期刊文献+
共找到1,124篇文章
< 1 2 57 >
每页显示 20 50 100
Land Cover Changes and Drivers in the Water Source Area of the Middle Route of the South-to-North Water Diversion Project in China from 2000 to 2015 被引量:3
1
作者 GAO Wenwen ZENG Yuan +2 位作者 ZHAO Dan WU Bingfang REN Zhiyuan 《Chinese Geographical Science》 SCIE CSCD 2020年第1期115-126,共12页
The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial u... The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial use.The water source area of the MR-SNWDP is the region that is most sensitive to and most affected by the construction of this water diversion project.In this study,we used Landsat Thematic Mapper(TM)and HJ-1 A/B images from 2000 to 2015 by an object-based approach with a hierarchical classification method for mapping land cover in the water source area.The changes in land cover were illuminated by transfer matrixes,single dynamic degree,slope zones and fractional vegetation cover(FVC).The results indicated that the area of cropland decreased by 31%and was replaced mainly by shrub over the past 15 years,whereas forest and settlements showed continuous increases of 29.2% and 77.7%,respectively.The changes in cropland were obvious in all slope zones and decreased most remarkably(–43.8%)in the slope zone above 25°.Compared to the FVC of forest and shrub,significant improvement was exhibited in the FVC of grassland,with a growth rate of 16.6%.We concluded that local policies,including economic development,water conservation and immigration resulting from the construction of the MR-SNWDP,were the main drivers of land cover changes;notably,they stimulated the substantial and rapid expansion of settlements,doubled the wetlands and drove the transformation from cropland to settlements in immigration areas. 展开更多
关键词 remote sensing land cover change object-based classification middle route of the south-to-north water diversion project(MR-SNWDP) China
下载PDF
Eco-environmental benefit assessment of China's South-North Water Transfer Scheme——the middle route project
2
作者 DUANGuang-ming ZHAOJing-zhu LIUGuo-hua KEBing XIAOHan WUGang DENGHong-bing 《Journal of Environmental Sciences》 SCIE EI CAS CSCD 2004年第2期308-315,共8页
This paper assess the eco-environmental benefits that may come from the middle route project of China's South-North Water Transfer Scheme(SNWT) with principles and methods of eco-economics and planning reports of ... This paper assess the eco-environmental benefits that may come from the middle route project of China's South-North Water Transfer Scheme(SNWT) with principles and methods of eco-economics and planning reports of SNWT's middle route project. Some benefits were calculated in monetary units. To make sure that the results can be comparable with normal monetary indices, concrete assessment objects and the parameters are prudently selected according to the major characteristics of the project and its water import region. Primary assessment revealed that in different project construction stages, the benefit could be more than 13 07 billion RMB Yuan in 2010 and 19 79 billion RMB Yuan in 2030, respectively. The monetary value tends to increase with social-economic development. To realize these potential benefits, however, calls for more endeavors. 展开更多
关键词 China's south-North water Transfer Scheme(SNWT) the middle route project of south-North water Transfer(MRPSNWT) assessment ecosystem services monetary indices
下载PDF
Computing payment for ecosystem services in watersheds: An analysis of the Middle Route Project of South-to-North Water Diversion in China 被引量:12
3
作者 Zhengju Dong Yan Yan +5 位作者 Jing Duan Xiao Fu Qingrong Zhou Xiang Huang Xiangen Zhu Jingzhu Zhao 《Journal of Environmental Sciences》 SCIE EI CAS CSCD 2011年第12期2005-2012,共8页
Payment for ecosystem services (PES) has attracted considerable attention as an economic incentive for promoting natural resource management recently. As emphasis has been placed on using the incentive-based mechani... Payment for ecosystem services (PES) has attracted considerable attention as an economic incentive for promoting natural resource management recently. As emphasis has been placed on using the incentive-based mechanism by the central government, rapid progress on PES research and practice has been achieved. However PES still faces many difficulties. A key issue is the lack of a fully-fledged theory and method to clearly define the design scope, accounting and feasibility of PES criteria. An improved watershed criteria model was developed in light of research on PES practices in China, investigations on the water source area for the Middle Route Project of South-to-North Water Diversion and ecosystem services outflows theory. The basic principle of assessment is the direct and opportunity cost for ecological conservation and environmental protection in the water source area deduct nationally-financed PES and internal effect. Then the scope and the criteria methods were determined, and internal effect was put forward to define benefits brought from water source area. Finally, Shiyan City, which is the main water source area for the Project of Water Diversion, was analyzed by this model and its payment was calculated. The results showed that: (1) during 2003–2050, the total direct cost and opportunity cost would reach up to 262.70 billion and 256.33 billion Chinese Yuan (CNY, 2000 constant prices), i.e., 50.61% and 49.38% of total cost, respectively; (2) Shiyan City would gain 0.23, 0.06 and 0.03 CNY/m3 in 2014–2020, 2021–2030, and 2031–2050, respectively. 展开更多
关键词 waterSHED payment for ecosystem services ecosystem services cost-benefit analysis middle route project of south-to- North water diversion
原文传递
Price Analysis of Water Supply for South-to-North Water Transfer Project
4
作者 QIU Zhong enProfessor, Design Institute, Changjiang Water Resources Commission, Wuhan 430010, China Tan Chang liSenior Engineer, Design Institute, Changjiang Water Resources Commission, Wuhan 430010, China ZHU Qin Engineer, Design Institute, Chan 《人民长江》 北大核心 2001年第S1期29-32,共4页
The factors influencing the water supply price of a hydraulic project include natural conditions and economic policies. This paper thoroughly demonstrates the water price of South-to-North Water Transfer Project from ... The factors influencing the water supply price of a hydraulic project include natural conditions and economic policies. This paper thoroughly demonstrates the water price of South-to-North Water Transfer Project from the viewpoint of economic policies. It is considered that if the project is assigned as a profitable one and built depending on commercial loan from bank completely or mostly, the water price will be too high to be undertaken by users,and if the project places the public good at first while considering the economic benefit, its investment mainly relies on the state (national or local governments) appropriation and self-raised funds and a little from the bank loan on favorable terms, the price determined according to the principle of satisfying the cost and reasonable profit will be relatively lower and can be undertaken by the users in the North China where water shortage is serious. The problem of higher water price of agricultural irrigation to the north of the Yellow River can be tackled by taking measures such as "compensating agriculture by industry" according to foreign practical experiences and relevant suggestions. 展开更多
关键词 PRICE of water supply water PRICE estimation FUND RAISING schemes water TRANSFER cost middle-route project of south-to-north water TRANSFER
下载PDF
Potential Ecological Benefits of the Middle Route for the South-North Water Diversion Project 被引量:2
5
作者 杜鹏飞 《Tsinghua Science and Technology》 SCIE EI CAS 2008年第5期715-719,共5页
This paper presents a study of the middle route of the South-North Water Diversion Project. The middle route runs through the Northern China plain, where the water shortages are the most severe. There is not only a sh... This paper presents a study of the middle route of the South-North Water Diversion Project. The middle route runs through the Northern China plain, where the water shortages are the most severe. There is not only a shortage of water for human usage, but also a shortage of ecological water. Although the current plan for the middle route is strictly focused on supplying water for residential and industrial use, the water can also potentially be used for ecological purposes. This paper evaluates the potential ecological benefits that can be brought to the fragile ecology in northern China by the middle route, in addition to the water supplied to residences and industry. The study describes ecological benefits of the middle route project, such as mitigation of groundwater extraction in the region and positive influences on the climate, the ecological uses of the middle route project itself, such as creating artificial niches along the channel and directly using the channel for ecological purposes, and the ecological uses of the water along the middle route such as diversion of the water into dyer channels that have suffered from drought conditions for decades. 展开更多
关键词 south-North water diversion middle route ecological benefits
原文传递
Simulation of Transport Channel in China's Middle Route South-to-North Water Transfer Project 被引量:3
6
作者 方神光 魏加华 +1 位作者 吴保生 尚毅梓 《Tsinghua Science and Technology》 SCIE EI CAS 2009年第3期367-377,共11页
The unsteady flow in the Middle Route South-to-North Water Transfer Channel was simulated numerically using an implicit solution procedure for the Saint Venant equations. An equivalent roughness was used to simulate t... The unsteady flow in the Middle Route South-to-North Water Transfer Channel was simulated numerically using an implicit solution procedure for the Saint Venant equations. An equivalent roughness was used to simulate the effect of many transfer structures on the water levels in the main channel. Various gate operating and control methods were analyzed to study the response to disturbances produced by varying the flow rates through the Tianjin outlet. The results show that when the inflow at the head changes in the same way as the sum of the flow rates through all the outlets, the transition time and the fluctuation of the water levels using the timed gate operation method are less than when using the simultaneous gate operation method, but the variations of the gate openings and flow rates through each control gate are much larger. The flow disturbances produced by the Tianjin outlet can be rectified within several channel sections and the transition time can be greatly shortened by allowing the water levels immediately upstream of the control gates to vary within proscribed ranges, rather than being held constant. 展开更多
关键词 middle route south-to-north water Transfer project unsteady flow open channel control system SIMULATION
原文传递
On conservation and development of architecture and environment in the construction of large-scale national infrastructure——Exemplified by the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project 被引量:1
7
作者 DUAN Jin ,LUO JianLi,WANG XingPing,TANG Jun&YU Gang School of Architecture,Southeast University,Nanjing 210096,China 《Science China(Technological Sciences)》 SCIE EI CAS 2009年第12期3613-3625,共13页
The water-diverting route project’s characteristics,natural landscapes,and histories and humanism of the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project were systemically analyzed through ... The water-diverting route project’s characteristics,natural landscapes,and histories and humanism of the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project were systemically analyzed through proposing and studying the canal culture routes,the water resources heritage corridors,the landscape and recreation corridors,and the town economic corridors.The station areas along the water-diverting route were scientifically zoned and graded through quantitative and qualitative synthetic methods.Both planning compendiums and construction controlling methods were proposed based on the project grades of points,lines,and areas.Conservation and development of architecture and environment in the large-scale national infrastructure construction were explored systemically.Theories and methods of developing harmonious water-supplying functions,ecological functions,landscape effects,and cultural effects of large-scale water resources were examined. 展开更多
关键词 Jiangsu Section of Eastern route south-to-north water diversion project CANAL culture routes water resources heritage CORRIDORS landscape and RECREATION CORRIDORS town economic CORRIDORS synthetical ZONING and grading
原文传递
南水北调西线工程水源区可调水量“十问” 被引量:2
8
作者 胡鹏 王浩 +13 位作者 赵勇 宁远 蒋云钟 刘欢 曾庆慧 杨泽凡 周毓彦 董宁澎 闫龙 阿膺兰 张丰博 唐家璇 王玉莲 王建华 《中国工程科学》 CSCD 北大核心 2024年第2期210-223,共14页
南水北调西线工程是我国“四横三纵”国家水网主骨架尚待建设的最后一环,而水源区可调水量是西线工程规划论证面临的焦点和难点问题。本文从水资源本底条件与演变趋势,生态环境与经济社会发展需水,调蓄水库与输水工程规模,调水对水源区... 南水北调西线工程是我国“四横三纵”国家水网主骨架尚待建设的最后一环,而水源区可调水量是西线工程规划论证面临的焦点和难点问题。本文从水资源本底条件与演变趋势,生态环境与经济社会发展需水,调蓄水库与输水工程规模,调水对水源区及其下游水资源开发利用、水生态环境、水力发电、航运等方面影响的角度,提出了与水源区可调水量相关的10个问题;以长江上游分布式水文模型为基础,建立了南水北调西线工程水源区可调水量模拟分析模型,力图系统、定量地回答所提问题。本文的主要研究结论有:在仅考虑满足水源区河道内外生态环境和经济社会需水的前提下,“上线+下线”组合方案多年平均可调水量为1.59×10^(10)m^(3),“完全下线”方案在建设岗托水库进行联调时,多年平均可调水量将达到1.74×10^(10)m^(3);在综合考虑调水对水源区水平衡、水力发电和航运影响及其可接受程度后,南水北调西线水源区可调水量为1.22×10^(10)~1.26×10^(10)m^(3)。长远来看,应谋划西南片区水网与国家水网主骨架、“大动脉”的连接与融合,在减小南水北调西线工程调水影响的同时,提高南水北调西线工程的整体供水能力以及对气候变化等外部条件的适应性。 展开更多
关键词 南水北调西线工程 水源区 可调水量 生态需水 跨流域调水
下载PDF
南水北调中线总干渠冰盖糙率观测分析
9
作者 段文刚 邢梦媛 +2 位作者 黄明海 杨金波 沙继婷 《长江科学院院报》 CSCD 北大核心 2024年第10期78-85,118,共9页
冰盖糙率是确定渠道冰期输水水位和流量关系的基础参数,一直是明渠冰工程研究的重点之一。鉴于当前大型混凝土渠道冰盖糙率研究成果相当匮乏,以南水北调中线总干渠石家庄以北唯一无输水建筑物的唐河节制闸—放水河节制闸渠段为研究区域... 冰盖糙率是确定渠道冰期输水水位和流量关系的基础参数,一直是明渠冰工程研究的重点之一。鉴于当前大型混凝土渠道冰盖糙率研究成果相当匮乏,以南水北调中线总干渠石家庄以北唯一无输水建筑物的唐河节制闸—放水河节制闸渠段为研究区域,依据全线通水以来唯一生成全渠段封冻冰盖的2016年1—2月逐日水位和流量实测数据,采用伯努利能量方程和谢才-曼宁公式推求渠道糙率,定性定量分析封冻前后渠道糙率变化特征。结果表明:①研究渠段畅流期渠道糙率n b为0.0167,封冻期冰盖综合糙率n c为0.0146,冰盖下表面糙率n i为0.0118。②由于水力磨蚀作用,封冻期冰盖糙率随时间呈波动减小的趋势。③渠道一旦生成封冻冰盖,输水能力大幅降低,仅占渠道设计流量的66.7%。该研究给出了大型混凝土渠道封冻冰盖糙率和输水能力降低的确切数值,以期为冰期输水调度和类似工程设计提供科学依据。 展开更多
关键词 南水北调中线工程 冰盖糙率 渠道糙率 输水能力 水头损失
下载PDF
局部降温对输水渠道水华抑制的影响分析
10
作者 张雅卓 宋芷萱 +2 位作者 姚烨 闫琳琳 徐楚涵 《水资源与水工程学报》 CSCD 北大核心 2024年第2期130-138,148,共10页
南水北调中线工程自通水以来,发挥着巨大的社会和经济效益,已成为京津地区的主力水源。中线工程输水的水质理化指标相对稳定,但局部渠段存在藻类异常增殖现象,有水华爆发的风险。针对出现的藻类异常增殖问题,在通冷风这一改变局部气象... 南水北调中线工程自通水以来,发挥着巨大的社会和经济效益,已成为京津地区的主力水源。中线工程输水的水质理化指标相对稳定,但局部渠段存在藻类异常增殖现象,有水华爆发的风险。针对出现的藻类异常增殖问题,在通冷风这一改变局部气象条件的工程措施基础上,建立了澎河—沙河渡槽段平面二维水动力和水质模型,研究了通风位置、通风温度和通风时长等因素对输水渠道水温和藻类的影响。研究表明:水温和叶绿素a浓度均与通风位置、通风温度和通风时长有关,通风温度越低、通风时长越长,平均水温和叶绿素a浓度下降幅度越大,平均水温最高可下降约2℃,叶绿素a浓度最大可降低约54.5%,且仅上游和全渠段通风均可有效降低水温和抑制藻类生长,仅下游通风对水温和藻类的影响较小。因此,采取局部降温的方式可以起到一定的降低叶绿素a浓度的作用,综合考虑藻类抑制效果和工程成本,在水华易爆发渠段的上游通冷风是行之有效的工程措施。 展开更多
关键词 输水渠道水华 局部降温 通冷风 叶绿素A 水温 数值模拟 南水北调中线工程
下载PDF
气候变化对南水北调西线工程的影响及建议
11
作者 王国庆 虞畅 +3 位作者 金君良 宁忠瑞 王云 孙高霞 《人民黄河》 CAS 北大核心 2024年第9期60-66,共7页
南水北调工程是国家水网的重要组成部分,其西线工程建设是缓解我国西北、华北地区水资源短缺的重要举措。气候变化下西线工程引水区和受水区水资源情势直接关系到工程的规划建设与运行方式。基于历史实测资料和气候模式情景,采用数理统... 南水北调工程是国家水网的重要组成部分,其西线工程建设是缓解我国西北、华北地区水资源短缺的重要举措。气候变化下西线工程引水区和受水区水资源情势直接关系到工程的规划建设与运行方式。基于历史实测资料和气候模式情景,采用数理统计与水文模拟相结合的途径分析了气候变化对南水北调西线工程引水区和受水区水资源的影响。结果表明:1)1961—2020年西线调水区和受水区气候变化以暖湿化为主要特征,调水区年径流量整体稳定略增,受水区年径流量显著性减少。2)未来中期(2035年)和远期(2050年),调水区和受水区气温继续显著升高,降水多呈非显著增加;未来中期、远期调水区年径流量较基准期(1961—2000年)分别增加1.42%和2.08%,受水区年径流量分别减少1.02%和0.28%。3)未来气候变化下,调水区年径流量相对稳定,能够满足调水需求,受水区年径流量略减,对跨流域调水需求有所增加。为确保南水北调西线工程的长期稳定运行,建议加强气候变化及其影响的不确定性研究,制定科学合理的应对措施,以应对未来可能的水资源短缺的挑战。 展开更多
关键词 气候变化 RCCC-WBM模型 水资源 南水北调西线工程
下载PDF
南水北调中线水源区植被指数时空变化分析
12
作者 白景锋 张海军 白云帆 《湖北农业科学》 2024年第2期205-210,共6页
通过单线性回归(SLOPE)和地理加权回归(GWR)法,用植被指数(NDVI)研究南水北调中线水源区的植被分布变化趋势及机制,为保障水量和水质提供理论支撑。结果表明,2000—2019年水源区NDVI和入库流量呈现同步增长,植被逐渐变好,2007年以前NDV... 通过单线性回归(SLOPE)和地理加权回归(GWR)法,用植被指数(NDVI)研究南水北调中线水源区的植被分布变化趋势及机制,为保障水量和水质提供理论支撑。结果表明,2000—2019年水源区NDVI和入库流量呈现同步增长,植被逐渐变好,2007年以前NDVI增长幅度大,2008—2011年处于波动阶段,2012年以后增长幅度减小;NDVI变化最明显的是研究区东北部、西部和丹江口库区周边,这些区域地势相对低平、人口集中,中山和高山区NDVI变化不大;高程、坡度、人口数和城镇化是影响水源区NDVI分布的主要因素,降水、气温和产业比重是次要因素;各因素影响的强度和方向在空间上有异质性,自然地理因素对NDVI影响的最显著范围为高程1090 m以下、年均降水量980 mm以上的区域,人文地理因素影响的显著范围区是人口密度大、城镇化率高的地区。 展开更多
关键词 南水北调中线水源区 NDVI 时空变化
下载PDF
基于水网视角的水资源与关联要素适配性评价
13
作者 刘欢 甘永德 +2 位作者 杨钦 张丰搏 李青青 《水资源保护》 EI CAS CSCD 北大核心 2024年第5期62-68,103,共8页
为研究水资源与关联要素的空间错配问题,基于水网视角,根据适配理论和水资源多维属性理论,提出了包含资源层、社会层、经济层和生态层的水资源与关联要素适配性评价方法,并应用于南水北调中线一期工程影响区。结果表明:该方法可较为合... 为研究水资源与关联要素的空间错配问题,基于水网视角,根据适配理论和水资源多维属性理论,提出了包含资源层、社会层、经济层和生态层的水资源与关联要素适配性评价方法,并应用于南水北调中线一期工程影响区。结果表明:该方法可较为合理、系统地揭示水资源与关联要素的适配特征;2016—2020年南水北调中线一期工程影响区水资源与关联要素空间分布相对合理,整体基尼系数为0.388,资源层和社会层水资源与关联要素空间适配性较好,基尼系数分别为0.283和0.284,而经济层和生态层水资源与关联要素错配问题严重,基尼系数为0.501和0.486;南水北调中线一期工程通水后,水资源与关联要素的空间适配性在资源层、社会层、经济层有不同程度改善,在生态层变化不大。 展开更多
关键词 水网 水资源关联要素 适配性 南水北调中线工程
下载PDF
南水北调西线工程上线水源区大型底栖动物群落结构及环境驱动因子 被引量:4
14
作者 张丰搏 胡鹏 +3 位作者 闫龙 唐家璇 闫肖瑶 王玉莲 《水资源保护》 EI CSCD 北大核心 2024年第1期135-141,共7页
为评估南水北调西线工程上线水源区大型底栖动物群落结构及环境驱动因子,于2022年7月(汛期)和11月(非汛期)开展监测采样工作。采用生物多样性指数和丰度-生物量比较曲线(ABC曲线)作为大型底栖动物群落特征参数,分析大型底栖动物群落在... 为评估南水北调西线工程上线水源区大型底栖动物群落结构及环境驱动因子,于2022年7月(汛期)和11月(非汛期)开展监测采样工作。采用生物多样性指数和丰度-生物量比较曲线(ABC曲线)作为大型底栖动物群落特征参数,分析大型底栖动物群落在水源区的结构,并对其进行多元排序和Pearson相关性分析。结果表明:共采集45种大型底栖动物,隶属于4门5纲10目32科44属,其中优势种8种,所有优势物种出现频率均大于50%,水源区大型底栖动物群落结构一致性较高;水源区Margalef丰富度指数、Shannon-Wiener多样性指数和Pielou均匀度指数均值分别为4.01、1.68、0.61;多数采样区域大型底栖动物的ABC曲线呈纠缠态势,其丰度和生物量累积百分比的差值面积在0附近波动,群落以小个头物种为主;优势种以耐污值低的敏感种类为主,说明河流几乎不受污染,水体清洁;pH值是影响水源区大型底栖动物群落结构的主要环境驱动因子。 展开更多
关键词 南水北调西线工程 大型底栖动物群落 生物多样性指数 ABC曲线 环境驱动因子
下载PDF
南水北调中线工程水源区环境规制对经济高质量发展的影响 被引量:1
15
作者 黄进 王伟 +1 位作者 田野 郭晓燚 《水资源保护》 EI CAS CSCD 北大核心 2024年第4期148-156,共9页
为研究南水北调中线工程水源区环境规制通过水资源利用对区域发展质效的影响,基于2005—2022年南水北调中线工程水源区12个城市的面板数据,构建基准回归模型、中介效应模型和门槛效应模型,实证分析了环境规制、水资源利用效率和经济高... 为研究南水北调中线工程水源区环境规制通过水资源利用对区域发展质效的影响,基于2005—2022年南水北调中线工程水源区12个城市的面板数据,构建基准回归模型、中介效应模型和门槛效应模型,实证分析了环境规制、水资源利用效率和经济高质量发展之间的关系。结果表明:环境规制对经济高质量发展具有正向促进效应,该促进效应在不同区域间存在异质性,环境规制的促进作用在用水量小的地区更加显著,而在用水量大的地区,丰富的水资源限制了环境规制对经济高质量发展的促进作用;在环境规制影响区域,水资源利用效率在经济高质量发展过程中发挥出显著的中介作用,水资源利用效率中介效应占环境规制总促进效应的比例为13.5%;水资源利用效率在环境规制对经济高质量发展影响中具有门槛效应,当水资源利用效率超过4.3后,环境规制对经济高质量发展的促进效应显著增强。 展开更多
关键词 环境规制 经济高质量发展 水资源利用效率 中介效应 门槛效应 南水北调中线工程
下载PDF
南水北调中线工程突发水污染生态补偿机制研究 被引量:1
16
作者 刘钢 李睿萌 +1 位作者 段睿睿 牛富 《华北水利水电大学学报(自然科学版)》 北大核心 2024年第2期101-108,共8页
突发水污染已成为制约南水北调中线工程可持续调水的重大安全隐患,亟须解决南水北调中线工程突发水污染的生态补偿机制设计问题。针对应由中线局承担责任的南水北调中线干渠突发水污染场景,从多利益相关者合作视角出发,明确了中线局向... 突发水污染已成为制约南水北调中线工程可持续调水的重大安全隐患,亟须解决南水北调中线工程突发水污染的生态补偿机制设计问题。针对应由中线局承担责任的南水北调中线干渠突发水污染场景,从多利益相关者合作视角出发,明确了中线局向纳污地政府提供生态补水的突发水污染生态补偿机制,基于合作博弈理论,构建了中线局与纳污地政府合作联盟的纳什议价模型,并以河南省邓州市为例开展研究,主要研究结果表明:①生态补水天数与纳污总损失呈现出显著的正向相关关系,且伴随纳污总损失逐步增大,中线局议价能力对补水天数的影响能力呈现出边际递减特征。②中线局生态补水成本与生态补水天数具有显著的正向关系,随着中线局议价能力的增强,生态补水成本的规模效益呈现一定的弱化趋势。③在一定的生态补水规模范围内,中线局与纳污地政府能够达成有效的合作联盟。 展开更多
关键词 南水北调中线工程 突发水污染 纳什议价博弈 生态补偿机制
下载PDF
基于多方法综合比较的南水北调西线工程水源区生态需水研究
17
作者 王玉莲 杨泽凡 +5 位作者 闫龙 刘欢 曾庆慧 杨钦 闫肖瑶 胡鹏 《水资源保护》 EI CAS CSCD 北大核心 2024年第4期137-147,共11页
针对南水北调西线工程调水需求,以方法比选、目标修正、可行性验证为主线,提出了一套多方法综合确定水源区生态需水过程的思路,并制定了10个坝址断面枯水期和非枯水期的生态基流、敏感生态需水及年生态水量目标。结果表明:水源区坝址断... 针对南水北调西线工程调水需求,以方法比选、目标修正、可行性验证为主线,提出了一套多方法综合确定水源区生态需水过程的思路,并制定了10个坝址断面枯水期和非枯水期的生态基流、敏感生态需水及年生态水量目标。结果表明:水源区坝址断面枯水期生态基流在多年平均流量中的占比约为20%,非枯水期占比约为40%;3—6月为鱼类集中产卵敏感期,需要每月发生一次脉冲流量过程,每次至少持续10 d,脉冲流量在多年平均流量中的占比为48%~73%;各坝址断面年均生态水量在多年平均径流量中的占比约为70%,其中丰水年、一般偏枯年、枯水年生态水量占比分别为68%~78%、66%~75%和61%~70%;研究结果符合长江流域现有管控要求,具备较好的现实可达性。 展开更多
关键词 生态需水 生态基流 敏感生态需水 年生态水量 南水北调西线工程
下载PDF
高雷诺数下倒虹吸闸墩绕流水力特性
18
作者 贺蔚 周红星 +3 位作者 秦杭晓 曾庆林 张健 徐辉 《水电能源科学》 北大核心 2024年第4期155-159,共5页
为研究倒虹吸出口闸墩绕流特性,以南水北调某典型倒虹吸为例,基于Flow3D软件建立倒虹吸模型,根据现场原型实测水位、流速进行模型验证;利用该模型模拟了雷诺数6.17×10^(6)~9.38×10^(6)范围下闸墩绕流特性。结果表明,高雷诺数... 为研究倒虹吸出口闸墩绕流特性,以南水北调某典型倒虹吸为例,基于Flow3D软件建立倒虹吸模型,根据现场原型实测水位、流速进行模型验证;利用该模型模拟了雷诺数6.17×10^(6)~9.38×10^(6)范围下闸墩绕流特性。结果表明,高雷诺数条件下,随着雷诺数的增加,闸墩绕流造成的液面波动幅度增加,中墩液面波动显著大于边墩;闸墩后的尾涡量持续增加,雷诺数对斯特劳哈尔数影响不大;边侧闸墩受力的非对称性明显,边墩闸室间特征流速偏流比存在先增大再减小的变化规律,偏流效应造成的离心距不断增加。本研究可针对性改善输水工程水流流态。 展开更多
关键词 南水北调中线工程 卡门涡街 闸墩绕流 偏流效应 倒虹吸
下载PDF
水上光伏覆盖对明渠水质的影响规律研究
19
作者 闫琳琳 练继建 +1 位作者 姚烨 宋芷萱 《太阳能学报》 EI CAS CSCD 北大核心 2024年第7期548-557,共10页
水上光伏带来的太阳短波辐照度变化对缓解输水明渠藻类增殖问题的效果亟需评估。以南水北调中线干渠为例,建立干渠安阳河节制闸至坟庄河节制闸渠段的水动力和水质模型,分析比较明渠水面悬浮式覆盖水上光伏带来的太阳短波辐照度变化和水... 水上光伏带来的太阳短波辐照度变化对缓解输水明渠藻类增殖问题的效果亟需评估。以南水北调中线干渠为例,建立干渠安阳河节制闸至坟庄河节制闸渠段的水动力和水质模型,分析比较明渠水面悬浮式覆盖水上光伏带来的太阳短波辐照度变化和水上光伏不同覆盖位置对渠道水温和水质的影响规律。研究表明:在开展水上光伏项目时,渠道接收的太阳短波辐照度降低会使得水温、藻生物量和溶解氧含量下降,营养盐含量有所上升。太阳短波辐照度降低50%后,藻生物量开始逐渐降低。在覆盖率和透射率一定的情况下,不同覆盖位置情景下对藻生物量的削减峰值区别较小。当太阳短波辐照度由高到低逐渐变化时,流速变化对藻生物量的影响幅度呈先升高后下降趋势。 展开更多
关键词 光伏 水质 太阳短波辐照度 南水北调中线工程 流速
下载PDF
南水北调中线京石段闸门间歇关闭水力响应特性
20
作者 雷毓灵 崔巍 +3 位作者 王磊 丁志楠 穆祥鹏 陈文学 《南水北调与水利科技(中英文)》 CAS CSCD 北大核心 2024年第3期427-435,共9页
为减小闸门关闭引发的水位壅高,以南水北调中线工程京石段磁河闸至沙河北闸之间的渠池为研究对象,构建一维明渠非恒定渐变流仿真模型,比较分次间歇关闸与一次连续关闸,以及不同闸门间歇方案对闸前壅水峰值、水力振荡稳定时间的影响。研... 为减小闸门关闭引发的水位壅高,以南水北调中线工程京石段磁河闸至沙河北闸之间的渠池为研究对象,构建一维明渠非恒定渐变流仿真模型,比较分次间歇关闸与一次连续关闸,以及不同闸门间歇方案对闸前壅水峰值、水力振荡稳定时间的影响。研究表明:分次间歇关闸可带来更低的闸前壅水水位和更短的水力振荡稳定时间;设置1次间歇相较于多次间歇可减小闸前壅水峰值,将间歇开始时刻设置在上游降水波即将传播至闸前的时刻、设置间歇时长略小于关闸总时间的1/2均可有效降低闸前壅水峰值,缩短稳定时间。闸门分次间歇关闭水力响应特性与水波运动规律紧密关联,合理设置间歇有助于在应急调控阶段减少事故造成的影响。 展开更多
关键词 明渠水力学 南水北调中线工程 闸门分次间歇关闭 水力振荡 应急调度
下载PDF
上一页 1 2 57 下一页 到第
使用帮助 返回顶部