In Yuanbaoshan Power Plant. it was dueto the Problems of the steam generator that theNo.2 unit, the ratedload of which was 600MW took load only from 400 MW to 420 MWin the first period of commercial operation.After te...In Yuanbaoshan Power Plant. it was dueto the Problems of the steam generator that theNo.2 unit, the ratedload of which was 600MW took load only from 400 MW to 420 MWin the first period of commercial operation.After ten years of continuous retro fit andapplication of improved technology, somemajor problems of unit were resolved step bystep and the operation level was continuouslyimproved. Now it can operate steadily from550 W to 580 MW.展开更多
文摘In Yuanbaoshan Power Plant. it was dueto the Problems of the steam generator that theNo.2 unit, the ratedload of which was 600MW took load only from 400 MW to 420 MWin the first period of commercial operation.After ten years of continuous retro fit andapplication of improved technology, somemajor problems of unit were resolved step bystep and the operation level was continuouslyimproved. Now it can operate steadily from550 W to 580 MW.