Recent progress on nuclear liquid gas phase transition (LGPT) has been reviewed, especially for the signals of LGPT in heavy ion collisions. These signals include the power-law charge distribution, cluster emission ra...Recent progress on nuclear liquid gas phase transition (LGPT) has been reviewed, especially for the signals of LGPT in heavy ion collisions. These signals include the power-law charge distribution, cluster emission rate, nuclear Zipf law, bimodality, the largest fluctuation of the fragments, Δ-scaling, caloric curve, phase coexis- tence diagram, critical temperature, critical exponent analysis, negative specific heat capacity and spinodal instability etc. The systematic works of the authors on experimental and theoretical LGPT are also introduced.展开更多
On February 25, the Unit 1 of Ling’ao Nuclear Power Plant phase II underwent a 41-day-long hot functional test successfully with its major systems satisfying the requirements for
China and Canada have signed a project award agreement for the co-operation for the Qinshan Phase Ⅲ Candu nuclear power project, marking significant progress in commercial negotiations between both countries on the c...China and Canada have signed a project award agreement for the co-operation for the Qinshan Phase Ⅲ Candu nuclear power project, marking significant progress in commercial negotiations between both countries on the construction of two 700 megawatt class Candu units. The agreement, signed between the China National Nuclear Corp (CNNC) and the Atomic Energy of Canada Ltd (AECL) in Beijing on July 12, finalized the price and commercial terms for Qinshan Phase展开更多
China and Canada nailed down a deal to build the third phase of the Qinshan Nuclear Power Plant in Zhejiang Province in East China on Nov. 26, 1996. The contract was signed in Shanghai by China National Nuclear Corp (...China and Canada nailed down a deal to build the third phase of the Qinshan Nuclear Power Plant in Zhejiang Province in East China on Nov. 26, 1996. The contract was signed in Shanghai by China National Nuclear Corp (CNNC) and Atomic Energy of Canada Ltd(AECL). AECL will construct two 700 MW heavy water reactors for the Chinese nuclear power plant.展开更多
Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant,the first commercial heavy water reactor nuclear power plant in China,was the biggest trade project performed between the governments of China and Canada.As the owner,the Thir...Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant,the first commercial heavy water reactor nuclear power plant in China,was the biggest trade project performed between the governments of China and Canada.As the owner,the Third Qinshan Nuclear Power Company(TQNPC)persisted in independent innovation management during the project construction,commissioning and self-dependent operation,efficiently realizing the three controls of the project,i.e.quality control,schedule control and investment control,and persisted in technical improvement on the basis of digestion and absorption of CANDU-6 technology to improve the unit safety and reliability.The project construction practice has helped China's nuclear power project management to becomeprogrammed,computerized,standardized and internationalized management from the existing basis.After completion of the project,with unit safe and steady operation as the prerequisite,TQNPC performed several technical modifications and innovations to continuously improve the unit performance.In the area of staff development,TQNPC paid much attention to cultivation of corporate culture,strengthed staff training and built up a good circulating mechanism with staff training and project construction promoting each other.Further to "Zero Breakthrough" and a new step forward of locolization successfully realized in Qinshan Nuclear Power Plant and Nuclear Power Qinshan Joint Venture Company,the improvement and developemnt of nuclear power project management level in Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant provided reference for promotion of nuclear power development in China and standardized management of introducing large imported project.展开更多
The temperature of fragmenting source in central heavy-ion collisions at Fermi energy is investigated by the isospin-dependent quantum molecular dynamics model in combination with the statistical decay model GEMINI.Fi...The temperature of fragmenting source in central heavy-ion collisions at Fermi energy is investigated by the isospin-dependent quantum molecular dynamics model in combination with the statistical decay model GEMINI.Five different nuclear thermometers are used to extract nuclear temperature.We find that the He and Li isotope temperature reaches a plateau at about 70-100 MeV/nucleon of beam energy.The slope temperature and the quadrupole fluctuation temperature give high values.The quantum slope temperature and the quantum quadrupole fluctuation temperature are more close to the He and Li isotope temperatures.展开更多
The heavy-ion phase-space exploration (HIPSE) model is used to discuss the origin of the nuclear spin in intermediate energy heavy-ion collision (HIC).The spin of maximal projectile-like fragment is found to depend st...The heavy-ion phase-space exploration (HIPSE) model is used to discuss the origin of the nuclear spin in intermediate energy heavy-ion collision (HIC).The spin of maximal projectile-like fragment is found to depend strongly on impact parameter of a reaction system,while it relates weakly to the collision violence.Some interesting multi-fragmentation phenomena related to the spin are shown.We also found that the excitation energy in the de-excitation stage plays a robust role at the de-excitation stage in HIC.展开更多
基金the National Natural Science Foundation of China for the Distinguished Young Scholar (No. 19725521) the National Natural Science Foundation of China (No. 19705012)+1 种基金 the Science and Technology Development Foundation of Shanghai (No.97QA14038)the Major State Basic Research Development Program of China (No. G200077400)
文摘Recent progress on nuclear liquid gas phase transition (LGPT) has been reviewed, especially for the signals of LGPT in heavy ion collisions. These signals include the power-law charge distribution, cluster emission rate, nuclear Zipf law, bimodality, the largest fluctuation of the fragments, Δ-scaling, caloric curve, phase coexis- tence diagram, critical temperature, critical exponent analysis, negative specific heat capacity and spinodal instability etc. The systematic works of the authors on experimental and theoretical LGPT are also introduced.
文摘On February 25, the Unit 1 of Ling’ao Nuclear Power Plant phase II underwent a 41-day-long hot functional test successfully with its major systems satisfying the requirements for
文摘China and Canada have signed a project award agreement for the co-operation for the Qinshan Phase Ⅲ Candu nuclear power project, marking significant progress in commercial negotiations between both countries on the construction of two 700 megawatt class Candu units. The agreement, signed between the China National Nuclear Corp (CNNC) and the Atomic Energy of Canada Ltd (AECL) in Beijing on July 12, finalized the price and commercial terms for Qinshan Phase
文摘China and Canada nailed down a deal to build the third phase of the Qinshan Nuclear Power Plant in Zhejiang Province in East China on Nov. 26, 1996. The contract was signed in Shanghai by China National Nuclear Corp (CNNC) and Atomic Energy of Canada Ltd(AECL). AECL will construct two 700 MW heavy water reactors for the Chinese nuclear power plant.
文摘Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant,the first commercial heavy water reactor nuclear power plant in China,was the biggest trade project performed between the governments of China and Canada.As the owner,the Third Qinshan Nuclear Power Company(TQNPC)persisted in independent innovation management during the project construction,commissioning and self-dependent operation,efficiently realizing the three controls of the project,i.e.quality control,schedule control and investment control,and persisted in technical improvement on the basis of digestion and absorption of CANDU-6 technology to improve the unit safety and reliability.The project construction practice has helped China's nuclear power project management to becomeprogrammed,computerized,standardized and internationalized management from the existing basis.After completion of the project,with unit safe and steady operation as the prerequisite,TQNPC performed several technical modifications and innovations to continuously improve the unit performance.In the area of staff development,TQNPC paid much attention to cultivation of corporate culture,strengthed staff training and built up a good circulating mechanism with staff training and project construction promoting each other.Further to "Zero Breakthrough" and a new step forward of locolization successfully realized in Qinshan Nuclear Power Plant and Nuclear Power Qinshan Joint Venture Company,the improvement and developemnt of nuclear power project management level in Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant provided reference for promotion of nuclear power development in China and standardized management of introducing large imported project.
基金Supported by National Natural Science Foundation of China(Grant Nos.11025524 and 11161130520)National Basic Research Program of China(Grant No.2010CB832903)
文摘The temperature of fragmenting source in central heavy-ion collisions at Fermi energy is investigated by the isospin-dependent quantum molecular dynamics model in combination with the statistical decay model GEMINI.Five different nuclear thermometers are used to extract nuclear temperature.We find that the He and Li isotope temperature reaches a plateau at about 70-100 MeV/nucleon of beam energy.The slope temperature and the quadrupole fluctuation temperature give high values.The quantum slope temperature and the quantum quadrupole fluctuation temperature are more close to the He and Li isotope temperatures.
基金Partially supported by NSFC of China under contract No.11035009,No.10979074,No.10875160,No.10805067 and No.10975174the 973-Program under contract No.2007CB815004+1 种基金the Shanghai Development Foundation for Science and Technology under contract No.09JC1416800the Knowledge Innovation Project of CAS under Grant No.KJCX2-EW-N01
文摘The heavy-ion phase-space exploration (HIPSE) model is used to discuss the origin of the nuclear spin in intermediate energy heavy-ion collision (HIC).The spin of maximal projectile-like fragment is found to depend strongly on impact parameter of a reaction system,while it relates weakly to the collision violence.Some interesting multi-fragmentation phenomena related to the spin are shown.We also found that the excitation energy in the de-excitation stage plays a robust role at the de-excitation stage in HIC.