期刊文献+
共找到5,827篇文章
< 1 2 250 >
每页显示 20 50 100
Using deep neural networks coupled with principal component analysis for ore production forecasting at open-pit mines
1
作者 Chengkai Fan Na Zhang +1 位作者 Bei Jiang Wei Victor Liu 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2024年第3期727-740,共14页
Ore production is usually affected by multiple influencing inputs at open-pit mines.Nevertheless,the complex nonlinear relationships between these inputs and ore production remain unclear.This becomes even more challe... Ore production is usually affected by multiple influencing inputs at open-pit mines.Nevertheless,the complex nonlinear relationships between these inputs and ore production remain unclear.This becomes even more challenging when training data(e.g.truck haulage information and weather conditions)are massive.In machine learning(ML)algorithms,deep neural network(DNN)is a superior method for processing nonlinear and massive data by adjusting the amount of neurons and hidden layers.This study adopted DNN to forecast ore production using truck haulage information and weather conditions at open-pit mines as training data.Before the prediction models were built,principal component analysis(PCA)was employed to reduce the data dimensionality and eliminate the multicollinearity among highly correlated input variables.To verify the superiority of DNN,three ANNs containing only one hidden layer and six traditional ML models were established as benchmark models.The DNN model with multiple hidden layers performed better than the ANN models with a single hidden layer.The DNN model outperformed the extensively applied benchmark models in predicting ore production.This can provide engineers and researchers with an accurate method to forecast ore production,which helps make sound budgetary decisions and mine planning at open-pit mines. 展开更多
关键词 Oil sands production open-pit mining Deep learning Principal component analysis(PCA) Artificial neural network Mining engineering
下载PDF
Study on the Application of Real-Time Drone Monitoring in Ordos Open-Pit Coal Mine
2
作者 Junyi Wu Weizheng Wang Xuesong Ni 《Open Journal of Applied Sciences》 CAS 2023年第4期483-495,共13页
In the process of intelligent mine construction in open-pit mine, in order to improve the safety monitoring ability of mine transportation system, solve the problems of large human interference and blind Angle detecti... In the process of intelligent mine construction in open-pit mine, in order to improve the safety monitoring ability of mine transportation system, solve the problems of large human interference and blind Angle detection by existing conventional monitoring methods, this paper establishes an open-pit mine monitoring data set, and proposes a real-time intelligent monitoring model based on UAV. The reasoning component with strong computing power and low power consumption is selected, and the lightweight object detection model is selected for the experiment. A quantitative standard of dynamic energy consumption detection by evaluation algorithm is proposed. Through experimental comparison, it is found that YOLOv4-tiny has the highest comprehensive grade in detection accuracy, speed, energy consumption and other aspects, which is suitable for application in the above model. 展开更多
关键词 open-pit Mine Safety Monitoring UAV Object Detection
下载PDF
Application of open-pit and underground mining technology for residual coal of end slopes 被引量:9
3
作者 CHE, Zhaoxue YANG, Hong 《Mining Science and Technology》 EI CAS 2010年第2期266-270,共5页
Given the conditions of residual coal from the boundary of a flat dipping open-pit mine,which uses strip areas mining and inner dumping with slope-covering,we propose an open-pit and underground integrated mining tech... Given the conditions of residual coal from the boundary of a flat dipping open-pit mine,which uses strip areas mining and inner dumping with slope-covering,we propose an open-pit and underground integrated mining technology for residual coal of end slopes.In the proposal a conveyance road and ventilation conveyance near the slope are built,corresponding to the pit mining area and the surface coal mine dump,as well as an interval haulage tunnel and air-inlet tunnel.The outcome shows that such mining method may reduce the effect to slope stability from underground mining,it does not affect the dumping advance and has a high recovery rate of residual coal resources.The working face is timbered by single hydraulic props,transported by a scraper conveyor and supported by coal walls.This method of mining is one of layered top coal caving,with high resource recovery,low production cost where positive economic benefit can be realized. 展开更多
关键词 integrated open-pit and underground mining end-slope resource recovery economic benefit surface coal mine
下载PDF
Effect of digital elevation models on monitoring slope displacements in open-pit mine by differential interferometry synthetic aperture radar 被引量:4
4
作者 I Nyoman Sudi Parwata Shinichiro Nakashima +1 位作者 Norikazu Shimizu Takahiro Osawa 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2020年第5期1001-1013,共13页
Displacement monitoring in open-pit mines is one of the important tasks for safe management of mining processes.Differential interferometric synthetic aperture radar(DInSAR),mounted on an artificial satellite,has the ... Displacement monitoring in open-pit mines is one of the important tasks for safe management of mining processes.Differential interferometric synthetic aperture radar(DInSAR),mounted on an artificial satellite,has the potential to be a cost-effective method for monitoring surface displacements over extensive areas,such as open-pit mines.DInSAR requires the ground surface elevation data in the process of its analysis as a digital elevation model(DEM).However,since the topography of the ground surface in open-pit mines changes largely due to excavations,measurement errors can occur due to insufficient information on the elevation of mining areas.In this paper,effect of different elevation models on the accuracy of the displacement monitoring results by DInSAR is investigated at a limestone quarry.In addition,validity of the DInSAR results using an appropriate DEM is examined by comparing them with the results obtained by global positioning system(GPS)monitoring conducted for three years at the same limestone quarry.It is found that the uncertainty of DEMs induces large errors in the displacement monitoring results if the baseline length of the satellites between the master and the slave data is longer than a few hundred meters.Comparing the monitoring results of DInSAR and GPS,the root mean square error(RMSE)of the discrepancy between the two sets of results is less than 10 mm if an appropriate DEM,considering the excavation processes,is used.It is proven that DInSAR can be applied for monitoring the displacements of mine slopes with centimeter-level accuracy. 展开更多
关键词 open-pit mine Slope monitoring Digital elevation model(DEM) Interferometric synthetic aperture radar (InSAR) Differential interferometric synthetic aperture radar(DInSAR)
下载PDF
Parameter inversion and location determination of evolutionary weak layer for open-pit mine slope 被引量:3
5
作者 Zhao Hongze Wang Dongyu +1 位作者 Ma Ming Zheng Kaihui 《International Journal of Coal Science & Technology》 EI CAS 2020年第4期714-724,共11页
In light of the complex and dynamic mechanical properties of evolving weak strata in open-pit mines,and the consequent difficulty of determining their mechanical parameters,this study uses the ultimate balance theory,... In light of the complex and dynamic mechanical properties of evolving weak strata in open-pit mines,and the consequent difficulty of determining their mechanical parameters,this study uses the ultimate balance theory,along with the back analysis method combined with monitoring data on field displacement,to carry out parameter inversion using the FLAC3D numerical simulation software.The edge slope of a working pit of the Weijiamao open-pit mine was used as research object to this end.As the results obtained by the constitutive model were consistent with the field monitoring data,the evolving weak strata in the slope and the position of the landslide in the mine could be obtained.The landslide was directed northeast.The mechanism of the edge slope of the working pit was identified as unloading shear failure,and the feasibility of the method of parameter inversion was verified.The internal friction angle φand cohesion C of evolving weak strata in the slope of the open-pit mine were also obtained,where this compensated for the deficiency of laboratory tests and enabled the transformation from qualitative to quantitative analysis.This can provide a reliable basis for the safe operation of open-pit mines. 展开更多
关键词 open-pit mine Evolution of weak layer Inverse analysis Monitoring data Numerical simulation
下载PDF
Thermal recovery process of a backfilled open-pit in permafrost area at the Gulian strip coal mine in Northeast China 被引量:1
6
作者 GAO Shu-hui HE Rui-xia +3 位作者 JIN Hui-jun HUANG Ya-dong ZHANG Jian-ming LUO Dong-liang 《Journal of Mountain Science》 SCIE CSCD 2017年第11期2212-2229,共18页
Timely and proper backfilling of open-pits in strip coal-mines has been an effective measurement for the recovery of the hydrothermal regimes and ecological environment in permafrost regions. In this study, numerical ... Timely and proper backfilling of open-pits in strip coal-mines has been an effective measurement for the recovery of the hydrothermal regimes and ecological environment in permafrost regions. In this study, numerical simulations and statistical regressions were applied for analyzing the recovery processes of the backfill and its major influencing factors for the thermal equilibrium in recently backfilled open pits at the Gulian strip coalmine in Mo'he, Northeast China. Results show that the thermal recovery time of backfilled areas is positively correlated to the backfill depth(BD) of the soils, the backfilled soil temperature(BST), and the mean annual ground surface temperature(MAGST); meanwhile, climate warming can impact on thermal regimes of the backfill area. The impact of climate warming on ground temperature of the backfill will show up significantly in about 50 years afterbackfilling(BD at 10.0 and 20.0 m, BST at 20.0°C) under the climate warming scenario(CWS) of 0.025°C·year ^(-1). Grey-relation analyses show that the sensitivity of the backfill recovery time declines in the order of the BD, BST and MAGST. On the basis of the abovementioned studies, the layer-by-layer backfilling in cold seasons is advised for more effective and more rapid recovery of thermal regimes of the backfilled open-pits in cold regions. 展开更多
关键词 Coal-mine open-pit BACKFILL Numericalsimulation THERMAL recovery process SENSITIVITYANALYSIS Gulian STRIP coal mine
下载PDF
Stability analysis of the sliding process of the west slope in Buzhaoba Open-Pit Mine 被引量:1
7
作者 Ning Fang Ji Changsheng Garmondyu E.Crusoe Jr. 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第5期869-875,共7页
To study the stability of the west slope in Buzhaoba Open-Pit Mine and determine the aging stability coefficient during slide mass development, the deformation band of the west slope and the slide mass structure of th... To study the stability of the west slope in Buzhaoba Open-Pit Mine and determine the aging stability coefficient during slide mass development, the deformation band of the west slope and the slide mass structure of the 34,600 profile are obtained on the basis of hydrology, geology, and monitoring data.The residual thrust method is utilized to calculate the stability coefficients, which are 1.225 and 1.00 under sound and transfixion conditions, respectively. According to the rock damage and fragmentation and the principle of mechanical parameter degradation, the mechanical models of the slide mass development of the hard and soft rock slopes are established. An integrated model for calculating the slope stability coefficient is built considering water, vibration, and other external factors that pertain to the structural plane damage mechanism and the generating mechanism of the sliding mass. The change curve of the stability coefficient in the slide mass development is obtained from the relevant analyses,and afterwards, the stability control measures are proposed. The analysis results indicate that in the cracking stage of the hard rock, the slope stability coefficient decreases linearly with the increase in the length Lbof the hard rock crack zone. The linear slope is positively correlated to rock cohesion c. In the transfixion stage of the soft rock, the decrease speed of the stability coefficient is positively correlated to the residual strength of the soft rock. When the slope is stable, the stability coefficient is in a quadratic-linear relationship with the decreased height Dh of the side slope and in a linear relationship with anchoring force P. 展开更多
关键词 open-pit mine Side slope Sliding process Aging stability Crack zone
下载PDF
Study on the Law of the Movement and Damage to Slope with the Combination of Underground Mining and Open-Pit Mining 被引量:1
8
作者 Gaofeng Ren Xingkui Fang 《Engineering(科研)》 2010年第3期201-204,共4页
Under circumstances in which both underground mining and open-pit mining are employed, the mining effects of two approaches will be superposed and the mining slope will receive several induced stress fields, which mak... Under circumstances in which both underground mining and open-pit mining are employed, the mining effects of two approaches will be superposed and the mining slope will receive several induced stress fields, which makes the sliding mechanism and deformation law of slope rock mass more complicated. This paper, targeting at the east slope of Antaibao Mine with the joint employment of underground mining and open-pit mining, aims to study the moving law of the slope rock mass and the damage mechanism to the overburden of the goaf by numerical simulation. It is supposed that models of possible damage to the slope could be explored for guidance to safety-production of the mine. 展开更多
关键词 COMBINATION of UNDERGROUND and open-pit MINING MINING DAMAGE Deformation Mechanism Numerical Simulation
下载PDF
Easy proft maximization method for open-pit mining
9
作者 C.Dinis da Gama 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2013年第5期350-353,共4页
A methodology applicable at any phase of a surface mining project for evaluating its current technical and economic feasibility is presented.It requires the typically available quantitative data on the ore-body,with i... A methodology applicable at any phase of a surface mining project for evaluating its current technical and economic feasibility is presented.It requires the typically available quantitative data on the ore-body,with its three-dimensional block model developed upon accurate interpolations.Thus it allows estimations of exploitable reserves in function of various cut-off grades,such as the average grade of mineable ore,the tonnages of ore and waste rock,stripping ratios and proft estimates for different production levels.If cost evaluations of essential mine operations are available(such as ore mining,waste removal,ore concentration,transportation,indirect project costs and expected concentrate selling prices),the methodology will provide clear indications on the economic feasibility of mining,including the best available options at any moment.Simple expressions are developed on the basis of a proft mathematical function and an application example is presented with data available from an existing iron ore deposit. 展开更多
关键词 open-pit Proft MAXIMIZATION ORE GRADE STRIPPING ratio Economic FEASIBILITY
下载PDF
Approach to monitoring, data processing and regularity on landslip in open-pits
10
作者 MA Zhen-li, LI Zheng-zhong, XU Xin-jun (Liaoning Technical University, Fuxin 123000, China) 《中国有色金属学会会刊:英文版》 CSCD 2005年第S1期132-135,共4页
A new method of landslip monitoring in open-pit is presented, in which the monitoring data processing and a variety of deformation curvilinear drawings are carried out by microcomputer system, based on the practice in... A new method of landslip monitoring in open-pit is presented, in which the monitoring data processing and a variety of deformation curvilinear drawings are carried out by microcomputer system, based on the practice in Haizhou Open-Mine for many years. Meanwhile, the general regularity on landslip in open-pit is acquired. 展开更多
关键词 open-pit landslip OBSERVATION LINE MONITORING data PROCESSING landslip PREDICTION
下载PDF
Spatiotemporal model of open-pit based on 3-D deposit model
11
作者 XIA Chun-lin1, ZHOU Hui1, LI Qing-yuan2, MA Zhen-li3 1. School of Geomatics, Liaoning Technical University, Fuxin 123000, China 2. State Key Laboratory for GIS Engineering, Chinese Academy of Surveying and Mapping, Beijing 100830, China 3. Yinchuan College, China University of Mining and Technology, Yinchuan 750011, China 《中国有色金属学会会刊:英文版》 CSCD 2011年第S3期616-620,共5页
A new method was put forward to make up the three-dimensional deposit model, and the spatiotemporal models of open-pit with temporal dynamics were also studied combined with the corrected models of multilevel ground s... A new method was put forward to make up the three-dimensional deposit model, and the spatiotemporal models of open-pit with temporal dynamics were also studied combined with the corrected models of multilevel ground states so as to bring the three-dimensional open-pit model at different time and its model serial formed from the evolvement into the management of temporal dimension in order to realize the spatial three-dimension and temporal dynamic for the mining management in open-pits,which makes this model easy to query and analyze 3-D information, also help surface mining replaying and stope evolution forecasting. Finally, the time-spatial model was established to show the dynamic mining on some open-pit under the windows XP and VC++ environment. 展开更多
关键词 3D MODEL of DEPOSIT three-dimensional MODEL MIXED MODEL TEMPORAL MODEL open-pit
下载PDF
The Influence of Earthquakes on Open-Pit Slope Stability
12
作者 Sergei Vadimovich Tsirel Boris Yurievich Zuev Anton Anatolevich Pavlovich 《International Journal of Geosciences》 2012年第4期799-808,共10页
Estimation of stability of natural slopes, embankments, dams and open-pit slopes during earthquakes are complex and non-linear problems, therefore physical modeling is used for decision of it. As a result of physical ... Estimation of stability of natural slopes, embankments, dams and open-pit slopes during earthquakes are complex and non-linear problems, therefore physical modeling is used for decision of it. As a result of physical modeling the pattern of seismic vibrations impact based on the movement process of probable collapse prism delineated by the most stressed plane of sliding has been established. Particular recommendations on the basis of safety factors selection in seismoactive zones are given. 展开更多
关键词 EARTHQUAKES open-pit SLOPE STABILITY SAFETY FACTOR Pseudostatic Approach
下载PDF
High precision slope deformation monitoring model based on the GPS/Pseudolites technology in open-pit mine 被引量:25
13
作者 WANG Jianpeng, GAO Jingxiang, LIU Chao, WANG Jian School of Environment and Spatial Informatics, China University of Mining & Technology, Xuzhou 221008, China 《Mining Science and Technology》 EI CAS 2010年第1期126-131,137,共7页
As the number and geometric intensity of visual satellites are susceptible to large slopes in open-pit mines, we propose integration of GPS/Pseudolites (PLs) positioning technology which can increase the number of vis... As the number and geometric intensity of visual satellites are susceptible to large slopes in open-pit mines, we propose integration of GPS/Pseudolites (PLs) positioning technology which can increase the number of visible satellites, strengthen the geometric intensity of satellites and provide a precision solution for slope deformation monitoring. However, the un-modeled systematic errors are still the main limiting factors for high precision baseline solution. In order to eliminate the un-modeled systematic error, the Empirical Mode Decomposition (EMD) theory is employed. The multi-scale decomposition and reconstruction architecture are defined here on the basis of the EMD theory and the systematic error mitigation model is demonstrated as well. A standard of the scale selection for the systematic error elimination is given in terms of the mean of the accumulated standardized modes. Thereafter, the scheme of the GPS/PLs baseline solution based on the EMD is suggested. The simulation and experiment results show that the precision factors (DOP) are reduced greatly when PLs is located suitably. The proposed scheme dramatically improves the reliability of ambiguity resolution and the precision of baseline vector after systematic error being eliminated, and provides an effective model for high precision slope deformation monitoring in open-pit mine. 展开更多
关键词 模型精度 变形监测 伪卫星 露天矿 GPS 高边坡 矿山技术 标准化模式
下载PDF
Dynamic phase-mining optimization in open-pit metal mines 被引量:8
14
作者 顾晓薇 王青 葛舒 《Transactions of Nonferrous Metals Society of China》 SCIE EI CAS CSCD 2010年第10期1974-1980,共7页
Three important aspects of phase-mining must be optimized:the number of phases,the geometry and location of each phase-pit(including the ultimate pit),and the ore and waste quantities to be mined in each phase.A model... Three important aspects of phase-mining must be optimized:the number of phases,the geometry and location of each phase-pit(including the ultimate pit),and the ore and waste quantities to be mined in each phase.A model is presented,in which a sequence of geologically optimum pits is first generated and then dynamically evaluated to simultaneously optimize the above three aspects,with the objective of maximizing the overall net present value.In this model,the dynamic nature of the problem is fully taken into account with respect to both time and space,and is robust in accommodating different pit wall slopes and different bench heights.The model is applied to a large deposit consisting of 2044 224 blocks and proved to be both efficient and practical. 展开更多
关键词 金属矿山 优化 开采 露天 相位 动态生成 动态性质 模型
下载PDF
Availability-based simulation and optimization modeling framework for open-pit mine truck allocation under dynamic constraints 被引量:8
15
作者 Mena Rodrigo Zio Enrico +1 位作者 Kristjanpoller Fredy Arata Adolfo 《International Journal of Mining Science and Technology》 SCIE EI 2013年第1期113-119,共7页
We present a novel system productivity simulation and optimization modeling framework in which equipment availability is a variable in the expected productivity function of the system. The framework is used for alloca... We present a novel system productivity simulation and optimization modeling framework in which equipment availability is a variable in the expected productivity function of the system. The framework is used for allocating trucks by route according to their operating performances in a truck-shovel system of an open-pit mine, so as to maximize the overall productivity of the fleet. We implement the framework in an originally designed and specifically developed simulator-optimizer software tool. We make an application on a real open-pit mine case study taking into account the stochasticity of the equipment behavior and environment. The total system production values obtained with and without considering the equipment reliability, availability and maintainability (RAM) characteristics are compared. We show that by taking into account the truck and shovel RAM aspects, we can maximize the total production of the system and obtain specific information on the production availability and productivity of its components. 展开更多
关键词 模拟 优化 可靠性 生产率 开坑 卡车分配
下载PDF
Monitoring and Assessing Method for Blasting Vibration on Open-pit Slope in Hainan Iron Mine 被引量:3
16
作者 SONG Guang ming 1,SHI Xiu zhi 1,ZHOU Zhi guo 1,CHEN Shou ru 1,XIAO Qing hua 2 (1 College of Resources, Environment and Civil Engineering, Central South University of Technology, Changsha 410083, China 2 Production and Technology Departmen 《Journal of Central South University》 SCIE EI CAS 2000年第2期72-74,共3页
A type of velocity sensor CD 1, an auto recording instrument on blasting vibration YBJ 1 and a random signal and vibration analysis system (CRAS) were used to monitor the particle vibration induced by blasting at open... A type of velocity sensor CD 1, an auto recording instrument on blasting vibration YBJ 1 and a random signal and vibration analysis system (CRAS) were used to monitor the particle vibration induced by blasting at open pit slope in Hainan Iron Mine. The attenuating rules of blasting ground vibration on slope were developed. By means of the analysis and calculation of the blasting vibration data at open pit slope and the vertical particle vibration velocity assessment method based on the concept of vibration strength, the empirical attenuating equations which can be used for predicting and estimating the damage of slope were derived. 展开更多
关键词 BLASTING vibration open PIT SLOPE MONITORING ASSESSING
下载PDF
Development and characterization of formulation of dust-suppressant used for stope road in open-pit mines 被引量:5
17
作者 Cui-Feng DU Li LI 《Journal of Coal Science & Engineering(China)》 2013年第2期219-225,共7页
关键词 抑制剂 露天矿 表征 灰尘 公路 采场 最佳配方 表面活性剂
下载PDF
Sensitivity analysis for parameters of a monitoring system for steep slopes of open-pit mines 被引量:3
18
作者 HAN Xue HE Man-chao ZHANG Bi 《Mining Science and Technology》 EI CAS 2009年第4期441-445,共5页
Monitoring the stability of steep slopes of open-pit mines is a major issue relating to production safety in mines.In order to determine the technical parameters of a new type of supervising system applied in monitori... Monitoring the stability of steep slopes of open-pit mines is a major issue relating to production safety in mines.In order to determine the technical parameters of a new type of supervising system applied in monitoring steep slopes of open-pit mines,the MSARMA method was used to establish analytical models for the monitoring system,given various parameter settings based on the description of mechanical monitoring principles.We used this sensitivity analysis to conclude that the setting of the most sensitive location of a mechanical monitoring system should be within a range of 1/5~1/2 of the lower part in a vertical direction of steep slopes,with a rational and feasible range of the dip angle setting between 0°~20°.Given the analytical results of our on-site experiments,we have shown that the parameters determined reflect the stability of steep slopes accurately and effectively.These conclusions provide a basis for the application of a new type of steep slope stability monitoring technology in open-pit mines. 展开更多
关键词 参数监测系统 露天矿 灵敏度分析 陡坡 敏感性分析 技术参数 稳定性 安全生产
下载PDF
Cut slope reinforcement technique in open-pit mines 被引量:3
19
作者 YongtaoGao JianboSun +1 位作者 ShunchuanWu AibingJin 《Journal of University of Science and Technology Beijing》 CSCD 2004年第4期289-292,共4页
The design and practice in supporting the cut slope of an open-pit mine were introduced, in which the high pressure grouting method was used in reinforcing the weak formation in the slopes. Based on a detailed geologi... The design and practice in supporting the cut slope of an open-pit mine were introduced, in which the high pressure grouting method was used in reinforcing the weak formation in the slopes. Based on a detailed geological survey of the slope, a theoretical analysis was carried out, and the design parameters were proposed, where the Tresca or Mohr-Coulomb yield criteria was employed. A patent technology, named 'Technology of high pressure and multiple grouting in different levels within a single hole', was employed in the construction. Anchor bars were also installed as grouting proceeds. This method combines anchoring and grouting comprehensively and was found successful in practice. 展开更多
关键词 采矿工程 开坑边坡 弱构造 高压灌浆 岩石沉陷
下载PDF
Circle geometric constraint model for open-pit mine ore-matching and its applications 被引量:2
20
作者 黄俊歆 王李管 +3 位作者 熊书敏 徐少游 谭正华 王海桥 《Journal of Central South University》 SCIE EI CAS 2012年第9期2598-2603,共6页
The circle geometric constraint model(CGCM) was put forward for resolving the open-pit mine ore-matching problems(OMOMP).By adopting the approaches of graph theory,block model of blasted piles was abstracted into a se... The circle geometric constraint model(CGCM) was put forward for resolving the open-pit mine ore-matching problems(OMOMP).By adopting the approaches of graph theory,block model of blasted piles was abstracted into a set of nodes and directed edges,which were connected together with other nodes in the range of circle constraints,to describe the mining sequence.Also,the constructing method of CGCM was introduced in detail.The algorithm of CGCM has been realized in the DIMINE system,and applied to a short-term(5d) program calculation for ore-matching of a cement limestone mine in Hebei Province,China.The applications show that CGCM can well describe the mining sequence of ore blocks and its mining geometric constraints in the process of mining blasted piles.This model,which is applicable for resolving OMOMP under complicated geometric constraints with accurate results,provides effective ways to solve the problems of open-pit ore-matching. 展开更多
关键词 几何约束 约束模型 露天矿 匹配 应用 海气耦合模式 节点连接 模型抽象
下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部