Fuzzy cognitive maps (FCM) is a well-established artificial intelligence technique, which can be effectively applied in the domains of performance measurement, decision making and other management science. FCM can b...Fuzzy cognitive maps (FCM) is a well-established artificial intelligence technique, which can be effectively applied in the domains of performance measurement, decision making and other management science. FCM can be a useful tool in a group decision-making environment by using scientifically integrated expert knowledge. The theories of FCM and balance scorecard (BSC) both emphasize cause-and-effect relationships among indicators in a complex system, but few reports have been published addressing the combined application of these two techniques. In this paper we propose a FCM simulation model for the sample performance measurement system of Intemet-based supply chain, which is constructed by BSC theory. We gave examples to explain how FCM can be adapted to execute the causal mechanism of BSC, and also how FCM can support group decision-making and forecasting in performance measurement.展开更多
Knowledge has become the most important strategic resource of firms, and the competition among firms is more based on knowledge than before. To deal with this challenge, some firms are trying to develop knowledge stra...Knowledge has become the most important strategic resource of firms, and the competition among firms is more based on knowledge than before. To deal with this challenge, some firms are trying to develop knowledge strategies to direct their knowledge management activities, but current strategic performance measurement systems can't evaluate the performance of knowledge strategies appropriately. This article develops a performance measurement system for knowledge strategies based on Balanced Scorecard, and simulates the system with an improved Data Envelopment Analysis (DEA) model.展开更多
State departments of transportation’s (DOTs) decisions to invest resources to expand or implement intelligent transportation systems (ITS) programs or even retire existing infrastructure need to be based on performan...State departments of transportation’s (DOTs) decisions to invest resources to expand or implement intelligent transportation systems (ITS) programs or even retire existing infrastructure need to be based on performance evaluations. Nonetheless, an apparent gap exists between the need for ITS performance measurements and the actual implementation. The evidence available points to challenges in the ITS performance measurement processes. This paper evaluated the state of practice of performance measurement for ITS across the US and provided insights. A comprehensive literature review assessed the use of performance measures by DOTs for monitoring implemented ITS programs. Based on the gaps identified through the literature review, a nationwide qualitative survey was used to gather insights from key stakeholders on the subject matter and presented in this paper. From the data gathered, performance measurement of ITS is fairly integrated into ITS programs by DOTs, with most agencies considering the process beneficial. There, however, exist reasons that prevent agencies from measuring ITS performance to greater detail and quality. These include lack of data, fragmented or incomparable data formats, the complexity of the endeavor, lack of data scientists, and difficulty assigning responsibilities when inter-agency collaboration is required. Additionally, DOTs do not benchmark or compare their ITS performance with others for reasons that include lack of data, lack of guidance or best practices, and incomparable data formats. This paper is relevant as it provides insights expected to guide DOTs and other agencies in developing or reevaluating their ITS performance measurement processes.展开更多
There are many different production situations that can be employed to meet demand. In the engineer-to- order (ETO) production situation, products are manufac- tured to meet specific customer needs by unique enginee...There are many different production situations that can be employed to meet demand. In the engineer-to- order (ETO) production situation, products are manufac- tured to meet specific customer needs by unique engineering or significant customization. In such an environment, failing to supply the required materials in the right quantities and at the right time increases the risk of breaching due date agreements and thereby losing customer satisfaction. As such, materials management is one of the most important and critical processes within production planning and control in ETO. To bring attention and improvement to this area, ETO companies may benefit from a performance measurement system (PMS) that systematically monitors how well mate- rials management is carried out. The design of a company's PMS varies with its production situation. Within the large body of literature on performance management and mea- surement, limited literature specifically addressing perfor- mance measurement in ETO has been identified. After being approached by a Norwegian ETO company requesting a PMS for materials management, the authors therefore set out to design the PMS from scratch, using literature on ETO, materials management and performance management and measurement as a starting point. The paper presents the proposed PMS. It provides a basis for further studies on the topic, and could be used by managers in ETO companies to assess and improve their materials management practice.展开更多
Workflow logs that record the execution of business processes offer very valuable data resource for real-time enterprise performance measurement. In this paper, a novel scheme that uses the technology of data warehous...Workflow logs that record the execution of business processes offer very valuable data resource for real-time enterprise performance measurement. In this paper, a novel scheme that uses the technology of data warehouse and OLAP to explore workflow logs and create complex analysis reports for enterprise performance measurement is proposed. Three key points of this scheme are studied: 1) the measure set; 2) the open and flexible architecture for workflow logs analysis system; 3) the data models in WFMS and data warehouse. A case study that shows the validity of the scheme is also provided.展开更多
Emerging connected vehicle (CV) data sets have recently become commercially available, enabling analysts to develop a variety of powerful performance measures without deploying any field infrastructure. This paper pre...Emerging connected vehicle (CV) data sets have recently become commercially available, enabling analysts to develop a variety of powerful performance measures without deploying any field infrastructure. This paper presents several tools using CV data to evaluate traffic progression quality along a signalized corridor. These include both performance measures for high-level analysis as well as visualizations to examine details of the coordinated operation. With the use of CV data, it is possible to assess not only the movement of traffic on the corridor but also to consider its origin-destination (O-D) path through the corridor. Results for the real-world operation of an eight-intersection signalized arterial are presented. A series of high-level performance measures are used to evaluate overall performance by time of day, with differing results by metric. Next, the details of the operation are examined with the use of two visualization tools: a cyclic time-space diagram (TSD) and an empirical platoon progression diagram (PPD). Comparing flow visualizations developed with different included O-D paths reveals several features, such as the presence of secondary and tertiary platoons on certain sections that cannot be seen when only end-to-end journeys are included. In addition, speed heat maps are generated, providing both speed performance along the corridor and locations and the extent of the queue. The proposed visualization tools portray the corridor’s performance holistically instead of combining individual signal performance metrics. The techniques exhibited in this study are compelling for identifying locations where engineering solutions such as access management or timing plan change are required. The recent progress in infrastructure-free sensing technology has significantly increased the scope of CV data-based traffic management systems, enhancing the significance of this study. The study demonstrates the utility of CV trajectory data for obtaining high-level details of the corridor performance as well as drilling down into the minute specifics.展开更多
As a novel paradigm,semantic communication provides an effective solution for breaking through the future development dilemma of classical communication systems.However,it remains an unsolved problem of how to measure...As a novel paradigm,semantic communication provides an effective solution for breaking through the future development dilemma of classical communication systems.However,it remains an unsolved problem of how to measure the information transmission capability for a given semantic communication method and subsequently compare it with the classical communication method.In this paper,we first present a review of the semantic communication system,including its system model and the two typical coding and transmission methods for its implementations.To address the unsolved issue of the information transmission capability measure for semantic communication methods,we propose a new universal performance measure called Information Conductivity.We provide the definition and the physical significance to state its effectiveness in representing the information transmission capabilities of the semantic communication systems and present elaborations including its measure methods,degrees of freedom,and progressive analysis.Experimental results in image transmission scenarios validate its practical applicability.展开更多
Objective:Although evidence has already demonstrated that the performance of Health Deliv- ery System(HDS) varies widely across nations,relatively little is known about the factors that give rise to these variations a...Objective:Although evidence has already demonstrated that the performance of Health Deliv- ery System(HDS) varies widely across nations,relatively little is known about the factors that give rise to these variations and the key point to improve the performance besides adjusting system structure.By setup of HDS performance measurement system on the base of association of financial,social,and environmental characteristics,we construct system dynamic model of HDS to simulate the invention policies.Methods: Performance measures were collected from HDS in 31 regions of China and combined with secondary data sources.Multivariate,linear,nonlinear regression and factor analysis models were used to estimate associ- ations between system characteristics and the performance.Results:Performance varied significantly with the size,financial resources and organizational structure of HDS.Performance measurement system of health delivery system was developed to give the rank of all Chinese regions.Conclusion:Performance measurement system of HDS is the basic of HDS modeling by system dynamic.展开更多
Performance measurement(PM)generates useful data for process control,facilitates communication between different sectors,and helps to align efforts on the most important aspects of the business.Thus,PM plays a key rol...Performance measurement(PM)generates useful data for process control,facilitates communication between different sectors,and helps to align efforts on the most important aspects of the business.Thus,PM plays a key role in the management of projects and organizations.PM is also important in the implementation of lean production principles and methods,such as reducing the share of nonvalue-adding activities,increasing process transparency,building continuous improvement into the process,and benchmarking.Moreover,the adoption of the lean production philosophy requires changes in PM.Despite its importance,limited studies have been conducted on the use of PM systems for assessing the impact of lean production programs in construction projects.In addition,studies on how lean companies(or projects)use performance measurement and to what extent the indicators adopted reflect the result of actions that have been undertaken are limited.This study proposes a set of requirements in PM systems of construction projects from the perspective of lean production and a taxonomy of performance metrics for lean production systems.Five empirical studies have been carried out on construction companies from South America involved in the implementation of lean production systems.The scope of this investigation is limited to the construction projects as production systems rather than PM at the level of construction organizations.展开更多
Local arterials can be significantly impacted by diversions from adjacent work zones. These diversions often occur on unofficial detour routes due to guidance received on personal navigation devices. Often, these rout...Local arterials can be significantly impacted by diversions from adjacent work zones. These diversions often occur on unofficial detour routes due to guidance received on personal navigation devices. Often, these routes do not have sufficien<span style="font-family:Verdana;">t sensing or communication equipment to obtain infrastructure-based tra</span><span style="font-family:Verdana;">ffic signal performance measures, so other data sources are required to identify locations being significantly affected by diversions. This paper examines the network impact caused by the start of an 18-month closure of the I-65/70 interchange (North Split), which usually serves approximately 214,000 vehicles per day in Indianapolis, IN. In anticipation of some proportion of the public diverting from official detour routes to local streets, a connected vehicle monitoring program was established to provide daily performances measures for over 100 intersections in the area without the need for vehicle sensing equipment. This study reports on 13 of the most impacted signals on an alternative arterial to identify locations and time of day where operations are most degraded, so that decision makers have quantitative information to make informed adjustments to the system. Individual vehicle movements at the studied locations are analyzed to estimate changes in volume, split failures, downstream blockage, arrivals on green, and travel times. Over 130,000 trajectories were analyzed in an 11-week period. Weekly afternoon peak period volumes increased by approximately 455%, split failures increased 3%, downstream blockage increased 10%, arrivals on green decreased 16%, and travel time increase 74%. The analysis performed in this paper will serve as a framework for any agency that wants to assess traffic signal performance at hundreds of locations with little or no existing sensing or communication infrastructure to prioritize tactical retiming and/or longer-term infrastructure investments.</span>展开更多
Large diameter fans with low solidity are widely used in automotive application for engine cooling. Their designs with small chord length help reducing the torque on the electrical motor and providing a good aerodynam...Large diameter fans with low solidity are widely used in automotive application for engine cooling. Their designs with small chord length help reducing the torque on the electrical motor and providing a good aerodynamic compromise between several operating conditions, some of these being at high flow rate. Their global performances are measured according to the ISO standard DP 5801, which allows comparison of results from different facilities. However, some variations in global performances are observed when considering results from two different test rigs. On a fan selected for the purpose of this study, up to 6 % of efficiency is lost on the worst case. As efficiency is more than ever a key factor to select a component, some experimental and numerical investigations were conducted to analyze the fan behavior on each facility. Two sets of measurement and simulation are performed and compared. Geometries considered for the domain of computation include the test rig plenum, the torquemeter, the ground and a large domain for the atmospheric conditions. The exact fan geometry with tip clearance and under-hub ribs is also considered. Numerical results show a good agreement with experiment in both cases when convergence is reached and for low flow rate when computations are switched to unsteady mode. Comparisons show that simulations are able to capture the different fan behaviors depending on the confguration and those efficiency losses previously observed are correctly predicted. These results are further analyzed to perform some post-processing. Blade loading remains identical for both cases but disparities appear in the wake and its interaction with the surrounding. Tiny details that are often neglected during experiment and/or simulation appear to be the cause of slight variations. Position of the torquemeter and shape of the plenum are among the parameters that various and that have cumulative effects. Efficiency being a ration of pressure and torque, variations are rather important. Finally, these results are discussed in terms of rules for conception and a new geometry less sensible to loss of efficiency is proposed.展开更多
WiFi has become one of the most popular ways to access the Internet.However,in large-scale campus wireless networks,it is challenging for network administrators to provide optimized access quality without knowledge on...WiFi has become one of the most popular ways to access the Internet.However,in large-scale campus wireless networks,it is challenging for network administrators to provide optimized access quality without knowledge on fine-grained traffic characteristics and real network performance.In this paper,we implement PerfMon,a network performance measurement and diagnosis system,which integrates collected multi-source datasets and analysis methods.Based on PerfMon,we first conduct a comprehensive measurement on application-level traffic patterns and behaviors from multiple dimensions in the wireless network of T university(TWLAN),which is one of the largest campus wireless networks.Then we systematically study the application-level network performance.We observe that the application-level traffic behaviors and performance vary greatly across different locations and device types.The performance is far from satisfactory in some cases.To diagnose these problems,we distinguish locations and device types,and further locate the most crucial factors that affect the performance.The results of case studies show that the influential factors can effectively characterize performance changes and explain for performance degradation.展开更多
The short-range wireless communication technology has advanced considerably and provides the feasibility of train-train(T2T)communication link in the communication-based train control system.The introduction of the T2...The short-range wireless communication technology has advanced considerably and provides the feasibility of train-train(T2T)communication link in the communication-based train control system.The introduction of the T2T link would reduce the headway and improve operational efficiency.Formal methods are system design techniques that use rigorously specified mathematical models to ensure all behaviors work as expected.And it is exactly the functional safety verification needed.Therefore,to deal with the functional safety verification of the T2T link,an untimed colored petri net model is first constructed.Secondly,the verification process is performed.Conclusions can be drawn from the state space report and the computation tree logic queries.Lastly,the model is parameterized,and then data log files are obtained for further performance measurement.Results show that the proposed criteria are satisfied and there are no defects in the basic design requirements.The transmission delay has considered the reconnection,transmission errors and the interruption.The probability of the delay lower than 150 ms accounts for 98.106%,which meets the specification and the previous field test.展开更多
A novel thennoelectric generating and performance measuring system (TGPMS) was designed and fabricated. TGPMS can not only achieve the function of thennoelectric generation, but also measure the thennoelectric perfo...A novel thennoelectric generating and performance measuring system (TGPMS) was designed and fabricated. TGPMS can not only achieve the function of thennoelectric generation, but also measure the thennoelectric performance parameters of the bismuth-telluride-based thennoelectric device accurately. These thennoelectric performance parameters mainly include the dependence of the Seebeck coefficient of the thennoelectric device on the device's temperature in the low temperature range (about 40 ~ 190~C ), and the dependence of the power output and thermoelectric conversion efficiency on the temperature dif- ference or output load. With the optimum load, the optimal value of the power output is 3.39W when the temperature difference reaches 231.2~C, and the optimal value of the conversion efficiency is 3.22% when the temperature difference reaches 208.9~C. TGPMS provides an experimental foundation for the application of the thennoelectric generators in the space field.展开更多
International joint ventures (IJVs) have increasingly their role in business world and also in research field of international business. There have been a lot of studies related to determinant factors of IJV perform...International joint ventures (IJVs) have increasingly their role in business world and also in research field of international business. There have been a lot of studies related to determinant factors of IJV performance. However, there are very few studies focusing on the measurement of I Jr performance. Especially, researchers have ignored how foreign parent firms really choose their measures in the evaluation of their IJV performance. This research investigates determinant factors of performance measures of 1JVs. Determinant factors of IJV performance measures include motives for establishment, establishment mode, location of IJVs, distribution of ownership in IJVs, cultural background of parent firms, and trust between partners, IJV life stages, parent firms' international experience, and relatedness of the IJVs to their parents. Performance measures are divided into financial measures and non-financial measures. The paper shows how different determinant factors are expected to lead foreign parent firms preferring one kind of measure over the other.展开更多
This study develops a procedure to rank agencies based on their incident responses using roadway clearance times for crashes. This analysis is not intended to grade agencies but to assist in identifying agencies requi...This study develops a procedure to rank agencies based on their incident responses using roadway clearance times for crashes. This analysis is not intended to grade agencies but to assist in identifying agencies requiring more training or resources for incident management. Previous NCHRP reports discussed usage of different factors including incident severity, roadway characteristics, number of lanes involved and time of incident separately for estimating the performance. However, it does not tell us how to incorporate all the factors at the same time. Thus, this study aims to account for multiple factors to ensure fair comparisons. This study used 149,174 crashes from Iowa that occurred from 2018 to 2021. A Tobit regression model was used to find the effect of different variables on roadway clearance time. Variables that cannot be controlled directly by agencies such as crash severity, roadway type, weather conditions, lighting conditions, etc., were included in the analysis as it helps to reduce bias in the ranking procedure. Then clearance time of each crash is normalized into a base condition using the regression coefficients. The normalization makes the process more efficient as the effect of uncontrollable factors has already been mitigated. Finally, the agencies were ranked by their average normalized roadway clearance time. This ranking process allows agencies to track their performance of previous crashes, can be used in identifying low performing agencies that could use additional resources and training, and can be used to identify high performing agencies to recognize for their efforts and performance.展开更多
Balanced scorecard is a strategic information system and a performance measurement system. It integrates almost all the interests of stakeholders and mainly comprises four perspectives: management, operational, marke...Balanced scorecard is a strategic information system and a performance measurement system. It integrates almost all the interests of stakeholders and mainly comprises four perspectives: management, operational, marketing, and knowledge.展开更多
In 1997 the Michigan Department of Transportation (MDOT) established an ambitious set of condition targets for its pavements and bridges, and the Department received increased revenue from a 4-cent-per-gallon increase...In 1997 the Michigan Department of Transportation (MDOT) established an ambitious set of condition targets for its pavements and bridges, and the Department received increased revenue from a 4-cent-per-gallon increase in the state motor fuels tax to help meet its targets. However, over time, actual revenue was less than both what was initially estimated as needed to meet the targets and what was projected from the tax increase. Consequently, actual conditions were projected to fall short of the target levels, so the department issued bonds to address the shortfall through 2012. To support deliberations on future funding, in 2013 MDOT performed an analysis of historic conditions to determine what additional fuel tax revenues would have been required beginning in 1997 to: replace bond revenues used to fund pavement and bridge projects from 1997 to 2012;and enable MDOT to meet its condition targets. The analysis was performed using data on actual pavement and bridge funding and conditions;as well as predicted funding and conditions for different hypothetical increases in fuel taxes. The analysis concluded that, in addition to the actual increase of 4 cents per gallon, a fuel tax increase of another 10 cents per gallon would have been required in 1997 to replace bond revenue used for pavement and bridges and allow MDOT to meet its condition targets. The analysis results were used to help inform the discussion of Michigan’s target asset conditions and funding, and demonstrate application of MDOT’s pavement and bridge management systems for performing historic analyses.展开更多
Green supply chain is one of the trends of industry development. And performance measurement is the key to implementing the supply chain. So it is necessary to evaluate the environmental performance of supply chain .A...Green supply chain is one of the trends of industry development. And performance measurement is the key to implementing the supply chain. So it is necessary to evaluate the environmental performance of supply chain .According to the connotation of green supply chain and the standards of environmental management, this paper designs green performance measurement systems which is composed of four main factors such as waste emissions and exposure hazard, resource utilization, product recovery, and environmental reputation. And the authors delve deeply these factors so that it forms a two-level measurement system. Then the effect on the traditional performance measurement of supply chain is studied after taking greening to the supply chain leveL At last the authors apply the method of multi-level fuzzy judgment to the environmental performance measurement system. An example is given to show the judgment process.展开更多
Since the first Diverging Diamond Interchange (DDI) implementation in 2009, most of the performance studies developed for this type of interchange have been based on simulations and historical crash data, with a small...Since the first Diverging Diamond Interchange (DDI) implementation in 2009, most of the performance studies developed for this type of interchange have been based on simulations and historical crash data, with a small numbe<span style="font-family:Verdana;">r of studies using Automated Traffic Signal Performance Measures (ATS</span><span style="font-family:Verdana;">PM). Simulation models require considerable effort to collect volumes and to model actual controller operations. Safety studies based on historical crashes usually require from 3 to 5 years of data collection. ATSPMs rely on sensing equipment. This study describes the use of connected vehicle trajectory data to analyze the performance of a DDI located in the metropolitan area of Fort Wayne, IN. An extension of the Purdue Probe Diagram (PPD) is proposed to assess the levels of delay, progression, and saturation. Further, an additional PPD variation is presented that provides a convenient visualization to qualitatively understand progression patterns and to evaluate queue length for spillback in the critical interior crossover. Over 7000 trajectories and 130,000 GPS points were analyzed between the 7</span><sup><span style="font-family:Verdana;">th</span></sup><span style="font-family:Verdana;"> and the 11</span><sup><span style="font-family:Verdana;">th</span></sup><span style="font-family:Verdana;"> of June 2021 from 5:00 AM to 10:00 PM to estimate the DDI’s arrivals on green, level of service, split failures, and downstream blockage. Although this technique was demonstrated for weekdays, the ubiquity of connected vehicle data makes it very ea</span><span style="font-family:Verdana;">sy to adapt these techniques to analysis during special events, winter sto</span><span style="font-family:Verdana;">rms, and weekends. Furthermore, the methodologies presented in this paper can be applied by any agency wanting to assess the performance of any DDI in their jurisdiction.</span>展开更多
基金Funded by Chongqing Natural Science Foundation (No. CSTC2005BB2189) and Chongqing High Tech Projects Foundation (No. 8277)
文摘Fuzzy cognitive maps (FCM) is a well-established artificial intelligence technique, which can be effectively applied in the domains of performance measurement, decision making and other management science. FCM can be a useful tool in a group decision-making environment by using scientifically integrated expert knowledge. The theories of FCM and balance scorecard (BSC) both emphasize cause-and-effect relationships among indicators in a complex system, but few reports have been published addressing the combined application of these two techniques. In this paper we propose a FCM simulation model for the sample performance measurement system of Intemet-based supply chain, which is constructed by BSC theory. We gave examples to explain how FCM can be adapted to execute the causal mechanism of BSC, and also how FCM can support group decision-making and forecasting in performance measurement.
文摘Knowledge has become the most important strategic resource of firms, and the competition among firms is more based on knowledge than before. To deal with this challenge, some firms are trying to develop knowledge strategies to direct their knowledge management activities, but current strategic performance measurement systems can't evaluate the performance of knowledge strategies appropriately. This article develops a performance measurement system for knowledge strategies based on Balanced Scorecard, and simulates the system with an improved Data Envelopment Analysis (DEA) model.
文摘State departments of transportation’s (DOTs) decisions to invest resources to expand or implement intelligent transportation systems (ITS) programs or even retire existing infrastructure need to be based on performance evaluations. Nonetheless, an apparent gap exists between the need for ITS performance measurements and the actual implementation. The evidence available points to challenges in the ITS performance measurement processes. This paper evaluated the state of practice of performance measurement for ITS across the US and provided insights. A comprehensive literature review assessed the use of performance measures by DOTs for monitoring implemented ITS programs. Based on the gaps identified through the literature review, a nationwide qualitative survey was used to gather insights from key stakeholders on the subject matter and presented in this paper. From the data gathered, performance measurement of ITS is fairly integrated into ITS programs by DOTs, with most agencies considering the process beneficial. There, however, exist reasons that prevent agencies from measuring ITS performance to greater detail and quality. These include lack of data, fragmented or incomparable data formats, the complexity of the endeavor, lack of data scientists, and difficulty assigning responsibilities when inter-agency collaboration is required. Additionally, DOTs do not benchmark or compare their ITS performance with others for reasons that include lack of data, lack of guidance or best practices, and incomparable data formats. This paper is relevant as it provides insights expected to guide DOTs and other agencies in developing or reevaluating their ITS performance measurement processes.
基金projects MARGIN(Integrated and Responsive Maritime Supply Chain)funded by the Regional Research Fund Mid-Norway,EFFEKT(Effective Production of Advanced Maritime Equipment)the SFI Norman(Norwegian Manufacturing Future)programme supported by the Research Council of Norway and the project Linked Design(Linked Knowledge in Manufacturing,Engineering and Design)with funding from the European Union's Seventh Framework Programme([FP7/2007-2013])(Grant No.284613)
文摘There are many different production situations that can be employed to meet demand. In the engineer-to- order (ETO) production situation, products are manufac- tured to meet specific customer needs by unique engineering or significant customization. In such an environment, failing to supply the required materials in the right quantities and at the right time increases the risk of breaching due date agreements and thereby losing customer satisfaction. As such, materials management is one of the most important and critical processes within production planning and control in ETO. To bring attention and improvement to this area, ETO companies may benefit from a performance measurement system (PMS) that systematically monitors how well mate- rials management is carried out. The design of a company's PMS varies with its production situation. Within the large body of literature on performance management and mea- surement, limited literature specifically addressing perfor- mance measurement in ETO has been identified. After being approached by a Norwegian ETO company requesting a PMS for materials management, the authors therefore set out to design the PMS from scratch, using literature on ETO, materials management and performance management and measurement as a starting point. The paper presents the proposed PMS. It provides a basis for further studies on the topic, and could be used by managers in ETO companies to assess and improve their materials management practice.
文摘Workflow logs that record the execution of business processes offer very valuable data resource for real-time enterprise performance measurement. In this paper, a novel scheme that uses the technology of data warehouse and OLAP to explore workflow logs and create complex analysis reports for enterprise performance measurement is proposed. Three key points of this scheme are studied: 1) the measure set; 2) the open and flexible architecture for workflow logs analysis system; 3) the data models in WFMS and data warehouse. A case study that shows the validity of the scheme is also provided.
文摘Emerging connected vehicle (CV) data sets have recently become commercially available, enabling analysts to develop a variety of powerful performance measures without deploying any field infrastructure. This paper presents several tools using CV data to evaluate traffic progression quality along a signalized corridor. These include both performance measures for high-level analysis as well as visualizations to examine details of the coordinated operation. With the use of CV data, it is possible to assess not only the movement of traffic on the corridor but also to consider its origin-destination (O-D) path through the corridor. Results for the real-world operation of an eight-intersection signalized arterial are presented. A series of high-level performance measures are used to evaluate overall performance by time of day, with differing results by metric. Next, the details of the operation are examined with the use of two visualization tools: a cyclic time-space diagram (TSD) and an empirical platoon progression diagram (PPD). Comparing flow visualizations developed with different included O-D paths reveals several features, such as the presence of secondary and tertiary platoons on certain sections that cannot be seen when only end-to-end journeys are included. In addition, speed heat maps are generated, providing both speed performance along the corridor and locations and the extent of the queue. The proposed visualization tools portray the corridor’s performance holistically instead of combining individual signal performance metrics. The techniques exhibited in this study are compelling for identifying locations where engineering solutions such as access management or timing plan change are required. The recent progress in infrastructure-free sensing technology has significantly increased the scope of CV data-based traffic management systems, enhancing the significance of this study. The study demonstrates the utility of CV trajectory data for obtaining high-level details of the corridor performance as well as drilling down into the minute specifics.
基金supported by the National Natural Science Foundation of China(No.62293481,No.62071058)。
文摘As a novel paradigm,semantic communication provides an effective solution for breaking through the future development dilemma of classical communication systems.However,it remains an unsolved problem of how to measure the information transmission capability for a given semantic communication method and subsequently compare it with the classical communication method.In this paper,we first present a review of the semantic communication system,including its system model and the two typical coding and transmission methods for its implementations.To address the unsolved issue of the information transmission capability measure for semantic communication methods,we propose a new universal performance measure called Information Conductivity.We provide the definition and the physical significance to state its effectiveness in representing the information transmission capabilities of the semantic communication systems and present elaborations including its measure methods,degrees of freedom,and progressive analysis.Experimental results in image transmission scenarios validate its practical applicability.
文摘Objective:Although evidence has already demonstrated that the performance of Health Deliv- ery System(HDS) varies widely across nations,relatively little is known about the factors that give rise to these variations and the key point to improve the performance besides adjusting system structure.By setup of HDS performance measurement system on the base of association of financial,social,and environmental characteristics,we construct system dynamic model of HDS to simulate the invention policies.Methods: Performance measures were collected from HDS in 31 regions of China and combined with secondary data sources.Multivariate,linear,nonlinear regression and factor analysis models were used to estimate associ- ations between system characteristics and the performance.Results:Performance varied significantly with the size,financial resources and organizational structure of HDS.Performance measurement system of health delivery system was developed to give the rank of all Chinese regions.Conclusion:Performance measurement system of HDS is the basic of HDS modeling by system dynamic.
文摘Performance measurement(PM)generates useful data for process control,facilitates communication between different sectors,and helps to align efforts on the most important aspects of the business.Thus,PM plays a key role in the management of projects and organizations.PM is also important in the implementation of lean production principles and methods,such as reducing the share of nonvalue-adding activities,increasing process transparency,building continuous improvement into the process,and benchmarking.Moreover,the adoption of the lean production philosophy requires changes in PM.Despite its importance,limited studies have been conducted on the use of PM systems for assessing the impact of lean production programs in construction projects.In addition,studies on how lean companies(or projects)use performance measurement and to what extent the indicators adopted reflect the result of actions that have been undertaken are limited.This study proposes a set of requirements in PM systems of construction projects from the perspective of lean production and a taxonomy of performance metrics for lean production systems.Five empirical studies have been carried out on construction companies from South America involved in the implementation of lean production systems.The scope of this investigation is limited to the construction projects as production systems rather than PM at the level of construction organizations.
文摘Local arterials can be significantly impacted by diversions from adjacent work zones. These diversions often occur on unofficial detour routes due to guidance received on personal navigation devices. Often, these routes do not have sufficien<span style="font-family:Verdana;">t sensing or communication equipment to obtain infrastructure-based tra</span><span style="font-family:Verdana;">ffic signal performance measures, so other data sources are required to identify locations being significantly affected by diversions. This paper examines the network impact caused by the start of an 18-month closure of the I-65/70 interchange (North Split), which usually serves approximately 214,000 vehicles per day in Indianapolis, IN. In anticipation of some proportion of the public diverting from official detour routes to local streets, a connected vehicle monitoring program was established to provide daily performances measures for over 100 intersections in the area without the need for vehicle sensing equipment. This study reports on 13 of the most impacted signals on an alternative arterial to identify locations and time of day where operations are most degraded, so that decision makers have quantitative information to make informed adjustments to the system. Individual vehicle movements at the studied locations are analyzed to estimate changes in volume, split failures, downstream blockage, arrivals on green, and travel times. Over 130,000 trajectories were analyzed in an 11-week period. Weekly afternoon peak period volumes increased by approximately 455%, split failures increased 3%, downstream blockage increased 10%, arrivals on green decreased 16%, and travel time increase 74%. The analysis performed in this paper will serve as a framework for any agency that wants to assess traffic signal performance at hundreds of locations with little or no existing sensing or communication infrastructure to prioritize tactical retiming and/or longer-term infrastructure investments.</span>
文摘Large diameter fans with low solidity are widely used in automotive application for engine cooling. Their designs with small chord length help reducing the torque on the electrical motor and providing a good aerodynamic compromise between several operating conditions, some of these being at high flow rate. Their global performances are measured according to the ISO standard DP 5801, which allows comparison of results from different facilities. However, some variations in global performances are observed when considering results from two different test rigs. On a fan selected for the purpose of this study, up to 6 % of efficiency is lost on the worst case. As efficiency is more than ever a key factor to select a component, some experimental and numerical investigations were conducted to analyze the fan behavior on each facility. Two sets of measurement and simulation are performed and compared. Geometries considered for the domain of computation include the test rig plenum, the torquemeter, the ground and a large domain for the atmospheric conditions. The exact fan geometry with tip clearance and under-hub ribs is also considered. Numerical results show a good agreement with experiment in both cases when convergence is reached and for low flow rate when computations are switched to unsteady mode. Comparisons show that simulations are able to capture the different fan behaviors depending on the confguration and those efficiency losses previously observed are correctly predicted. These results are further analyzed to perform some post-processing. Blade loading remains identical for both cases but disparities appear in the wake and its interaction with the surrounding. Tiny details that are often neglected during experiment and/or simulation appear to be the cause of slight variations. Position of the torquemeter and shape of the plenum are among the parameters that various and that have cumulative effects. Efficiency being a ration of pressure and torque, variations are rather important. Finally, these results are discussed in terms of rules for conception and a new geometry less sensible to loss of efficiency is proposed.
基金supported by the National Key Research and Development Program of China(No.2020YFE0200500)。
文摘WiFi has become one of the most popular ways to access the Internet.However,in large-scale campus wireless networks,it is challenging for network administrators to provide optimized access quality without knowledge on fine-grained traffic characteristics and real network performance.In this paper,we implement PerfMon,a network performance measurement and diagnosis system,which integrates collected multi-source datasets and analysis methods.Based on PerfMon,we first conduct a comprehensive measurement on application-level traffic patterns and behaviors from multiple dimensions in the wireless network of T university(TWLAN),which is one of the largest campus wireless networks.Then we systematically study the application-level network performance.We observe that the application-level traffic behaviors and performance vary greatly across different locations and device types.The performance is far from satisfactory in some cases.To diagnose these problems,we distinguish locations and device types,and further locate the most crucial factors that affect the performance.The results of case studies show that the influential factors can effectively characterize performance changes and explain for performance degradation.
基金National Natural Science Foundation of China(No.61963023)。
文摘The short-range wireless communication technology has advanced considerably and provides the feasibility of train-train(T2T)communication link in the communication-based train control system.The introduction of the T2T link would reduce the headway and improve operational efficiency.Formal methods are system design techniques that use rigorously specified mathematical models to ensure all behaviors work as expected.And it is exactly the functional safety verification needed.Therefore,to deal with the functional safety verification of the T2T link,an untimed colored petri net model is first constructed.Secondly,the verification process is performed.Conclusions can be drawn from the state space report and the computation tree logic queries.Lastly,the model is parameterized,and then data log files are obtained for further performance measurement.Results show that the proposed criteria are satisfied and there are no defects in the basic design requirements.The transmission delay has considered the reconnection,transmission errors and the interruption.The probability of the delay lower than 150 ms accounts for 98.106%,which meets the specification and the previous field test.
基金the High Technology Research and Development Program of China(No2003AA005031)
文摘A novel thennoelectric generating and performance measuring system (TGPMS) was designed and fabricated. TGPMS can not only achieve the function of thennoelectric generation, but also measure the thennoelectric performance parameters of the bismuth-telluride-based thennoelectric device accurately. These thennoelectric performance parameters mainly include the dependence of the Seebeck coefficient of the thennoelectric device on the device's temperature in the low temperature range (about 40 ~ 190~C ), and the dependence of the power output and thermoelectric conversion efficiency on the temperature dif- ference or output load. With the optimum load, the optimal value of the power output is 3.39W when the temperature difference reaches 231.2~C, and the optimal value of the conversion efficiency is 3.22% when the temperature difference reaches 208.9~C. TGPMS provides an experimental foundation for the application of the thennoelectric generators in the space field.
文摘International joint ventures (IJVs) have increasingly their role in business world and also in research field of international business. There have been a lot of studies related to determinant factors of IJV performance. However, there are very few studies focusing on the measurement of I Jr performance. Especially, researchers have ignored how foreign parent firms really choose their measures in the evaluation of their IJV performance. This research investigates determinant factors of performance measures of 1JVs. Determinant factors of IJV performance measures include motives for establishment, establishment mode, location of IJVs, distribution of ownership in IJVs, cultural background of parent firms, and trust between partners, IJV life stages, parent firms' international experience, and relatedness of the IJVs to their parents. Performance measures are divided into financial measures and non-financial measures. The paper shows how different determinant factors are expected to lead foreign parent firms preferring one kind of measure over the other.
文摘This study develops a procedure to rank agencies based on their incident responses using roadway clearance times for crashes. This analysis is not intended to grade agencies but to assist in identifying agencies requiring more training or resources for incident management. Previous NCHRP reports discussed usage of different factors including incident severity, roadway characteristics, number of lanes involved and time of incident separately for estimating the performance. However, it does not tell us how to incorporate all the factors at the same time. Thus, this study aims to account for multiple factors to ensure fair comparisons. This study used 149,174 crashes from Iowa that occurred from 2018 to 2021. A Tobit regression model was used to find the effect of different variables on roadway clearance time. Variables that cannot be controlled directly by agencies such as crash severity, roadway type, weather conditions, lighting conditions, etc., were included in the analysis as it helps to reduce bias in the ranking procedure. Then clearance time of each crash is normalized into a base condition using the regression coefficients. The normalization makes the process more efficient as the effect of uncontrollable factors has already been mitigated. Finally, the agencies were ranked by their average normalized roadway clearance time. This ranking process allows agencies to track their performance of previous crashes, can be used in identifying low performing agencies that could use additional resources and training, and can be used to identify high performing agencies to recognize for their efforts and performance.
基金This paper is supported by National Social Science Foundation of China (No.96AJB043) and the Fund for Young Faculty of Tianjin University (No.5110104).
文摘Balanced scorecard is a strategic information system and a performance measurement system. It integrates almost all the interests of stakeholders and mainly comprises four perspectives: management, operational, marketing, and knowledge.
文摘In 1997 the Michigan Department of Transportation (MDOT) established an ambitious set of condition targets for its pavements and bridges, and the Department received increased revenue from a 4-cent-per-gallon increase in the state motor fuels tax to help meet its targets. However, over time, actual revenue was less than both what was initially estimated as needed to meet the targets and what was projected from the tax increase. Consequently, actual conditions were projected to fall short of the target levels, so the department issued bonds to address the shortfall through 2012. To support deliberations on future funding, in 2013 MDOT performed an analysis of historic conditions to determine what additional fuel tax revenues would have been required beginning in 1997 to: replace bond revenues used to fund pavement and bridge projects from 1997 to 2012;and enable MDOT to meet its condition targets. The analysis was performed using data on actual pavement and bridge funding and conditions;as well as predicted funding and conditions for different hypothetical increases in fuel taxes. The analysis concluded that, in addition to the actual increase of 4 cents per gallon, a fuel tax increase of another 10 cents per gallon would have been required in 1997 to replace bond revenue used for pavement and bridges and allow MDOT to meet its condition targets. The analysis results were used to help inform the discussion of Michigan’s target asset conditions and funding, and demonstrate application of MDOT’s pavement and bridge management systems for performing historic analyses.
文摘Green supply chain is one of the trends of industry development. And performance measurement is the key to implementing the supply chain. So it is necessary to evaluate the environmental performance of supply chain .According to the connotation of green supply chain and the standards of environmental management, this paper designs green performance measurement systems which is composed of four main factors such as waste emissions and exposure hazard, resource utilization, product recovery, and environmental reputation. And the authors delve deeply these factors so that it forms a two-level measurement system. Then the effect on the traditional performance measurement of supply chain is studied after taking greening to the supply chain leveL At last the authors apply the method of multi-level fuzzy judgment to the environmental performance measurement system. An example is given to show the judgment process.
文摘Since the first Diverging Diamond Interchange (DDI) implementation in 2009, most of the performance studies developed for this type of interchange have been based on simulations and historical crash data, with a small numbe<span style="font-family:Verdana;">r of studies using Automated Traffic Signal Performance Measures (ATS</span><span style="font-family:Verdana;">PM). Simulation models require considerable effort to collect volumes and to model actual controller operations. Safety studies based on historical crashes usually require from 3 to 5 years of data collection. ATSPMs rely on sensing equipment. This study describes the use of connected vehicle trajectory data to analyze the performance of a DDI located in the metropolitan area of Fort Wayne, IN. An extension of the Purdue Probe Diagram (PPD) is proposed to assess the levels of delay, progression, and saturation. Further, an additional PPD variation is presented that provides a convenient visualization to qualitatively understand progression patterns and to evaluate queue length for spillback in the critical interior crossover. Over 7000 trajectories and 130,000 GPS points were analyzed between the 7</span><sup><span style="font-family:Verdana;">th</span></sup><span style="font-family:Verdana;"> and the 11</span><sup><span style="font-family:Verdana;">th</span></sup><span style="font-family:Verdana;"> of June 2021 from 5:00 AM to 10:00 PM to estimate the DDI’s arrivals on green, level of service, split failures, and downstream blockage. Although this technique was demonstrated for weekdays, the ubiquity of connected vehicle data makes it very ea</span><span style="font-family:Verdana;">sy to adapt these techniques to analysis during special events, winter sto</span><span style="font-family:Verdana;">rms, and weekends. Furthermore, the methodologies presented in this paper can be applied by any agency wanting to assess the performance of any DDI in their jurisdiction.</span>