The control method of rubber tyre gantry (RTG) spreader in Qingdao Port Container Terminal is logic board control,which has many shortcomings such as expensive spare parts and high faults.This paper designs a new co...The control method of rubber tyre gantry (RTG) spreader in Qingdao Port Container Terminal is logic board control,which has many shortcomings such as expensive spare parts and high faults.This paper designs a new control system using programmable logic controller (PLC) centralized control to replace the original logic board control.The new system mainly contains complete ELME spreader control scheme design,hardware selection and PLC control program development.Its field application shows that the system has characteristics of high efficiency,low running cost,easy maintenance.展开更多
This paper proposes to adopt SCADA and PLC technology for the improvement of the performance of real time signaling&train control systems in metro railways.The main concern of this paper is to minimize the failure...This paper proposes to adopt SCADA and PLC technology for the improvement of the performance of real time signaling&train control systems in metro railways.The main concern of this paper is to minimize the failure in automated metro railways system operator and integrate the information coming from Operational Control Centre(OCC),traction SCADA system,traction power control,and power supply system.This work presents a simulated prototype of an automated metro train system operator that uses PLC and SCADA for the real time monitoring and control of the metro railway systems.Here,SCADA is used for the visualization of an automated process operation and then the whole opera-tion is regulated with the help of PLC.The PLC used in this process is OMRON(NX1P2-9024DT1)and OMRON’s Sysmac studio programming software is used for developing the ladder logic of PLC.The metro railways system has deployed infrastructure based on SCADA from the power supply system,and each station’s traction power control is connected to the OCC remotely which commands all of the stations and has the highest command priority.An alarm is triggered in the event of an emergency or system congestion.This proposed system overcomes the drawbacks of the current centralized automatic train control(CATC)system.This system provides prominent benefits like augmenting services which may enhance a network’s full load capacity and networkflexibility,which help in easy modification in the existing program at any time.展开更多
基金Shandong University of Science and Technology Spring Buds Program(No.2010AZZ170)
文摘The control method of rubber tyre gantry (RTG) spreader in Qingdao Port Container Terminal is logic board control,which has many shortcomings such as expensive spare parts and high faults.This paper designs a new control system using programmable logic controller (PLC) centralized control to replace the original logic board control.The new system mainly contains complete ELME spreader control scheme design,hardware selection and PLC control program development.Its field application shows that the system has characteristics of high efficiency,low running cost,easy maintenance.
文摘This paper proposes to adopt SCADA and PLC technology for the improvement of the performance of real time signaling&train control systems in metro railways.The main concern of this paper is to minimize the failure in automated metro railways system operator and integrate the information coming from Operational Control Centre(OCC),traction SCADA system,traction power control,and power supply system.This work presents a simulated prototype of an automated metro train system operator that uses PLC and SCADA for the real time monitoring and control of the metro railway systems.Here,SCADA is used for the visualization of an automated process operation and then the whole opera-tion is regulated with the help of PLC.The PLC used in this process is OMRON(NX1P2-9024DT1)and OMRON’s Sysmac studio programming software is used for developing the ladder logic of PLC.The metro railways system has deployed infrastructure based on SCADA from the power supply system,and each station’s traction power control is connected to the OCC remotely which commands all of the stations and has the highest command priority.An alarm is triggered in the event of an emergency or system congestion.This proposed system overcomes the drawbacks of the current centralized automatic train control(CATC)system.This system provides prominent benefits like augmenting services which may enhance a network’s full load capacity and networkflexibility,which help in easy modification in the existing program at any time.