Generally, mine roads are located in the mountain areas, as its complex topography, mostly along the river near the cliffs, steep bend anxious, the mine road design has to adopt lower technical standards relatively an...Generally, mine roads are located in the mountain areas, as its complex topography, mostly along the river near the cliffs, steep bend anxious, the mine road design has to adopt lower technical standards relatively and usually is lack of traffic safety facilities. Especially, there are mainly medium-sized vehicles on mine road, under the heavy traffic vehicles affect repeatedly, high frequency of traffic accidents more easily happen in mine road area and cause serious effects on life or property. Combining with the particularity of mine road safety environment, this paper studies the basic theory of safety evaluation, analyses the factors of traffic safety design and special mine terrain conditions, and then establishes mine road safety index system and evaluation model based on the principles such as systematicness, independent indexes, qualitative and quantitative analysis, feasibility, scientificity and reliability. At last, the paper successfully evaluates the safety of road in Huang Mailing phosphate rock area with fuzzy AHP method based on engineering project.展开更多
In discussing coal mine entry construction with rock bolt technology, examinedthe craft and machinery problems as well as the conditions in which to use each kind ofmachine and tool.It exposed the intrinsic flaws of t...In discussing coal mine entry construction with rock bolt technology, examinedthe craft and machinery problems as well as the conditions in which to use each kind ofmachine and tool.It exposed the intrinsic flaws of the widely used road header.The problemis that it was designed according to early timbering support state but is not suitable forrock bolt technology.The way to improve the function of existing road headers is notthrough parallel operations but using the SUDM (Shield Union Driving Machine), which isa new machine that improves construction.This article proposed a few solutions in designto solve this problem.展开更多
We determined a suitable gate road layout in slice mining in an ultra-thick unstable coal seam,using theoretical analysis and numerical calculations.Based on plasticity theory in terms of limiting equilibrium,the widt...We determined a suitable gate road layout in slice mining in an ultra-thick unstable coal seam,using theoretical analysis and numerical calculations.Based on plasticity theory in terms of limiting equilibrium,the width of chain pillar in the upper slice was calculated to be 18 m.The stress distribution in the chain pillar after the upper slice was mined out was described with numerical simulation.The extent of the effect of stress on the upper chain pillar on the lower solid coal was obtained on the basis of an elastic solution of a distributed force loaded on a half-plane.Three layout designs for lower gate roads were proposed and a stability factor was introduced to analyze the stability of the lower pillar with numerical calculation.Gate road translation was determined as the most suitable layout method,which maximizes the extraction rate on the basis of the pillar stability.展开更多
文摘Generally, mine roads are located in the mountain areas, as its complex topography, mostly along the river near the cliffs, steep bend anxious, the mine road design has to adopt lower technical standards relatively and usually is lack of traffic safety facilities. Especially, there are mainly medium-sized vehicles on mine road, under the heavy traffic vehicles affect repeatedly, high frequency of traffic accidents more easily happen in mine road area and cause serious effects on life or property. Combining with the particularity of mine road safety environment, this paper studies the basic theory of safety evaluation, analyses the factors of traffic safety design and special mine terrain conditions, and then establishes mine road safety index system and evaluation model based on the principles such as systematicness, independent indexes, qualitative and quantitative analysis, feasibility, scientificity and reliability. At last, the paper successfully evaluates the safety of road in Huang Mailing phosphate rock area with fuzzy AHP method based on engineering project.
文摘In discussing coal mine entry construction with rock bolt technology, examinedthe craft and machinery problems as well as the conditions in which to use each kind ofmachine and tool.It exposed the intrinsic flaws of the widely used road header.The problemis that it was designed according to early timbering support state but is not suitable forrock bolt technology.The way to improve the function of existing road headers is notthrough parallel operations but using the SUDM (Shield Union Driving Machine), which isa new machine that improves construction.This article proposed a few solutions in designto solve this problem.
基金provided by the Research Fund of the Fundamental Research Funds for the Central Universities of China University of Mining & Technology (No. 2010ZDP02B02)the State Key Laboratory of Coal Resources and Mine Safety (No.SKLCRSM08X2)+2 种基金the Jiangsu "333"High Qualified Talentsthe National Natural Science Foundation of China (Nos. 50904063 and51004101)the Scientific Research Foundation of China University of Mining & Technology (Nos. 2008A003 and 2009A001)
文摘We determined a suitable gate road layout in slice mining in an ultra-thick unstable coal seam,using theoretical analysis and numerical calculations.Based on plasticity theory in terms of limiting equilibrium,the width of chain pillar in the upper slice was calculated to be 18 m.The stress distribution in the chain pillar after the upper slice was mined out was described with numerical simulation.The extent of the effect of stress on the upper chain pillar on the lower solid coal was obtained on the basis of an elastic solution of a distributed force loaded on a half-plane.Three layout designs for lower gate roads were proposed and a stability factor was introduced to analyze the stability of the lower pillar with numerical calculation.Gate road translation was determined as the most suitable layout method,which maximizes the extraction rate on the basis of the pillar stability.