In 1979, unavailability of MFWS (Main Feedwater System) in TMI (Three Mile Island) Unit-2 happened in the United States. To make it worse, due to malfunction of Isolation Control Valves in AFWS (Auxiliary Feedwat...In 1979, unavailability of MFWS (Main Feedwater System) in TMI (Three Mile Island) Unit-2 happened in the United States. To make it worse, due to malfunction of Isolation Control Valves in AFWS (Auxiliary Feedwater System), the supply of cooling water to SGs (Steam Generators) was delayed approximately 8 minutes compared to AOP (Abnormal Operating Procedure). In the long run, on account of deferred heat sink provision to SGs, the reactor core was melted partially. It was the first critical accident in the US commercial NPP (Nuclear Power Plant) history. Hence, after TMI Accident, US NRC (Nuclear Regulatory Committee) suggested more than one hundred alternatives to improve safety and reliability of NPP. Among these countermeasures, one proposal was related to training area. It was SAT (Systematic Approach to Training) methodology. Therefore, the goal of SAT is the enhancement of NPP stability through training point of view. Since the appearance of SAT in the nuclear industry, it has acquired the unwavering position in the US NPP training field. Meanwhile, significance of NPP decommissioning has been soared up in South Korea since the announcement of Kori Unit-1 decommissioning decision. According to the proclaimed plan from Korean government, Kori Unit-1 is scheduled to be decommissioned from June, 2017. Under this circumstance, nurturing sufficient number of NPP decommissioning engineers is one of the most urgent issues in South Korean nuclear industry. Hence, to elevate efficiency and consistency of training quality, SAT methodology can be a reliable solution for the training of decommissioning engineers. For this reason, the present study aims to design SAT based NPP decommissioning engineer training in South Korea.展开更多
采用土-结相互作用分区分析方法(partitioned analysis of soil-structure interaction,PASSI),对软土地基核岛厂房振动台试验中的筏基-混凝土框架模型以及桩基-混凝土框架模型进行了数值模拟,对比分析了振动台试验结果与数值模拟结果,...采用土-结相互作用分区分析方法(partitioned analysis of soil-structure interaction,PASSI),对软土地基核岛厂房振动台试验中的筏基-混凝土框架模型以及桩基-混凝土框架模型进行了数值模拟,对比分析了振动台试验结果与数值模拟结果,并对软土地基下核岛厂房土-基础-结构的地震响应特征进行了分析。对2种模型输入调幅为0.05、0.10、0.20 g的RG160、Chi-Chi与Landers地震波,对比分析了各工况下振动台试验与数值模拟的土体与结构加速度放大系数、楼层反应谱、筏基底部土压力时程、桩身应变以及桩身弯矩。结果表明:数值模拟结果能较好地反映振动台试验结果;经过土层放大作用,随着楼层的增高,振动台试验和数值模拟中的加速度放大系数随之增大,反映了同样的规律;振动台试验与数值模拟所得的土-结体系的反应谱均与输入地震动频谱特征及体系的振动特性相关;振动台试验中,筏板基础会出现倾覆现象,筏基底部土压力时程表现出“东高西低”的现象,但数值模拟中筏基底部的土压力时程未出现此种现象,其原因是数值模拟中未考虑土体与基础的接触非线性;数值模拟中群桩的地震响应与试验的宏观现象基本吻合,定量上有差异,是数值模拟中未考虑桩的非线性所致。展开更多
There are costs for doing the right thing,but regret is not one of those costs.I learned this lesson the hard way throughout a 42-year engineering career.As a young engineer,raising a family,I was more adaptable to ma...There are costs for doing the right thing,but regret is not one of those costs.I learned this lesson the hard way throughout a 42-year engineering career.As a young engineer,raising a family,I was more adaptable to management mandates,i.e.,I was more willing to be unethical to keep my job to make money and have health insurance for my family.As I grew in age,experience,and stamina,I was less adaptable,i.e.,I was more ethical.This article tells this story through events at various times in my engineering career1.Ethics define how we do the right thing.展开更多
文摘In 1979, unavailability of MFWS (Main Feedwater System) in TMI (Three Mile Island) Unit-2 happened in the United States. To make it worse, due to malfunction of Isolation Control Valves in AFWS (Auxiliary Feedwater System), the supply of cooling water to SGs (Steam Generators) was delayed approximately 8 minutes compared to AOP (Abnormal Operating Procedure). In the long run, on account of deferred heat sink provision to SGs, the reactor core was melted partially. It was the first critical accident in the US commercial NPP (Nuclear Power Plant) history. Hence, after TMI Accident, US NRC (Nuclear Regulatory Committee) suggested more than one hundred alternatives to improve safety and reliability of NPP. Among these countermeasures, one proposal was related to training area. It was SAT (Systematic Approach to Training) methodology. Therefore, the goal of SAT is the enhancement of NPP stability through training point of view. Since the appearance of SAT in the nuclear industry, it has acquired the unwavering position in the US NPP training field. Meanwhile, significance of NPP decommissioning has been soared up in South Korea since the announcement of Kori Unit-1 decommissioning decision. According to the proclaimed plan from Korean government, Kori Unit-1 is scheduled to be decommissioned from June, 2017. Under this circumstance, nurturing sufficient number of NPP decommissioning engineers is one of the most urgent issues in South Korean nuclear industry. Hence, to elevate efficiency and consistency of training quality, SAT methodology can be a reliable solution for the training of decommissioning engineers. For this reason, the present study aims to design SAT based NPP decommissioning engineer training in South Korea.
文摘There are costs for doing the right thing,but regret is not one of those costs.I learned this lesson the hard way throughout a 42-year engineering career.As a young engineer,raising a family,I was more adaptable to management mandates,i.e.,I was more willing to be unethical to keep my job to make money and have health insurance for my family.As I grew in age,experience,and stamina,I was less adaptable,i.e.,I was more ethical.This article tells this story through events at various times in my engineering career1.Ethics define how we do the right thing.