期刊文献+
共找到7篇文章
< 1 >
每页显示 20 50 100
Study on Fatigue Behavior of Anchorage of Cable and Girder of Long Span Cable-Stayed Bridge
1
作者 刘庆宽 强士中 张强 《Journal of Modern Transportation》 2001年第1期42-49,共8页
A full scale model test is done and a FEM model is established to investigate the fatigue behavior of the Nancha cable stayed bridge of the Nanjing Second Yangtz River Bridge, a long span steel bridge with a main sp... A full scale model test is done and a FEM model is established to investigate the fatigue behavior of the Nancha cable stayed bridge of the Nanjing Second Yangtz River Bridge, a long span steel bridge with a main span of 628 m. The results of test and FEM are analyzed and compared. It is shown that they are in good agreement. It is verified that the fatigue characteristic of the anchorage structure of cable and girder of the bridge satisfies the requirements specified by Chinese, British and American codes. 展开更多
关键词 cable stayed bridges anchorage of cable and girder FATIGUE
下载PDF
New algorithm of shape-finding of suspension bridge with spatial cables
2
作者 Xiao-Kang Deng Zhuo Deng Xin Ren 《Theoretical & Applied Mechanics Letters》 CAS CSCD 2023年第1期33-40,共8页
A new algorithm is proposed to solve the problems of shape-finding of suspension bridge with spatial cables what include tedious iteration,slow convergence speed and even no convergent under some circumstances.In this... A new algorithm is proposed to solve the problems of shape-finding of suspension bridge with spatial cables what include tedious iteration,slow convergence speed and even no convergent under some circumstances.In this paper,the stress analysis of the main cable is carried out,and the relationship between the slope change and the coordinate change is found.This paper also discussed how to find the minimum slope point of symmetrical or asymmetric main cable,and the deformation compatibility equation is established and solved to obtain the shape of main cable.The algorithm in this paper can ensure the convergence of the solution for the suspension bridge with spatial cables.The calculation accuracy is high through the demonstration of the calculation examples. 展开更多
关键词 Spatial cables Suspenders Shape-finding Slope of cable Coupling Unequal height main tower
下载PDF
Dynamic responses of cable-stayed bridges to vehicular loading including the effects of the local vibration of cables 被引量:6
3
作者 He ZHANG Xu XIE 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2011年第8期593-604,共12页
Stay cables, the primary load carrying components of cable-stayed bridges (CSBs), are characterised by high flexi-bility which increases with the span of the bridge. This makes stay cables vulnerable to local vibratio... Stay cables, the primary load carrying components of cable-stayed bridges (CSBs), are characterised by high flexi-bility which increases with the span of the bridge. This makes stay cables vulnerable to local vibrations which may have significant effects on the dynamic responses of long-span CSBs. Hence, it is essential to account for these effects in the assessment of the dynamics CSBs. In this paper, the dynamic responses of CSBs under vehicular loads are studied using the finite element method (FEM), while the local vibration of stay cables is analyzed using the substructure method. A case study of a cable-stayed steel bridge with a center span of 448 m demonstrates that stay cables undergo large displacements in the primary mode of the whole bridge although, in general, a cable’s local vibrations are not obvious. The road surface roughness has significant effects on the interaction force between the deck and vehicle but little effect on the global response of the bridge. Load impact factors of the main girder and tower are small, and the impact factors of the tension of cables are larger than those of the displacements of girders and towers. 展开更多
关键词 cable-stayed bridge(CSB) Vehicular load Local vibration of cable Impact effect
原文传递
Numerical Modeling of a Spherical Buoy Moored by a Cable in Three Dimensions 被引量:3
4
作者 ZHU Xiangqian YOO Wan-Suk 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2016年第3期588-597,共10页
Floating facilities have been studied based on the static analysis of mooring cables over the past decades. To analyze the floating system of a spherical buoy moored by a cable with a higher accuracy than before, the ... Floating facilities have been studied based on the static analysis of mooring cables over the past decades. To analyze the floating system of a spherical buoy moored by a cable with a higher accuracy than before, the dynamics of the cables are considered in the construction of the numerical modeling. The cable modeling is established based on a new element frame through which the hydrodynamic loads are expressed efficiently. The accuracy of the cable modeling is verified with an experiment that is conducted by a catenary chain moving in a water tank. In addition, the modeling of a spherical buoy is established with respect to a spherical coordinate in three dimensions, which can suffers the gravity, the variable buoyancy and Froude-Krylov loads. Finally, the numerical modeling for the system of a spherical buoy moored by a cable is established, and a virtual simulation is proceeded with the X- and Y-directional linear waves and the X-directional current. The comparison with the commercial simulation code Proteus DS indicates that the system is accurately analyzed by the numerical modeling. The tensions within the cable, the motions of the system, and the relationship between the motions and waves are illustrated according to the defined sea state. The dynamics of the cables should be considered in analyzing the floating system of a spherical buoy moored by a cable. 展开更多
关键词 numerical modeling dynamic simulation spherical buoy mooring cable dynamics of cable
下载PDF
Influence of Girder Vibration on Cable Damper's Performance of A Cable-stayed Bridge
5
作者 Dong Liang Yong Chen 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2014年第1期109-114,共6页
The model combined by cable,girder and damper is founded to study the influence of girder vibration on cable damper 's performance of a cable-stayed bridge. The complex mode method and nondimensionalization are us... The model combined by cable,girder and damper is founded to study the influence of girder vibration on cable damper 's performance of a cable-stayed bridge. The complex mode method and nondimensionalization are used to analyze the relationship between the girder's parameters and the performance of cable-related damper. The results indicate that the performance of cable-related damper will decrease greatly when the girder frequencies are near the frequencies of cable. The smaller absolute displacement of damper's piston caused by the very small vibration phase shift of girder and cable is the physical cause of the negative impact mentioned above. 展开更多
关键词 cable-stayed bridge vibration mitigation of cable girder vibration modal damping complex mode method cause analysis
下载PDF
Secrets of the ‘King of Cable’
6
作者 ANDY ZHAI 《Beijing Review》 2007年第14期40-41,共2页
From watch repairman to cable magnate, Jiang Xipei takes success in his stride Jiang Xipei, Chairman of Far East Group, has worked his way up from being an ordinary watch repairman to being China’s 'King of Cable... From watch repairman to cable magnate, Jiang Xipei takes success in his stride Jiang Xipei, Chairman of Far East Group, has worked his way up from being an ordinary watch repairman to being China’s 'King of Cable'-leading his company to a ranking of 展开更多
关键词 King of cable FAR Secrets of the
原文传递
Research on the stiffening girder erection sequence of three-tower suspension bridge
7
作者 Zheng Runqing Luo Xiheng 《Engineering Sciences》 EI 2012年第3期16-20,共5页
Compared to the conventional two-tower suspension bridge, the three-tower suspension bridge has obviously different characteristics in structural performance because of the extra middle tower and main span. The constr... Compared to the conventional two-tower suspension bridge, the three-tower suspension bridge has obviously different characteristics in structural performance because of the extra middle tower and main span. The construction sequence for the stiffening girder is significantly different between the three-tower suspension bridge and the two-tower suspension bridge. The tangential angle of the main cable is one of the controlling factors of the stiffening girder erection stage for a suspension bridge. According to 5 feasible cases for the stiffening girder erection scheme in Taizhou Bridge, the research about the tangential angle in each case mentioned above was made, and some factors that should be taken into account for the erection scheme of stiffening girder were pointed out. 展开更多
关键词 tangential angle of cable three-tower suspension bridge stiffening girder sequence of erection
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部