The concept of the carbon cycle in the old goaf of a coal mine based on CO_(2)utilization and storage was put forward adhering to the principle of low-carbon development,utilization of space resources in old goafs,and...The concept of the carbon cycle in the old goaf of a coal mine based on CO_(2)utilization and storage was put forward adhering to the principle of low-carbon development,utilization of space resources in old goafs,and associated gas resources development.Firstly,the evolution characteristics of overburden fissures in the goaf of the case was studied using a two-dimensional physical similarity simulation test,the sealing performance of the caprocks after stabilization was analyzed,and the fissures were counted and classi-fied.Then,the process of gaseous CO_(2)injection in the connected fissure was simulated by Ansys Fluent software,and the migration law and distribution characteristics of CO_(2)under the condition of gaseous CO_(2)injection were analyzed.Finally,the estimation models of free CO_(2)storage capacity in the old goaf were constructed considering the proportion of connected fissure and the effectiveness of CO_(2)injection.The CO_(2)storage capacity in the old goaf of the case coal mine was estimated.The results showed that a caprock group of“hard-thickness low-permeability hard-thickness”was formed after the caprock-fissures system in the goaf of the case tended to be stable vertically.The connected fissure,occlude cracks,and micro-fractures in the goaf accounted for 85.5%,8.5%,and 6%of the total fissures,respectively.Gaseous CO_(2)first migrated to the bottom of the connected fissure after CO_(2)was injected into the goaf,then spread horizontally along the bottom of the connected fissure after reaching the bottom,and finally spread longitudinally after filling the bottom of the entire connected fissure.The theoretical and effective storage capacities of free CO_(2)at normal temperature and pressure in the old goaf of the case were 9757 and 7477 t,respectively.The effective storage capacity of free CO_(2)at normal temperature and pressure in the old goaf after all minefield mined was 193404 t.The research can provide some reference for the coal mining industry to help the goal of“carbon peaking and carbon neutrality”.展开更多
Additional displacement of the building foundations over old goaf are prone to happen under the addi- tional loads induced by new buildings, weakening-rock mass by mining and seismic actions, which will cause serious ...Additional displacement of the building foundations over old goaf are prone to happen under the addi- tional loads induced by new buildings, weakening-rock mass by mining and seismic actions, which will cause serious damage to the buildings. In order to analyze the safety of the building foundations safety over the old goaf. the structure characteristics of the strata over the old goaf was investigated and the instability conditions of overhanging rocks upon old goaf were also analyzed in this paper. The results indicate that the stability of overhanging rocks is remarkably decreased by the interactions of mining fractures, earthquake force and building load, in addition, the settlement of the foundations over old goal is increased by the instability of overhanging rocks. According to the location of a new power plant in Yima Mine and its ambient conditions, we defined the influence scope of old goal via resistivity tomography. Based on the seismic parameters of the construction site, a numerical FLAC3d model of the building foundation under the seismic actions and building load was developed. The numerical results are obtained as follows: the foundation of the main power house meets the requirement of 6° seismic fortification intensity: however, under 7° seismic fortification intensity, the maximum differential settlement of foundation between the neighboring pillars is close to the maximum allowable value, while the seismic fortification intensity reaches 8°, but the safety requirements will not be satisfied.展开更多
基金the financial support from the National Natural Science Foundation of China(No.52074217)the Natural Science Basic Research Program of Shaanxi Province(No.2021JLM-26).
文摘The concept of the carbon cycle in the old goaf of a coal mine based on CO_(2)utilization and storage was put forward adhering to the principle of low-carbon development,utilization of space resources in old goafs,and associated gas resources development.Firstly,the evolution characteristics of overburden fissures in the goaf of the case was studied using a two-dimensional physical similarity simulation test,the sealing performance of the caprocks after stabilization was analyzed,and the fissures were counted and classi-fied.Then,the process of gaseous CO_(2)injection in the connected fissure was simulated by Ansys Fluent software,and the migration law and distribution characteristics of CO_(2)under the condition of gaseous CO_(2)injection were analyzed.Finally,the estimation models of free CO_(2)storage capacity in the old goaf were constructed considering the proportion of connected fissure and the effectiveness of CO_(2)injection.The CO_(2)storage capacity in the old goaf of the case coal mine was estimated.The results showed that a caprock group of“hard-thickness low-permeability hard-thickness”was formed after the caprock-fissures system in the goaf of the case tended to be stable vertically.The connected fissure,occlude cracks,and micro-fractures in the goaf accounted for 85.5%,8.5%,and 6%of the total fissures,respectively.Gaseous CO_(2)first migrated to the bottom of the connected fissure after CO_(2)was injected into the goaf,then spread horizontally along the bottom of the connected fissure after reaching the bottom,and finally spread longitudinally after filling the bottom of the entire connected fissure.The theoretical and effective storage capacities of free CO_(2)at normal temperature and pressure in the old goaf of the case were 9757 and 7477 t,respectively.The effective storage capacity of free CO_(2)at normal temperature and pressure in the old goaf after all minefield mined was 193404 t.The research can provide some reference for the coal mining industry to help the goal of“carbon peaking and carbon neutrality”.
基金the Funds of the State Key Development Program for Basic Research of China (Nos. 2013CB227900, 2010CB226800)the National Natural Science Foundation of China (Nos. 51108161, 51374201)+2 种基金the Open Laboratory Foundation for Deep Mine Construction of Henan Province of China (No. 2011KF-09)the Doctor Foundation in Henan Polytechnic University of China (No. Q2013-065)the Key Program for Science and Technology Research of Henan Province of China (Nos. 14A560002, 14B560021).
文摘Additional displacement of the building foundations over old goaf are prone to happen under the addi- tional loads induced by new buildings, weakening-rock mass by mining and seismic actions, which will cause serious damage to the buildings. In order to analyze the safety of the building foundations safety over the old goaf. the structure characteristics of the strata over the old goaf was investigated and the instability conditions of overhanging rocks upon old goaf were also analyzed in this paper. The results indicate that the stability of overhanging rocks is remarkably decreased by the interactions of mining fractures, earthquake force and building load, in addition, the settlement of the foundations over old goal is increased by the instability of overhanging rocks. According to the location of a new power plant in Yima Mine and its ambient conditions, we defined the influence scope of old goal via resistivity tomography. Based on the seismic parameters of the construction site, a numerical FLAC3d model of the building foundation under the seismic actions and building load was developed. The numerical results are obtained as follows: the foundation of the main power house meets the requirement of 6° seismic fortification intensity: however, under 7° seismic fortification intensity, the maximum differential settlement of foundation between the neighboring pillars is close to the maximum allowable value, while the seismic fortification intensity reaches 8°, but the safety requirements will not be satisfied.