期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
A Fast Insertion Tabu Search with Conflict-Avoidance Heuristic for the Multisatellite Multimode Crosslink Scheduling Problem 被引量:1
1
作者 Weiyi Yang Lei He +2 位作者 Xiaolu Liu Weican Meng Yingwu Chen 《Tsinghua Science and Technology》 SCIE EI CAS CSCD 2024年第3期843-862,共20页
An agile earth-observing satellite equipped with multimode cameras capable of transmitting observation data to other satellites is developed to rapidly respond to requests with multiple observation modes.This gives ri... An agile earth-observing satellite equipped with multimode cameras capable of transmitting observation data to other satellites is developed to rapidly respond to requests with multiple observation modes.This gives rise to the Multisatellite Multimode Crosslink Scheduling(MMCS)problem,which involves allocating observation requests to agile satellites,selecting appropriate timing and observation modes for the requests,and transmitting the data to the ground station via the satellite communication system.Herein,a mixed integer programming model is introduced to include all complex time and operation constraints.To solve the MMCS problem,a two-stage heuristic method,called Fast insertion Tabu Search with Conflict-avoidance(FTS-C)heuristic,is developed.In the first stage,a conflict-avoidance insertion algorithm is designed to generate a high-quality initial solution by considering the requests transmission and download.Further,the tabu search-based second stage optimizes the initial solution.Finally,an extensive empirical study based on a real-world situation demonstrates that FTS-C can generate a solution with higher quality in less time than other state-of-the-art algorithms and the CPLEX solver. 展开更多
关键词 earth observation satellites scheduling tabu search heuristic data transmission and download mixedinteger programming model
原文传递
A Mixed-integer SDP Solution to Distributionally Robust Unit Commitment with Second Order Moment Constraints 被引量:5
2
作者 Xiaodong Zheng Haoyong Chen +3 位作者 Yan Xu Zhengmao Li Zhenjia Lin Zipeng Liang 《CSEE Journal of Power and Energy Systems》 SCIE CSCD 2020年第2期374-383,共10页
A power system unit commitment(UC)problem considering uncertainties of renewable energy sources is investigated in this paper,through a distributionally robust optimization approach.We assume that the first and second... A power system unit commitment(UC)problem considering uncertainties of renewable energy sources is investigated in this paper,through a distributionally robust optimization approach.We assume that the first and second order moments of stochastic parameters can be inferred from historical data,and then employed to model the set of probability distributions.The resulting problem is a two-stage distributionally robust unit commitment with second order moment constraints,and it can be recast as a mixed-integer semidefinite programming(MI-SDP)with finite constraints.The solution algorithm of the problem comprises solving a series of relaxed MI-SDPs and a subroutine of feasibility checking and vertex generation.Based on the verification of strong duality of the semidefinite programming(SDP)problems,we propose a cutting plane algorithm for solving the MI-SDPs;we also introduce an SDP relaxation for the feasibility checking problem,which is an intractable biconvex optimization.Experimental results on the IEEE 6-bus system are presented,showing that without any tuning of parameters,the real-time operation cost of distributionally robust UC method outperforms those of deterministic UC and two-stage robust UC methods in general,and our method also enjoys higher reliability of dispatch operation. 展开更多
关键词 Distributionally robust optimization mixedinteger semidefinite programming probability distribution renewable energy integration unit commitment
原文传递
Optimal transmission switching to eliminate voltage violations during light-load periods using decomposition approach 被引量:4
3
作者 Boshi ZHAO Zechun HU +2 位作者 Qian ZHOU Hongcai ZHANG Yonghua SONG 《Journal of Modern Power Systems and Clean Energy》 SCIE EI CSCD 2019年第2期297-308,共12页
With the rapid load increase in some countries such as China, power grids are becoming more strongly interconnected, and the differences between peak and valley loads are also increasing. As a result, some bulk power ... With the rapid load increase in some countries such as China, power grids are becoming more strongly interconnected, and the differences between peak and valley loads are also increasing. As a result, some bulk power systems are facing high voltage limit violations during light-load periods. This paper proposes to utilize transmission switching(TS) to eliminate voltage violations. The TS problem is formed as a mixed-integer nonlinear program(MINLP) with AC power flow constraints and binary variables. The proposed MINLP problem is non-deterministic polynomial hard.To efficiently solve the problem, a decomposition approach is developed. This approach decomposes the original problem into a mixedinteger linear programming master problem and an AC optimal power flow slave problem that is used to check the AC feasibility. Prevention of islanding is also taken into consideration to ensure the feasibility of the TS results.The modified IEEE 39-bus and IEEE 57-bus test systems are used to demonstrate the applicability and effectiveness of the proposed method. 展开更多
关键词 Transmission switching VOLTAGE VIOLATION OPTIMAL power flow DECOMPOSITION APPROACH mixedinteger programming
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部