期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Test and Analysis of China's First Short Conductor Sample for ITER Toroidal Field Coils
1
作者 刘勃 武玉 《Plasma Science and Technology》 SCIE EI CAS CSCD 2011年第1期106-110,共5页
In the flamework of the ITER qualification tests, the first China TF conductor sample (CNTF1) was tested at the SULTAN facility. The sample was made of two TF conductor sections manufactured from identical internal ... In the flamework of the ITER qualification tests, the first China TF conductor sample (CNTF1) was tested at the SULTAN facility. The sample was made of two TF conductor sections manufactured from identical internal stannum strands provided by the Oxford ~upercon- cluctlng technology company (OST). In order to evaluate the conductor performance, the current sharing temperature (Tcs) was measured at specified electromagnetic load cycling steps. Both conductor sections of the CNTF1 sample showed identical performance. Tcs was 7.2 K before cycling loading, and 6.9 K even after 950 cycles, without significant degradation, which substan- tially exceeds the ITER requirement of 5.7 K. The tests of the CNTF1 conductor sample showed that the electromagnetic cyclic load exhibited a negligible effect on the conductor performance. The coupling time constant 0 for AC loss was 214 ms and 71.52 nrs before and after the cycling load. respectively. The test results of the sample are compared with the strand performance and parameter model analysis. 展开更多
关键词 current sharing temperature. ITER nbasn TF conductor AC loss
下载PDF
The First Benchmarking of ITER BR Nb_3Sn Strand of CNDA
2
作者 龙风 刘方 +1 位作者 武玉 倪志鹏 《Plasma Science and Technology》 SCIE EI CAS CSCD 2012年第9期847-849,共3页
According to the International Thermonuclear Experimental Reactor (ITER) Pro- curement Arrangement (PA) of Cable-In-Conduit Conductor (CICC) unit lengths for the Toroidal Field (TF) and Poloidal Field (PF) m... According to the International Thermonuclear Experimental Reactor (ITER) Pro- curement Arrangement (PA) of Cable-In-Conduit Conductor (CICC) unit lengths for the Toroidal Field (TF) and Poloidal Field (PF) magnet systems of ITER, at the start of process qualification, the Domestic Agency (DA) shall be required to conduct a benchmarking of the room and low tem- perature acceptance tests carried out at the Strand Suppliers and/or at its Reference Laboratories designated by the ITER Organization (IO). The first benchmarking was carried out successfully in 2009. Nineteen participants from six DAs (China, European Union, Japan, South Korea, Russia, and the United States) participated in the first benchmarking. Bronze-route (BR) Nb3Sn strand and samples prepared by the ITER reference lab (CERN) were sent out to each participant by CERN. In this paper, the test facility and test results of the first benchmarking by the Chinese DA (CNDA) are presented. 展开更多
关键词 BENCHMARKING BR nbasn CNDA
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部