With the continuous progress of manufacturing industry,automatic assembly line has become a very mature production mode in modern factories,and the quality of assembly line design has become an important issue related...With the continuous progress of manufacturing industry,automatic assembly line has become a very mature production mode in modern factories,and the quality of assembly line design has become an important issue related to the development of manufacturing enterprises.In this paper,a graphical model based on Petri Net is established for the first full load time of the assembly line.The accessibility of the P/T system and the production rhythm of the assembly line are calculated by computer simulation.Finally,according to the simulation model,an experimental platform is built to verify the rationality of the model.Experimental results show that the model can accurately express the equipment allocation process of assembly line.展开更多
针对混流装配线工序加工资源需求多样、工艺复杂、装配工期长等问题,采用Petri网和改进遗传算法对该问题进行优化求解。建立混流装配线赋时库所Petri网(timed place Petri net, TPPN)调度模型,基于模型激发序列,采用基于工序的编码方式...针对混流装配线工序加工资源需求多样、工艺复杂、装配工期长等问题,采用Petri网和改进遗传算法对该问题进行优化求解。建立混流装配线赋时库所Petri网(timed place Petri net, TPPN)调度模型,基于模型激发序列,采用基于工序的编码方式进行染色体编码;采用精英保留策略选择优异个体,改进遗传算法的交叉、变异操作,用改进后的遗传算法求解混流装配线调度问题。通过对比案例及实例数据计算结果验证了方案的有效性。展开更多
为了实现飞机总装生产线精确建模和提高建模效率,提出层次时间着色Petri网(Hierachical Timed Color Petri Net,HTCPN)多层级理论模型,定义了HTCPN层次化建模方法。针对某飞机总装生产线站位划分的多层级、多粒度特点,利用CPN Tools工具...为了实现飞机总装生产线精确建模和提高建模效率,提出层次时间着色Petri网(Hierachical Timed Color Petri Net,HTCPN)多层级理论模型,定义了HTCPN层次化建模方法。针对某飞机总装生产线站位划分的多层级、多粒度特点,利用CPN Tools工具对A1、A2和A3三种型号飞机总装配过程进行HTCPN建模,根据交货期前后设置优先级,并在每个站位的装配过程中嵌套质量检测模型。最后对模型进行10次仿真,统计平均作业时间分别为78.4、93.2、102.4 h,产品总收益率为82.7%。展开更多
文摘With the continuous progress of manufacturing industry,automatic assembly line has become a very mature production mode in modern factories,and the quality of assembly line design has become an important issue related to the development of manufacturing enterprises.In this paper,a graphical model based on Petri Net is established for the first full load time of the assembly line.The accessibility of the P/T system and the production rhythm of the assembly line are calculated by computer simulation.Finally,according to the simulation model,an experimental platform is built to verify the rationality of the model.Experimental results show that the model can accurately express the equipment allocation process of assembly line.
文摘针对混流装配线工序加工资源需求多样、工艺复杂、装配工期长等问题,采用Petri网和改进遗传算法对该问题进行优化求解。建立混流装配线赋时库所Petri网(timed place Petri net, TPPN)调度模型,基于模型激发序列,采用基于工序的编码方式进行染色体编码;采用精英保留策略选择优异个体,改进遗传算法的交叉、变异操作,用改进后的遗传算法求解混流装配线调度问题。通过对比案例及实例数据计算结果验证了方案的有效性。
文摘为了实现飞机总装生产线精确建模和提高建模效率,提出层次时间着色Petri网(Hierachical Timed Color Petri Net,HTCPN)多层级理论模型,定义了HTCPN层次化建模方法。针对某飞机总装生产线站位划分的多层级、多粒度特点,利用CPN Tools工具对A1、A2和A3三种型号飞机总装配过程进行HTCPN建模,根据交货期前后设置优先级,并在每个站位的装配过程中嵌套质量检测模型。最后对模型进行10次仿真,统计平均作业时间分别为78.4、93.2、102.4 h,产品总收益率为82.7%。