In order to understand the monitoring efficiency status of the well-water-level observation network in China after the completion of the 10 th "Five-year Plan " digital network project,and to provide a basis...In order to understand the monitoring efficiency status of the well-water-level observation network in China after the completion of the 10 th "Five-year Plan " digital network project,and to provide a basis for the future network optimization and equipment updating, the monitoring efficiency of the well-water-level observation network was evaluated. On the whole,61. 8% observing stations have good monitoring effectiveness,the observation environment of 73. 5% of observing stations meets the monitoring requirements of well-water-level. The operation status of the network is as a whole getting better,operation rates of 75% observing instruments are above 95%. Most well water levels can monitor crustal stress changes and seismic activities. However,some observation stations,due to inherent deficiency in wells,environmental disturbance,instrument aging,and low-level operation and maintenance,need to improve the monitoring efficiency level by taking measures such as observation environment improvement,equipment updating,and management training. About 6. 5% of the stations need to stop observation due to the unqualified observational environment.展开更多
基金funded by the National Key Basic Research Program of China(Grant No.2013CB733205)
文摘In order to understand the monitoring efficiency status of the well-water-level observation network in China after the completion of the 10 th "Five-year Plan " digital network project,and to provide a basis for the future network optimization and equipment updating, the monitoring efficiency of the well-water-level observation network was evaluated. On the whole,61. 8% observing stations have good monitoring effectiveness,the observation environment of 73. 5% of observing stations meets the monitoring requirements of well-water-level. The operation status of the network is as a whole getting better,operation rates of 75% observing instruments are above 95%. Most well water levels can monitor crustal stress changes and seismic activities. However,some observation stations,due to inherent deficiency in wells,environmental disturbance,instrument aging,and low-level operation and maintenance,need to improve the monitoring efficiency level by taking measures such as observation environment improvement,equipment updating,and management training. About 6. 5% of the stations need to stop observation due to the unqualified observational environment.