The study is to assess the present serviceability rating of Nigerian highways and <span style="font-family:;" "=""><span style="font-family:Verdana;">the load damage effe...The study is to assess the present serviceability rating of Nigerian highways and <span style="font-family:;" "=""><span style="font-family:Verdana;">the load damage effects of overloaded trucks. The researchers used the American</span><span> </span><span style="font-family:Verdana;">Association of State Highway and Transportation Officials (AASHTO) methods. In this study, the highway section of Lokoja-Abuja, Ilorin-Jebba and Abakiliki-Ogoja via Mbok roads were selected, and data were collected through an axle-load survey, automatic traffic count and from secondary sources. The rate of gross vehicle weight violation was found, ranging from 20% to 94% of the axle load distribution across the studied network. Comparing the overloaded vehicle damage factor (V.D.F.) and standard V.D.F., the range was from 1.2 to 41.34 times across the road networks studied, and this explained why the pavement structures of Nigerian roads tend to deteri</span><span><span style="font-family:Verdana;">orate during its service life rapidly. Present serviceability rating was estimated at 3.45, 4.41 and 3.35 for Lokoja-Abuja, Ilorin-Jebba and Abakiliki-Ogoja roads respectively, showing depletion from their initial conditions. The damaging effects of the HGV are less severe at Lokoja-Abuja Road (with </span><i><span style="font-family:Verdana;">g</span></i><span style="font-family:Verdana;"> = 0.30), followed by </span><span><span style="font-family:Verdana;">Ilorin-Jebba Road (with </span><i><span style="font-family:Verdana;">g</span></i><span style="font-family:Verdana;"> = 0.35) and more in Abakiliki-Ogoja Road (with </span><i><span style="font-family:Verdana;">g</span></i><span style="font-family:Verdana;"> = 0.43). The heaviest overload of 94% of the 6-axle vehicles plying at the Lokoja-Abuja road could explain this intense damaging effect on the road pavement</span></span></span></span>展开更多
文摘The study is to assess the present serviceability rating of Nigerian highways and <span style="font-family:;" "=""><span style="font-family:Verdana;">the load damage effects of overloaded trucks. The researchers used the American</span><span> </span><span style="font-family:Verdana;">Association of State Highway and Transportation Officials (AASHTO) methods. In this study, the highway section of Lokoja-Abuja, Ilorin-Jebba and Abakiliki-Ogoja via Mbok roads were selected, and data were collected through an axle-load survey, automatic traffic count and from secondary sources. The rate of gross vehicle weight violation was found, ranging from 20% to 94% of the axle load distribution across the studied network. Comparing the overloaded vehicle damage factor (V.D.F.) and standard V.D.F., the range was from 1.2 to 41.34 times across the road networks studied, and this explained why the pavement structures of Nigerian roads tend to deteri</span><span><span style="font-family:Verdana;">orate during its service life rapidly. Present serviceability rating was estimated at 3.45, 4.41 and 3.35 for Lokoja-Abuja, Ilorin-Jebba and Abakiliki-Ogoja roads respectively, showing depletion from their initial conditions. The damaging effects of the HGV are less severe at Lokoja-Abuja Road (with </span><i><span style="font-family:Verdana;">g</span></i><span style="font-family:Verdana;"> = 0.30), followed by </span><span><span style="font-family:Verdana;">Ilorin-Jebba Road (with </span><i><span style="font-family:Verdana;">g</span></i><span style="font-family:Verdana;"> = 0.35) and more in Abakiliki-Ogoja Road (with </span><i><span style="font-family:Verdana;">g</span></i><span style="font-family:Verdana;"> = 0.43). The heaviest overload of 94% of the 6-axle vehicles plying at the Lokoja-Abuja road could explain this intense damaging effect on the road pavement</span></span></span></span>