期刊文献+
共找到14,924篇文章
< 1 2 250 >
每页显示 20 50 100
Optimum mining method selection using fuzzy analytical hierarchy process–Qapiliq salt mine,Iran 被引量:7
1
作者 Karimnia Hamed Bagloo Heydar 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2015年第2期225-230,共6页
Mining method selection is the first and the most critical problem in mine design and depends on some parameters such as geotechnical and geological features and economic and geographic factors. In this paper, the fac... Mining method selection is the first and the most critical problem in mine design and depends on some parameters such as geotechnical and geological features and economic and geographic factors. In this paper, the factors affecting mining method selection are determined. These factors include shape, thick- ness, depth, slope, RMR and RSS of the orebody, RMR and RSS of the hanging wall and footwall. Then, the priorities of these factors are calculated. In order to calculate the priorities of factors and select the best mining method for Qapiliq salt mine, Iran, based on these priorities, fuzzy analytical hierarchy process (AHP) technique is used. For this purpose, a questionnaire was prepared and was given to the associated experts. Finally, after a comparison carried out based on the effective factors, between the four mining methods including area mining, room and pillar, cut and fill and stope and pillar methods, the stope and nillar mining method was selected as the most suitable method to this mine. 展开更多
关键词 mining method selection Fuzzy AHP Multiple criteria decision making Salt mine
下载PDF
Optimization of mining method in subsea deep gold mines: A case study 被引量:7
2
作者 Wei-zhang LIANG Guo-yan ZHAO +1 位作者 Hao WU Ying CHEN 《Transactions of Nonferrous Metals Society of China》 SCIE EI CAS CSCD 2019年第10期2160-2169,共10页
The mining method optimization in subsea deep gold mines was studied. First, an index system for subsea mining method selection was established based on technical feasibility, security status, economic benefit, and ma... The mining method optimization in subsea deep gold mines was studied. First, an index system for subsea mining method selection was established based on technical feasibility, security status, economic benefit, and management complexity. Next, an evaluation matrix containing crisp numbers and triangular fuzzy numbers(TFNs) was constructed to describe quantitative and qualitative information simultaneously. Then, a hybrid model combining fuzzy theory and the Tomada de Decis?o Interativa Multicritério(TODIM) method was proposed. Finally, the feasibility of the proposed approach was validated by an illustrative example of selecting the optimal mining method in the Sanshandao Gold Mine(China). The robustness of this approach was demonstrated through a sensitivity analysis. The results show that the proposed hybrid TODIM method is reliable and stable for choosing the optimal mining method in subsea deep gold mines and provides references for mining method optimization in other similar undersea mines. 展开更多
关键词 subsea deep mining mining method fuzzy theory hybrid TODIM method
下载PDF
Life cycle inventory for base metal ingots production in Japan including mining and mineral processing processes by cost estimating system database 被引量:1
3
作者 T.ADACHI G.MOGI 《中国有色金属学会会刊:英文版》 CSCD 2007年第A01期131-135,共5页
CO2 emission levels of copper and zinc mines from which Japanese smelters import ore concentrates into Japan,were estimated by using a database called MLED. Eleven copper mines selected from data availability of mine ... CO2 emission levels of copper and zinc mines from which Japanese smelters import ore concentrates into Japan,were estimated by using a database called MLED. Eleven copper mines selected from data availability of mine site covered 84% of the total imported concentrates. Adding inventories of sea transportation and smelting processes to mine development process,total CO2 emission level for copper and zinc ingots produced in Japan were calculated. The results show that the emission share of mining and mineral processing processes for each mine is indicated around 30%-70% of total emission for ingots,which implies the importance of including the mining activities to the inventory of upper stream products. 展开更多
关键词 金属材料 铸造方法 矿物 二氧化碳
下载PDF
NPV risk simulation of an open pit gold mine project under the O'Hara cost model by using Gas 被引量:1
4
作者 Franco-Sepulveda Giovanni Campuzano Carlos Pineda Cindy 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2017年第3期557-565,共9页
This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed acco... This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed according to the probability distributions associated to key variables affecting the NPV, like production level, ore grade, price of ore, and others, so as to see what if, in a gold open pit mine project of 3000 metric tons per day of ore. Two case scenarios were analyzed to simulate the NPV, one where there is low certainty data available, and the other where the information available is of high certainty. Results based on genetic algorithm metaheuristic simulations, which combine basically Montecarlo simulations provided by the Palisade Risk software, the O'Hara cost model, net smelter return and financial analysis tools offered by Excel are reported, in order to determine to which variables of the project is more sensitive the NPV. 展开更多
关键词 Genetic algorithms(GAs) O’Hara cost model Montecarlo simulation Open pit gold mine NPV risk analysis
下载PDF
Determining the Quality of Mine Gushing and Mixed Water Using Coupled AHP and Fuzzy Comprehensive Evaluation Methods 被引量:1
5
作者 Junzhi Wang Wei Zhao +3 位作者 Xinyi Wang Naima A. M. Hersi Pingqing Zhang Xiangyang Sang 《Journal of Water Resource and Protection》 2018年第12期1185-1197,共13页
This study focused on analysis of the chemical characteristics of mine waters. The aim of this study is to correlate the degree of different ionic components in mine water and the influence of their convergence using ... This study focused on analysis of the chemical characteristics of mine waters. The aim of this study is to correlate the degree of different ionic components in mine water and the influence of their convergence using a combination of the three-scale AHP and fuzzy evaluation methods for the comprehensive evaluation of water quality. Ion chromatography (ICS 1100) has been used to analyze the content of the water sample while portable pH/EC/TDS/Tem- perature meters (SX 811 and SX 813) were used to test physical-chemical parameters. The results of this study show that chemistry of in No.11 gushing mine is dominated by HCO3-Na and HCO3-Ca, and had a pH between 7.1 and 8.00, belonging to neutral or slightly alkaline water. In addition, water were found to have the hardness between 18 mg/L and 542.5 mg/L. Results also show that the TDS of the roof sandstone and goaves water are higher than Cambrian limestone water, while the turbidity of the mixed water is 20 NTU in the sump, again higher than in other samples such as Cambrian limestone water. Total dissolved solids and the total hardness of Cambrian limestone groundwater mainly depend on the content of K+ + Na+, Ca2+, B={b1,b2,…,bj} and SO2-4. Thus, chemical composition changes remarkably after mine water mixing. Results showed that the coal roof sandstone water is class V while that in the sump is class III, and the Cambrian limestone groundwater is class I. In gushing, the quality of water can vary greatly;thus, water from the coal face roof sandstone and the Cambrian limestone should be stored and treated separately before being utilized. 展开更多
关键词 mine WATER Chemical Characteristics AHP method Fuzzy COMPREHENSIVE EVALUATION method WATER QUALITY COMPREHENSIVE EVALUATION
下载PDF
Discussion on the application prospect of the transient electromagnetic method based on the dual launcher and mine advanced detection
6
作者 Zhen Yang Huizhou Liu +5 位作者 Shengqing Wang Yu Cao Ya Dong Chenghu Niu Weiwen Song Guoxin Xie 《World Journal of Condensed Matter Physics》 CAS 2024年第1期21-33,共13页
The dual transmitter implements the equivalent anti-magnetic flux transient electromagnetic method, which can effectively reduce the scope of the transient electromagnetic detection blind area. However, this method is... The dual transmitter implements the equivalent anti-magnetic flux transient electromagnetic method, which can effectively reduce the scope of the transient electromagnetic detection blind area. However, this method is rarely reported in the detection of pipelines in urban geophysical exploration and the application of coal mines. Based on this, this paper realizes the equivalent anti-magnetic flux transient electromagnetic method based on the dual launcher. The suppression effect of this method on the blind area is analyzed by physical simulation. And the detection experiment of underground pipelines is carried out outdoors. The results show that the dual launcher can significantly reduce the turn-off time, thereby effectively reducing the impact of the blind area on the detection results, and the pipeline detection results verify the device’s effectiveness. Finally, based on the ground experimental results, the application prospect of mine advanced detection is discussed. Compared with other detection fields, the formation of blind areas is mainly caused by the equipment. If the dual launcher can be used to reduce the blind area, the accuracy of advanced detection can be improved more effectively. The above research results are of great significance for improving the detection accuracy of the underground transient electromagnetic method. 展开更多
关键词 A Dual Launcher Physical Simulation Transient Electromagnetic method mine Geophysical Prospecting Detection Blind Area Application Prospect
下载PDF
Safe mining technology of undersea metal mine 被引量:15
7
作者 彭康 李夕兵 +2 位作者 万串串 彭述权 赵国彦 《Transactions of Nonferrous Metals Society of China》 SCIE EI CAS CSCD 2012年第3期740-746,共7页
Xinli district of Sanshandao Gold Mine is the first subsea metal mine in China.To achieve 6 kt/d production capacity under the premise of safe mining,high-intensity mining might destroy the in-situ stress filed and th... Xinli district of Sanshandao Gold Mine is the first subsea metal mine in China.To achieve 6 kt/d production capacity under the premise of safe mining,high-intensity mining might destroy the in-situ stress filed and the stability of rockmass.According to sampling and testing of ore-rock and backfill and in-situ stress field measurement,safety factor method calculation model based on stress-strain strength reduction at arbitrary points and Mohr-Coulomb yield criterion was established and limit displacement subsidence values under the safety factor of different limit stoping steps were calculated.The results from three years in-situ mining and strata movement monitoring using multi-point displacements meter showed that the lower settlement frame stope hierarchical level filling mining method,mining sequence are reasonable and rockmass stability evaluation using safety factor method,in-situ real-time monitoring can provide the technical foundation for the safety of seabed mining. 展开更多
关键词 subsea bedrock mining frame stope upward horizontal slicing and filling mining method safety factor method multi-point displacement measurement
下载PDF
Longwall mining “cutting cantilever beam theory” and 110 mining method in China——The third mining science innovation 被引量:66
8
作者 Manchao He Guolong Zhu Zhibiao Guo 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2015年第5期483-492,共10页
With the third innovation in science and technology worldwide, China has also experienced thismarvelous progress. Concerning the longwall mining in China, the "masonry beam theory" (MBT) wasfirst proposed in the 1... With the third innovation in science and technology worldwide, China has also experienced thismarvelous progress. Concerning the longwall mining in China, the "masonry beam theory" (MBT) wasfirst proposed in the 1960s, illustrating that the transmission and equilibrium method of overburdenpressure using reserved coal pillar in mined-out areas can be realized. This forms the so-called "121mining method", which lays a solid foundation for development of mining science and technology inChina. The "transfer rock beam theory" (TRBT) proposed in the 1980s gives a further understanding forthe transmission path of stope overburden pressure and pressure distribution in high-stress areas. In thisregard, the advanced 121 mining method was proposed with smaller coal pillar for excavation design,making significant contributions to improvement of the coal recovery rate in that era. In the 21st century,the traditional mining technologies faced great challenges and, under the theoretical developmentspioneered by Profs. Minggao Qian and Zhenqi Song, the "cutting cantilever beam theory" (CCBT) wasproposed in 2008. After that the 110 mining method is formulated subsequently, namely one stope face,after the first mining cycle, needs one advanced gateway excavation, while the other one is automaticallyformed during the last mining cycle without coal pillars left in the mining area. This method can beimplemented using the CCBT by incorporating the key technologies, including the directional presplittingroof cutting, constant resistance and large deformation (CRLD) bolt/anchor supporting systemwith negative Poisson's ratio (NPR) effect material, and remote real-time monitoring technology. TheCCBT and 110 mining method will provide the theoretical and technical basis for the development ofmining industry in China. 展开更多
关键词 mining innovation 121 mining method Cutting cantilever beam theory (CCBT) Non-pillar mining 110 mining method
下载PDF
Principles of the roof cut short-arm beam mining method (110 method) and its mining-induced stress distribution 被引量:12
9
作者 Tao Zhigang Song Zhigang +2 位作者 He Manchao Meng Zhigang Pang Shihui 《International Journal of Mining Science and Technology》 EI CSCD 2018年第3期391-396,共6页
Since the 1960 s, mining science and technology in China has experienced two technical innovations, i.e.the ‘‘Masonry Beam Theory(MBT)" and ‘‘Transfer Rock Beam Theory(TRBT)". Based on those theories, th... Since the 1960 s, mining science and technology in China has experienced two technical innovations, i.e.the ‘‘Masonry Beam Theory(MBT)" and ‘‘Transfer Rock Beam Theory(TRBT)". Based on those theories, the conventional mining method(being called the 121 mining method) was established, consisting of excavating two tunnels with a pillar left for mining a working panel. However, with increasing mining depth,engineering geological disasters in the underground caverns have been frequently encountered. In addition, the use of the coal-pillar mining results in a large amount of coal resources unexploited. In order to address the problems above, the ‘‘Roof Cut Short-Arm Beam Theory(RCSBT), being called the 110 mining method)" was proposed by He Manchao in 2008. The 110 mining method features the mining of one coal seam panel, excavating necessarily only one roadway tunnel and leaving no pillars. Realization of the 110 mining method includes the following steps:(1) directional pre-splitting roof cutting,(2) supporting the roof by using high Constant Resistance Large Deformation bolt/cable(CRLD), and(3) blocking gangue by hydraulic props. This paper presents an overview of the principles, techniques and application of the 110 mining method. Special emphasis is placed on the numerical simulation of the geostress distribution found in the mining panel using the 110 method compared to that of the 121 method. In addition, the stress distribution on the ‘‘short beam" left by the roof cutting when performing the 110 method was also investigated using both numerical simulation and theoretical formulation. 展开更多
关键词 mining innovation 121 mining method Cutting cantilever beam theory Non-pillar mining 110 mining method
下载PDF
Analysis of factors and countermeasures of mining subsidence in Kaiyang Phosphorus Mine 被引量:11
10
作者 邓建 边利 +2 位作者 李夕兵 赵国彦 王新民 《Journal of Central South University of Technology》 EI 2006年第6期733-737,共5页
Ground crack and subsidence were investigated in Kaiyang Phosphorus Mine as an example. Contribution factors to cause ground crack and mining subsidence were studied, including mining method, mining depth and ore thic... Ground crack and subsidence were investigated in Kaiyang Phosphorus Mine as an example. Contribution factors to cause ground crack and mining subsidence were studied, including mining method, mining depth and ore thickness and stope size, dip angle of orebody, geological structure, nature of overburden and water contents, and roof supports, etc. Countermeasures against cracks and subsidence were put forward. The uniaxial compressive strength of compounded phosphorus gypsum after 28 d of curing period was tested to be more than 1 MPa. Phosphorus gypsum can be used as materials for the backfill of stope. By comparison and numerical simulation, cut and fill mining method with middle-deep drilling holes and ore transportation by blasting force was selected as the optimum mining method in Kaiyang Phosphorus Mine. 展开更多
关键词 mining subsidence ground crack cut and fill mining method Kaiyang Phosphorus mine
下载PDF
Investigation and characterization of mining subsidence in Kaiyang Phosphorus Mine 被引量:8
11
作者 邓建 边利 《Journal of Central South University of Technology》 EI 2007年第3期413-417,共5页
In Kaiyang Phosphorus Mine, serious environmental and safety problems are caused by large scale mining activities in the past 40 years. These problems include mining subsidence, low recovery ratio, too much dead ore i... In Kaiyang Phosphorus Mine, serious environmental and safety problems are caused by large scale mining activities in the past 40 years. These problems include mining subsidence, low recovery ratio, too much dead ore in pillars, and pollution of phosphorus gypsum. Mining subsidence falls into four categories: curved ground and mesa, ground cracks and collapse hole, spalling and eboulement, slope slide and creeping. Measures to treat the mining subsidence were put forward: finding out and managing abandoned stopes, optimizing mining method (cut and fill mining method), selecting proper backfilling materials (phosphogypsum mixtures), avoiding disorder mining operation, and treating highway slopes. These investigations and engineering treatment methods are believed to be able to contribute to the safety extraction of ore and sustainable development in Kaiyang Phosphorus Mine. 展开更多
关键词 mining subsidence ground cracking safety Kaiyang Phosphorus mine cut and fill mining method
下载PDF
Optimization model of unascertained measurement for underground mining method selection and its application 被引量:6
12
作者 刘爱华 董蕾 董陇军 《Journal of Central South University》 SCIE EI CAS 2010年第4期744-749,共6页
An optimization model of underground mining method selection was established on the basis of the unascertained measurement theory.Considering the geologic conditions,technology,economy and safety production,ten main f... An optimization model of underground mining method selection was established on the basis of the unascertained measurement theory.Considering the geologic conditions,technology,economy and safety production,ten main factors influencing the selection of mining method were taken into account,and the comprehensive evaluation index system of mining method selection was constructed.The unascertained evaluation indices corresponding to the selected factors for the actual situation were solved both qualitatively and quantitatively.New measurement standards were constructed.Then,the unascertained measurement function of each evaluation index was established.The index weights of the factors were calculated by entropy theory,and credible degree recognition criteria were established according to the unascertained measurement theory.The results of mining method evaluation were obtained using the credible degree criteria,thus the best underground mining method was determined.Furthermore,this model was employed for the comprehensive evaluation and selection of the chosen standard mining methods in Xinli Gold Mine in Sanshandao of China.The results show that the relative superiority degrees of mining methods can be calculated using the unascertained measurement optimization model,so the optimal method can be easily determined.Meanwhile,the proposed method can take into account large amount of uncertain information in mining method selection,which can provide an effective way for selecting the optimal underground mining method. 展开更多
关键词 mining engineering underground mining method optimization model unascertained measurement theory information entropy
下载PDF
Application of reliability-centered maintenance for productivity improvement of open pit mining equipment:Case study of Sungun Copper Mine 被引量:5
13
作者 Amin Moniri Morad Mohammad Pourgol-Mohammad Javad Sattarvand 《Journal of Central South University》 SCIE EI CAS 2014年第6期2372-2382,共11页
Equipment plays an important role in open pit mining industry and its cost competence at efficient operation and maintenance techniques centered on reliability can lead to significant cost reduction.The application of... Equipment plays an important role in open pit mining industry and its cost competence at efficient operation and maintenance techniques centered on reliability can lead to significant cost reduction.The application of optimal maintenance process was investigated for minimizing the equipment breakdowns and downtimes in Sungun Copper Mine.It results in the improved efficiency and productivity of the equipment and lowered expenses as well as the increased profit margin.The field operating data of 10 trucks are used to estimate the failure and maintenance profile for each component,and modeling and simulation are accomplished by using reliability block diagram method.Trend analysis was then conducted to select proper probabilistic model for maintenance profile.Then reliability of the system was evaluated and importance of each component was computed by weighted importance measure method.This analysis led to identify the items with critical impact on availability of overall equipment in order to prioritize improvement decisions.Later,the availability of trucks was evaluated using Monte Carlo simulation and it is revealed that the uptime of the trucks is around 11000 h at 12000 operation hours.Finally,uncertainty analysis was performed to account for the uncertainty sources in data and models. 展开更多
关键词 operating costs maintenance mining dump truck RELIABILITY AVAILABILITY UNCERTAINTY
下载PDF
Research and application of mechanical models for the whole process of 110 mining method roof structural movement 被引量:10
14
作者 BIAN Wen-hui YANG Jun +2 位作者 HE Man-chao ZHU Chun XU Dong-ming 《Journal of Central South University》 SCIE EI CAS CSCD 2022年第9期3106-3124,共19页
For the 110 mining method,it is challenging to accurately calculate the support resistance of the roadway due to the lack of understanding of the dynamic movement of the overlying strata in this method.The consequenti... For the 110 mining method,it is challenging to accurately calculate the support resistance of the roadway due to the lack of understanding of the dynamic movement of the overlying strata in this method.The consequential excessive support results in a significant increase in the cost of roadway support.The authors explored the overlying strata movement and roadway deformation of the gob-entry retaining in the 110 mining method to solve this problem.First,the typical stages of the roof-cutting gob-side entry were defined.Second,the mechanical model and calculation formula of the support resistance on the roof were explored.Then,using numerical simulation software,the starting ranges of the specific supports at different stages were verified and the feasibility of the support scheme was examined.Finally,combined with the field measurement data,the stress and the deformation of the gob roadway at different stages under the influence of two mining processes in the 110 mining method were obtained.The numerical simulation results obtained are consistent with the field test results,providing a theoretical basis for precision support at different stages by the 110 mining method. 展开更多
关键词 110 mining method gob-side entry retaining roof structure movement mechanical model
下载PDF
Mining truck scheduling with stochastic maintenance cost 被引量:4
15
作者 Erkan TOPAL Salih RAMAZAN 《Journal of Coal Science & Engineering(China)》 2012年第3期313-319,共7页
Open pit mining operations utilize large scale and expensive equipment. For the mines implementing shovel and truck operation system, trucks constitute a large portion of these equipment and are used for hauling the m... Open pit mining operations utilize large scale and expensive equipment. For the mines implementing shovel and truck operation system, trucks constitute a large portion of these equipment and are used for hauling the mined materials. In order to have sustainable and viable operation, these equipment need to be utilized efficiently with minimum operating cost. Maintenance cost is a significant proportion of the overall operating costs. The maintenance cost of a truck changes non-linearly depending on the type, age and truck types. A new approach based on stochastic integer programming (SIP) techniques is used for annually scheduling a fixed fleet of mining trucks in a given operation, over the life of mine (multi-year time horizon) to minimize maintenance cost. The maintenance cost data in mining usually has uncertainty caused from the variability of the operational conditions at mines. To estimate the cost, usually historic data from different operations for new mines, and/or the historic data at the operating mines are used. However, maintenance cost varies depending on road conditions, age of equipment and many other local conditions at an operation. Traditional models aim to estimate the maintenance cost as a deterministic single value and financial evaluations are based on the estimated value. However, it does not provide a confidence on the estimate. The proposed model in this study assumes the truck maintenance cost is a stochastic parameter due to the significant level of uncertainty in the data and schedules the available fleet to meet the annual production targets. The scheduling has been performed by applying both the proposed stochastic and deterministic approaches. The approach provides a distribution for the maintenance cost of the optimized equipment schedule minimizing the cost. 展开更多
关键词 mining truck scheduling mixed integer programming minimizing stochastic cost mining equipment
下载PDF
Monte Carlo Analytic Hierarchy Process (MAHP) approach to selection of optimum mining method 被引量:8
16
作者 Ataei Mohammad Shahsavany Hashem Mikaeil Reza 《International Journal of Mining Science and Technology》 SCIE EI 2013年第4期561-566,共6页
One of the most critical and complicated steps in mine design is a selection of suitable mining method based upon geological,geotechnical,geographical,safety and economical parameters.The aim of this study is developi... One of the most critical and complicated steps in mine design is a selection of suitable mining method based upon geological,geotechnical,geographical,safety and economical parameters.The aim of this study is developing a Monte Carlo simulation to selection the optimum mining method by using effective and major criteria and at the same time,taking subjective judgments of decision makers into consideration.Proposed approach is based on the combination of Monte Carlo simulation with conventional Analytic Hierarchy Process(AHP).Monte Carlo simulation is used to determine the confdence level of each alternative’s score,is calculated by AHP,with the respect to the variance of decision makers’opinion.The proposed method is applied for Jajarm Bauxite Mine in Iran and eventually the most appropriate mining methods for this mine are ranked. 展开更多
关键词 Multi-criteria decision making AHP Monte Carlo simulation mining method selection
下载PDF
Evaluation methods of man-machine-environment system for clean and safe production in phosphorus mines: A case study 被引量:5
17
作者 DONG Long-jun ZHOU Ying +2 位作者 DENG Si-jia WANG Mei SUN Dao-yuan 《Journal of Central South University》 SCIE EI CAS CSCD 2021年第12期3856-3870,共15页
Phosphorus is an essential element in agricultural production and chemical industry. However, since the risk of casualties and economic loss by mining accidents, the application of clean and safe production in phospho... Phosphorus is an essential element in agricultural production and chemical industry. However, since the risk of casualties and economic loss by mining accidents, the application of clean and safe production in phosphorus mines encounters great challenges. For this purpose, a man-machine-environment system composed of evaluation indexes was established, and the grading standards of indexes were defined. Firstly, the measurements of 39 qualitative indexes were obtained through the survey data. According to the measured values of 31 quantitative indexes, the measurements of quantitative indexes were calculated by linear measurement function(LM) and other three functions. Then the singleindex measurement evaluation matrixes were established. Secondly, the entropy weight method was used to determine the weights of each index directly. The analytic hierarchy process(AHP) was also applied to calculate the weights of index and index factor hierarchies after the established hierarchical model. The weights of system hierarchies were given by the grid-based fuzzy Borda method(GFB). The comprehensive weights were determined by the combination method of AHP and GFB(CAG). Furthermore, the multi-index comprehensive measurement evaluation vectors were obtained.Thirdly, the vectors were evaluated by the credible degree recognition(CDR) and the maximum membership(TMM)criteria. Based on the above functions, methods, and criteria, 16 combination evaluation methods were recommended.Finally, the clean and safe production grade of Kaiyang phosphate mine in China was evaluated. The results show that the LM-CAG-CDR is the most reasonable method, which can not only determine the clean and safe production grade of phosphorus mines, but also improve the development level of clean and safe mining of phosphorus mines for guidance.In addition, some beneficial suggestions and measures were also proposed to advance the clean and safe production grade of Kaiyang phosphorus mine. 展开更多
关键词 phosphorus mines clean and safe production man-machine-environment system unascertained measurement evaluation grid-based fuzzy borda method analytic hierarchy process
下载PDF
Statistical approach to determination of overhaul and maintenance cost of loading equipment in surface mining 被引量:8
18
作者 Lashgari Ali Sayadi Ahmad Reza 《International Journal of Mining Science and Technology》 SCIE EI 2013年第3期441-446,共6页
The purpose of this research was to develop a new approach in determination of overhaul and maintenance cost of loading equipment in surface mining. Two statistical models including univariate exponential regression (... The purpose of this research was to develop a new approach in determination of overhaul and maintenance cost of loading equipment in surface mining. Two statistical models including univariate exponential regression (UER) and multivariate linear regression (MLR) were used in this study. Loading equipment parameters such as bucket capacity, machine weight, engine power, boom length, digging depth, and dumping height were considered as variables. The results obtained by models and mean absolute error rate indicate that these models can be applied as the useful tool in determination of overhaul and maintenance cost of loading equipment. The results of this study can be used by the decision-makers for the specific surface mining operations. 展开更多
关键词 Overhaul and maintenance cost Loading equipment Surface mining Univariate exponential regression Multivariate linear regression Principal component analysis
下载PDF
Field application of non-blasting mechanized mining using high-frequency impact hammer in deep hard rock mine 被引量:2
19
作者 Shao-feng WANG Li-cheng SUN +3 位作者 Yu TANG Yue JING Xi-bing LI Jin-rui YAO 《Transactions of Nonferrous Metals Society of China》 SCIE EI CAS CSCD 2022年第9期3051-3064,共14页
A non-blasting mechanized mining experiment was carried out with a high-frequency impact hammer,and the daily mining performance was recorded to explore the applicability of the high-frequency impact hammer in deep ha... A non-blasting mechanized mining experiment was carried out with a high-frequency impact hammer,and the daily mining performance was recorded to explore the applicability of the high-frequency impact hammer in deep hard rock mines.Before the field application,the scope of the excavation damage zone was monitored,and rock samples were obtained from the ore body to be mined to carry out a series of laboratory experiments.Field application results show that the overall excavation efficiency reaches 50.6 t/h,and the efficiency of pillar excavation after excavating stress relief slot reaches 158.2 t/h.The results indicate that the non-blasting mechanized mining using high-frequency impact hammer has a good application in deep hard rock mines,and the stress relief slot is conducive to mechanical excavation.In addition,the high-frequency impact hammer also exhibits the advantages of high utilization rate of labor hours,small lumpiness of spalling ore,little dust,and little excavation damage.Finally,according to the field application and laboratory experiment results,a non-blasting mechanized mining method for hard rock mines based on high-frequency impact hammer is proposed. 展开更多
关键词 hard rock mine non-blasting mechanized mining high-frequency impact hammer excavation damage zone stress relief slot mining method
下载PDF
An ideal point method adopting grey relational entropy to estimate life cycle cost with effectiveness of torpedo 被引量:2
20
作者 梁庆卫 宋保维 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2008年第4期491-493,共3页
To making the decision of the developing blue prints,ideal point method was selected to estimate the life cycle cost with effectiveness of torpedo.At the same time,the concept of grey relational entropy of the grey sy... To making the decision of the developing blue prints,ideal point method was selected to estimate the life cycle cost with effectiveness of torpedo.At the same time,the concept of grey relational entropy of the grey system theory was adopted to compute the distance between each blue print and the ideal point(or negative ideal point).The blue print,nearest to the ideal point and farthest to the negative ideal point,is the best one.As an example,four blue prints of torpedo were estimated.The result indicates the practical value of this method. 展开更多
关键词 TORPEDO life cycle cost EFFECTIVENESS ideal point method grey relational entronv
下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部