结果表明:STI方法与国标法的冬季冷暖评估结果基本一致,但在各代表区强冷冬和强暖冬划定上,STI评估得出的年份数量均少于国标法;各代表区以1月份气温计算得出的冷暖等级阈值对应的气温值均明显低于按整个冬季3个月计算结果。工程所在纬度越高,冬季冷暖等级阈值对应的气温值越低;根据STI评估结果,邯郸、正定、涿州发生强冷冬概率分别为7.14%、9.52%和4.76%,发生弱冷冬及以上的概率分别为38.09%、40.48%和38.09%,发生平冬的概率分别为21.43%、28.57%和21.43%,发生弱暖冬及以上的概率分别为40.48%、30.95%和40.48%,发生强暖冬的概率分别为4.76%、7.14%和2.38%。研究成果与基于正态分布的国标法相比,考虑了气温序列的偏态性概率分布特征,对相对冷暖的判别更科学,有推广应用价值。
基金this study was supported by the National Basic Research Program of China(2010CB428406)National Key Technology R&D Program of China(Grant No.2006BAB04A09)the National Science Foundation of P.R.China(Grant No.50939001 and 51079004)
基金supported by the National Hi-Tech Research and Development Program of China ("863" Project) (Grant No. 2006BAB04A08)the National Natural Science Foundation of China (Grant No. 50779027)
文摘The Western Route of the South-to-North Water Transfer Project will divert water from the upper Yangtze River and its tributaries, the Dadu River and Yalong River, to the upper Yellow River. The project may ease the water shortage in the Yellow River Basin. However, it may also have some effects on the ecosystem in the upper Yangtze River Basin. Benthic invertebrates play an important role in the river ecosystem, particularly in the circulation of materials and nutrition. Benthic invertebrates are widely used to quickly assess river ecosystems because of their rapid response to changes in the water environment. The diversity of benthic invertebrates is closely associated with the aquatic habitat area. This study examined this interaction by sampling the benthic invertebrates in an expanding area. The conclusions are that the diversity of benthic invertebrates begins to decrease when the aquatic habitat area is reduced to 45% of the original area, and decreases dramatically when the aquatic habitat area is reduced to 10% of the original area. The aquatic habitat area should be kept at more than 45% of the original area in order to maintain the significant diversity of benthic invertebrates.
基金This work was supported by the Key Technologies Research and Development Program of the Eleventh Five-Year Plan of China(Grant No.2006BAC10B03)the National Natural Science Foundation of China-Japan Science and Technology Agency(NSFCJST)Strategic Joint Research Project(Grant No.50721140017)the National Natural Science Foundation of China(Grant No.50508019).
文摘To evaluate the ecological effects of lakeshore wetland rehabilitation on the eastern route of the Southto-NorthWater Transfer Project,species composition,coverage,height,and biomass of wetland communities at 22 sites of the study area on the shore of Nansi Lake in April and May 2007 were investigated.The wetlands under investigation were divided into platform fields,transition zones,and shallow water zones according to differences in elevations,water levels,and human activities.The species richness index,Shannon-Wiener index,Simpson index,and Pielou Evenness index were adopted to delineate and discuss the ecological effects of lakeshore wetland rehabilitation in 22 quadrates.Results showed that the species richness of the wetland areas after 2 years’rehabilitation amounted to 47 of 24 families,higher than 25 of 20 families in areas without rehabilitation.The biodiversity index and abundance index of rehabilitated areas were also higher than those of platform fields and fish ponds where there was no rehabilitation.In addition,the Shannon-Wiener index,Simpson index,and community evenness index of platform fields in rehabilitated wetland areas were 1.619,0.745,and 0.860,respectively,higher than those of the platform fields before rehabilitating.The results suggested that the constructed lakeshore wetland played an important role in protecting the diversity of species.