期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
A model of supplying poplar wood for Iranian paper & wood factories 被引量:1
1
作者 Majid Azizi 《Journal of Forestry Research》 SCIE CAS CSCD 2008年第4期323-328,共6页
The objective of this research is to design a method for an appropriate alternative to supply poplar wood as raw material for wood and paper factories in Iran. Due to the destruction of the forests and lack of proper ... The objective of this research is to design a method for an appropriate alternative to supply poplar wood as raw material for wood and paper factories in Iran. Due to the destruction of the forests and lack of proper plantation, replacement of the forest wood by the fast growing wood is vital to satisfy all requirements of these factories. A hierarchy was used to prioritize benefits, opportunities, costs and risks (BOCR) using the Analytic Hierarchy Process (AHP) ratings approach. To evaluate the "control criteria" of the system, a control hierarchy was also created and prioritized by applying the Analytic Network Process (ANP). A total of four major control criteria in the system are prioritized where each one controls a network structure evaluated by using ANE The final synthesis results of the system showed that internal poplar tree farming supplied by the forest product factories was the best choice among three potential alternatives (factory procurement, external procurement and mix procurement). 展开更多
关键词 Poplar wood wood and paper industries BOCR (Benefits Opportunities Costs and Risks) ANP analytic network process AHP analytic hierarchy process
下载PDF
MAKING AND VALIDATING COMPLEX DECISIONS WITH THE AHP/ANP 被引量:44
2
作者 Thomas L. SAATY 《Journal of Systems Science and Systems Engineering》 SCIE EI CSCD 2005年第1期1-36,共36页
Several examples that serve to validate the AHP/ANP with matrices hierarchies and networks are given in this paper. They are then followed by a discussion of the real numbers and how they are generated without the nee... Several examples that serve to validate the AHP/ANP with matrices hierarchies and networks are given in this paper. They are then followed by a discussion of the real numbers and how they are generated without the need for an absolute zero, and how they define an absolute scale of measurement that also does not need an absolute zero. In the AHP/ANP the measurement of an alternative depends on what other alternatives it is compared with. The result is that rank can change if alternatives are added or deleted, something that does not occur in one-at-a-time rating of the alternatives by comparing them with an ideal. An example is provided to show that this is natural and need not involve new criteria or change in judgments. A brief discussion of Utility Theory, the other multi-criteria theory, which uses interval scales to measure intangibles and some of its problems and paradoxes, is given. The references at the end include most of the papers that are adverse to the AHP with brief comments about several of them given in the paper. 展开更多
关键词 analytic hierarchy and network processes validation INPUT-OUTPUT utility theory paradoxes RANK comments and criticisms
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部