The Large Sky Area Multi-Object Fiber Spectroscopic Telescope (LAMOST, also called the Guo Shou Jing Telescope) is a special reflecting Schmidt telescope. LAMOST’s special design allows both a large aperture (effecti...The Large Sky Area Multi-Object Fiber Spectroscopic Telescope (LAMOST, also called the Guo Shou Jing Telescope) is a special reflecting Schmidt telescope. LAMOST’s special design allows both a large aperture (effective aperture of 3.6 m–4.9 m) and a wide field of view (FOV) (5°). It has an innovative active reflecting Schmidt configuration which continuously changes the mirror’s surface that adjusts during the observation process and combines thin deformable mirror active optics with segmented active optics. Its primary mirror (6.67m×6.05 m) and active Schmidt mirror (5.74m×4.40 m) are both segmented, and composed of 37 and 24 hexagonal sub-mirrors respectively. By using a parallel controllable fiber positioning technique, the focal surface of 1.75 m in diameter can accommodate 4000 optical fibers. Also, LAMOST has 16 spectrographs with 32 CCD cameras. LAMOST will be the telescope with the highest rate of spectral acquisition. As a national large scientific project, the LAMOST project was formally proposed in 1996, and approved by the Chinese government in 1997. The construction started in 2001, was completed in 2008 and passed the official acceptance in June 2009. The LAMOST pilot survey was started in October 2011 and the spectroscopic survey will launch in September 2012. Up to now, LAMOST has released more than 480 000 spectra of objects. LAMOST will make an important contribution to the study of the large-scale structure of the Universe, structure and evolution of the Galaxy, and cross-identification of multiwaveband properties in celestial objects.展开更多
Complex product development will inevitably face the design planning of the multi-coupled activities, and overlapping these activities could potentially reduce product development time, but there is a risk of the addi...Complex product development will inevitably face the design planning of the multi-coupled activities, and overlapping these activities could potentially reduce product development time, but there is a risk of the additional cost. Although the downstream task information dependence to the upstream task is already considered in the current researches, but the design process overall iteration caused by the information interdependence between activities is hardly discussed; especially the impact on the design process' overall iteration from the valid information accumulation process. Secondly, most studies only focus on the single overlapping process of two activities, rarely take multi-segment and multi-ply overlapping process of multi coupled activities into account; especially the inherent link between product development time and cost which originates from the overlapping process of multi coupled activities. For the purpose of solving the above problems, as to the insufficiency of the accumulated valid information in overlapping process, the function of the valid information evolution (VIE) degree is constructed. Stochastic process theory is used to describe the design information exchange and the valid information accumulation in the overlapping segment, and then the planning models of the single overlapping segment are built. On these bases, by analyzing overlapping processes and overlapping features of multi-coupling activities, multi-segment and multi-ply overlapping planning models are built; by sorting overlapping processes and analyzing the construction of these planning models, two conclusions are obtained: (1) As to multi-segment and multi-ply overlapping of multi coupled activities, the total decrement of the task set development time is the sum of the time decrement caused by basic overlapping segments, and minus the sum of the time increment caused by multiple overlapping segments; (2) the total increment of development cost is the sum of the cost increment caused by all overlapping process. And then, based on overlapping degree analysis of these planning models, by the V1E degree function, the four lemmas theory proofs are represented, and two propositions are finally proved: (1) The multi-ply overlapping of the multi coupled activities will weaken the basic overlapping effect on the development cycle time reduction (2) Overlapping the multi coupled activities will decrease product development cycle, but increase product development cost. And there is trade-off between development time and cost. And so, two methods are given to slacken and eliminate multi-ply overlapping effects. At last, an example about a vehicle upper subsystem design illustrates the application of the proposed models; compared with a sequential execution pattern, the decreasing of development cycle (22%) and the increasing of development cost (3%) show the validity of the method in the example The proposed research not only lays a theoretical foundation for correctly planning complex product development process, but also provides specific and effective operation methods for overlapping multi coupled activities.展开更多
Potential surfaces and equilibrium geometries of InAs 2, In 2As, InAs 2 + and In 2As + were studied using the complete active space multi configuration self consistent field (CASMCSCF) technique. Two electronic stat...Potential surfaces and equilibrium geometries of InAs 2, In 2As, InAs 2 + and In 2As + were studied using the complete active space multi configuration self consistent field (CASMCSCF) technique. Two electronic states, namely 2B 2 and 2B 1, were found to prevail as the ground states for the InAs 2 and In 2As trimers, respectively. The corresponding adiabatic ionization energies were computed and the leading configurations of the ground states were analyzed according to the wavefunctions.展开更多
文摘The Large Sky Area Multi-Object Fiber Spectroscopic Telescope (LAMOST, also called the Guo Shou Jing Telescope) is a special reflecting Schmidt telescope. LAMOST’s special design allows both a large aperture (effective aperture of 3.6 m–4.9 m) and a wide field of view (FOV) (5°). It has an innovative active reflecting Schmidt configuration which continuously changes the mirror’s surface that adjusts during the observation process and combines thin deformable mirror active optics with segmented active optics. Its primary mirror (6.67m×6.05 m) and active Schmidt mirror (5.74m×4.40 m) are both segmented, and composed of 37 and 24 hexagonal sub-mirrors respectively. By using a parallel controllable fiber positioning technique, the focal surface of 1.75 m in diameter can accommodate 4000 optical fibers. Also, LAMOST has 16 spectrographs with 32 CCD cameras. LAMOST will be the telescope with the highest rate of spectral acquisition. As a national large scientific project, the LAMOST project was formally proposed in 1996, and approved by the Chinese government in 1997. The construction started in 2001, was completed in 2008 and passed the official acceptance in June 2009. The LAMOST pilot survey was started in October 2011 and the spectroscopic survey will launch in September 2012. Up to now, LAMOST has released more than 480 000 spectra of objects. LAMOST will make an important contribution to the study of the large-scale structure of the Universe, structure and evolution of the Galaxy, and cross-identification of multiwaveband properties in celestial objects.
基金sponsored by Jiangsu Provincial Colleges and Universities Natural Science Foundation of China (Grant No.08KJD410001)Humanities and Social Sciences Planning Fund of Ministry of Education of China (Grant No. 12YJAZH151)Humanities and Social Sciences Youth Fund of Ministry of Education of China (Grant No. 12YJCZH209)
文摘Complex product development will inevitably face the design planning of the multi-coupled activities, and overlapping these activities could potentially reduce product development time, but there is a risk of the additional cost. Although the downstream task information dependence to the upstream task is already considered in the current researches, but the design process overall iteration caused by the information interdependence between activities is hardly discussed; especially the impact on the design process' overall iteration from the valid information accumulation process. Secondly, most studies only focus on the single overlapping process of two activities, rarely take multi-segment and multi-ply overlapping process of multi coupled activities into account; especially the inherent link between product development time and cost which originates from the overlapping process of multi coupled activities. For the purpose of solving the above problems, as to the insufficiency of the accumulated valid information in overlapping process, the function of the valid information evolution (VIE) degree is constructed. Stochastic process theory is used to describe the design information exchange and the valid information accumulation in the overlapping segment, and then the planning models of the single overlapping segment are built. On these bases, by analyzing overlapping processes and overlapping features of multi-coupling activities, multi-segment and multi-ply overlapping planning models are built; by sorting overlapping processes and analyzing the construction of these planning models, two conclusions are obtained: (1) As to multi-segment and multi-ply overlapping of multi coupled activities, the total decrement of the task set development time is the sum of the time decrement caused by basic overlapping segments, and minus the sum of the time increment caused by multiple overlapping segments; (2) the total increment of development cost is the sum of the cost increment caused by all overlapping process. And then, based on overlapping degree analysis of these planning models, by the V1E degree function, the four lemmas theory proofs are represented, and two propositions are finally proved: (1) The multi-ply overlapping of the multi coupled activities will weaken the basic overlapping effect on the development cycle time reduction (2) Overlapping the multi coupled activities will decrease product development cycle, but increase product development cost. And there is trade-off between development time and cost. And so, two methods are given to slacken and eliminate multi-ply overlapping effects. At last, an example about a vehicle upper subsystem design illustrates the application of the proposed models; compared with a sequential execution pattern, the decreasing of development cycle (22%) and the increasing of development cost (3%) show the validity of the method in the example The proposed research not only lays a theoretical foundation for correctly planning complex product development process, but also provides specific and effective operation methods for overlapping multi coupled activities.
文摘Potential surfaces and equilibrium geometries of InAs 2, In 2As, InAs 2 + and In 2As + were studied using the complete active space multi configuration self consistent field (CASMCSCF) technique. Two electronic states, namely 2B 2 and 2B 1, were found to prevail as the ground states for the InAs 2 and In 2As trimers, respectively. The corresponding adiabatic ionization energies were computed and the leading configurations of the ground states were analyzed according to the wavefunctions.