期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Integrated Control Model for Time and Cost Risk in Project Management
1
作者 程铁信 张伟波 张勇 《Transactions of Tianjin University》 EI CAS 2002年第2期99-105,共7页
Time, cost and quality are the three main targets to be controled in project management. However, the control and management of time and cost risk are usually carried out respectively, which will bring such problems a... Time, cost and quality are the three main targets to be controled in project management. However, the control and management of time and cost risk are usually carried out respectively, which will bring such problems as the delay of schedule by reason of the impracticability of cash flow, the money difficulties caused by delay of schedule and so on. In order to control and manage the time and cost risk effectively and simultaneously, a time & cost risk control model based on schedule programme was established with the use of the quantitativemodels of BCWS, BCWP and ACWP in this paper. Subsequently, the analysis of variance for the whole project and the single activity was introduced on the basis of BCWS, BCWP and ACWP so that the project can be controlled and managed effectively. Furthermore, an example given behind in detail expressly illustrated that the model set up above was practicableto project management. However, the method of optimizing the cash flow based on time and cost risk to obtain BCWS should be considered properlyand carefully with respect to the different circumstances of the project, and an efficient and adequate interval report system should be set up on the site of the project. 展开更多
关键词 project management budgeted cost of work performed (BCWP) actual cost work performed (ACWP) budget cost of workscheduled (BCWS)
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部