Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant,the first commercial heavy water reactor nuclear power plant in China,was the biggest trade project performed between the governments of China and Canada.As the owner,the Thir...Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant,the first commercial heavy water reactor nuclear power plant in China,was the biggest trade project performed between the governments of China and Canada.As the owner,the Third Qinshan Nuclear Power Company(TQNPC)persisted in independent innovation management during the project construction,commissioning and self-dependent operation,efficiently realizing the three controls of the project,i.e.quality control,schedule control and investment control,and persisted in technical improvement on the basis of digestion and absorption of CANDU-6 technology to improve the unit safety and reliability.The project construction practice has helped China's nuclear power project management to becomeprogrammed,computerized,standardized and internationalized management from the existing basis.After completion of the project,with unit safe and steady operation as the prerequisite,TQNPC performed several technical modifications and innovations to continuously improve the unit performance.In the area of staff development,TQNPC paid much attention to cultivation of corporate culture,strengthed staff training and built up a good circulating mechanism with staff training and project construction promoting each other.Further to "Zero Breakthrough" and a new step forward of locolization successfully realized in Qinshan Nuclear Power Plant and Nuclear Power Qinshan Joint Venture Company,the improvement and developemnt of nuclear power project management level in Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant provided reference for promotion of nuclear power development in China and standardized management of introducing large imported project.展开更多
Conventional electron and optical microscopy techniques require the sample to be sectioned, polished or etched to expose the internal surfaces for imaging. However, such sample preparation techniques have traditionall...Conventional electron and optical microscopy techniques require the sample to be sectioned, polished or etched to expose the internal surfaces for imaging. However, such sample preparation techniques have traditionally prevented the observation of the same sample over time, under realistic three-dimensional geometries and in an environment representative of real-world operating conditions. X-ray microscopy (XRM) is a rapidly emerging technique that enables non-destructive evaluation of buried structures within hard to soft materials in 3D, requiring little to no sample preparation. Furthermore in situ and 4D quantification of microstructural evolution under controlled environment as a function of time, temperature, chemistry or stress can be done repeatable on the same sample, using practical specimen sizes ranging from tens of microns to several cm diameter, with achievable imaging resolution from submicron to 50 nm. Many of these studies were reported using XRM in synchrotron beamlines. These include crack propagation on composite and construction materials; corrosion studies; microstructural changes during the setting of cement; flow studies within porous media to mention but a few.展开更多
The study was carried out exclusively in Ghana to explore the approaches employed by consultants in risk assessment at the design phase of projects in Ghana. One hundred and fourteen (114) consultants were selected ou...The study was carried out exclusively in Ghana to explore the approaches employed by consultants in risk assessment at the design phase of projects in Ghana. One hundred and fourteen (114) consultants were selected out of a population of one hundred and eighty six (186) from three main professional associations in Ghana made up of the Ghana Institute of Architects, Ghana Institution of Engineers and the Ghana Institution of Surveyors (Quantity Surveying Division) practicing in Ghana for the study. Both primary and secondary data were collected. A descriptive survey was also used to observe and describe the presence, frequency or absence of characteristics of a phenomenon as it naturally occurred, in order to gain additional information. A questionnaire was also designed to collect data from the architects, engineers and quantity surveyors. The data was analyzed using Statistical Package for the Social Scientists (SPSS) 17.0. Descriptive and inferential statistics, such as frequency tables, percentages and cross tabulations were used in the data analysis and summaries. Simple tests of associations were undertaken by using Chi square and Cramer’s V statistics to compare relationships between variables. Again, relative importance index was also used to analyze some of the data by computing to deduce their rankings. The relative importance index was used to analyze some of the data by computing to deduce their rankings. The research revealed that majority of consultants had an average knowledge of risk management. Based on the findings it was recommended that consultants undergo advanced training in risk assessment. It was therefore suggested that consultancy firms should develop a set of laid down procedures for consultants to use in risk assessment in order that the use of intuition employed by majority is lessened. The challenges observed in risk assessment and the remedial steps suggested curtailing the detrimental effects of risks would be of wide importance to many developing economies.展开更多
Due to the use of mechanical and electrical equipments in different buildings during construction phase, energy consumption produces large amounts of carbon emissions.Based on the energy use of China, we established a...Due to the use of mechanical and electrical equipments in different buildings during construction phase, energy consumption produces large amounts of carbon emissions.Based on the energy use of China, we established a formula that was applicable to carbon-emission calculation, and discussed carbon-emission characteristics of concrete structures and steel construction.Owing to the difference of electrical and mechanical equipment used in construction phase, the results show that under the same conditions, the carbon emission intensity of a concrete structure building is much higher than that of a steel building.At last, we also put forward some emission reduction measures based on the calculation data of different buildings.展开更多
In this paper,the dominance of the national enterprise and current situation of project management are analyzed on the basis of sum of Phase Ⅰ Construction management of the Three Gorges Project.From the start point ...In this paper,the dominance of the national enterprise and current situation of project management are analyzed on the basis of sum of Phase Ⅰ Construction management of the Three Gorges Project.From the start point of idea modification and inner reformation of enterprise,some of concrete suggestions enhancing the project management, are offered in the paper.展开更多
Aim To assess the safety and tolerance of adefovir dipivoxil (ADV) in Chinese healthy volunteers. Methods A total of 52 healthy volunteers, 26 males and 26 females, aged from 19 to 26 were enrolled in the study. For...Aim To assess the safety and tolerance of adefovir dipivoxil (ADV) in Chinese healthy volunteers. Methods A total of 52 healthy volunteers, 26 males and 26 females, aged from 19 to 26 were enrolled in the study. Forty-two subjects were randomized into 5, 10, 20, 40, and 60 mg dose groups (6 - 10 subjects in each) matched by sex and weight for single-dose trial. Ten subjects were orally given 10 mg of ADV tablets once daily for 7 d for multiple-dose trial. Physical examination, vital signs examination, electrocardiography, type-B ultrasonography, chest fluoroscopy, routine blood test, routine urine test, coagulation tests, and blood biochemical test were conducted on schedule and statistically evaluated. Results Asthenia frequently occurred in multiple-dose trial, nausea, abdominal pain, and diarrhea occurred in both single- and multiple-dose trials. ALT, bilirubin, CK, and LDH were slightly elevated. All adverse reactions and laboratory abnormalities were mild, and the frequency and severity were not related to doses. Conclusion ADV is safe and well tolerated in Chinese healthy volunteers at dose of 5 - 60 mg oncedaily or 10 nag once daily for 7 d. The recommended oral dosage regimen is 10 mg once daily. Attention should be paid to renal and liver functions, CK, AMY and LDH, if we take ADV for a long period of time.展开更多
Objective:Fluzoparib(SHR3162)is a novel,potent poly(ADP-ribose)polymerases(PARP)1,2 inhibitor that showed anti-tumor activity in xenograft models.We conducted a phaseⅠ,first-in-human,dose-escalation and expansion(D-E...Objective:Fluzoparib(SHR3162)is a novel,potent poly(ADP-ribose)polymerases(PARP)1,2 inhibitor that showed anti-tumor activity in xenograft models.We conducted a phaseⅠ,first-in-human,dose-escalation and expansion(D-Esc and D-Ex)trial in patients with advanced solid cancer.Methods:This was a 3+3 phaseⅠD-Esc trial with a 3-level D-Ex at 5 hospitals in China.Eligible patients for DEsc had advanced solid tumors refractory to standard therapies,and D-Ex enrolled patients with ovarian cancer(OC).Fluzoparib was administered orally once or twice daily(bid)at 11 dose levels from 10 to 400 mg/d.Endpoints included dose-finding,safety,pharmacokinetics,and antitumor activity.Results:Seventy-nine patients were enrolled from March,2015 to January,2018[OC(47,59.5%);breast cancer(BC)(16,20.3%);colorectal cancer(8,10.1%),other tumors(8,10.1%)];48 patients were treated in the D-Esc arm and 31 in the D-Ex arm.The maximum tolerated dose(MTD)was 150 mg bid,with a half-life of 9.14 h.Grade 3/4 adverse events included anemia(7.6%)and neutropenia(5.1%).The objective response rate(ORR)was 30%(3/10)in patients with platinum-sensitive OC and 7.7%(1/13)in patients with BC.Among patients treated with fluzoparib≥120 mg/d,median progression-free survival(m PFS)was 7.2[95%confidence interval(95%CI),1.8-9.3]months in OC,9.3(95%CI,7.2-9.3)months in platinum-sensitive OC,and 3.5(range,2.0-28.0)months in BC.In patients with germline BC susceptibility gene mutation(g BRCAMut)(11/43 OC;2/16 BC),m PFS was 8.9 months for OC(range,1.0-23.2;95%CI,1.0-16.8)and 14 and 28 months for BC(those two patients both also had somatic BRCAMut).Conclusions:The MTD of fluzoparib was 150 mg bid in advanced solid malignancies.Fluzoparib demonstrated single-agent antitumor activity in BC and OC,particularly in BRCAMut and platinum-sensitive OC.展开更多
Phase Ⅰ of clinical trials is the first stage of clinical pharmacology and body safety evaluation,including body tolerance test and pharmacokinetics test.The aim is providing evidence for dosage regimen and be the co...Phase Ⅰ of clinical trials is the first stage of clinical pharmacology and body safety evaluation,including body tolerance test and pharmacokinetics test.The aim is providing evidence for dosage regimen and be the cornerstone of the preliminary assessment of efficacy and safety of phase Ⅱ of clinical trials.This text discussed the technique and requirement of phase Ⅰ of new drugs' clinical tolerance trials.展开更多
The building sector plays a key role in the global economic,social,and environment development.The energy consumed during construction and operation processes accounts for around 40%of the global energy use.China is t...The building sector plays a key role in the global economic,social,and environment development.The energy consumed during construction and operation processes accounts for around 40%of the global energy use.China is the largest developing country and its construction market is one of the largest markets in the world.Although the construction phase occupies only a short period over the entire life cycle of a building,it is still an essential aspect of the process.However,in China,the concept of green construction remains scarcely known among construction industry members.Green construction continues to experience a disparity in the Chinese construction industry.Therefore,the aim of this study is to appraise the concept of green construction in the Chinese construction industry and to consider how it could be applied in most Chinese construction projects.展开更多
文摘Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant,the first commercial heavy water reactor nuclear power plant in China,was the biggest trade project performed between the governments of China and Canada.As the owner,the Third Qinshan Nuclear Power Company(TQNPC)persisted in independent innovation management during the project construction,commissioning and self-dependent operation,efficiently realizing the three controls of the project,i.e.quality control,schedule control and investment control,and persisted in technical improvement on the basis of digestion and absorption of CANDU-6 technology to improve the unit safety and reliability.The project construction practice has helped China's nuclear power project management to becomeprogrammed,computerized,standardized and internationalized management from the existing basis.After completion of the project,with unit safe and steady operation as the prerequisite,TQNPC performed several technical modifications and innovations to continuously improve the unit performance.In the area of staff development,TQNPC paid much attention to cultivation of corporate culture,strengthed staff training and built up a good circulating mechanism with staff training and project construction promoting each other.Further to "Zero Breakthrough" and a new step forward of locolization successfully realized in Qinshan Nuclear Power Plant and Nuclear Power Qinshan Joint Venture Company,the improvement and developemnt of nuclear power project management level in Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant provided reference for promotion of nuclear power development in China and standardized management of introducing large imported project.
文摘Conventional electron and optical microscopy techniques require the sample to be sectioned, polished or etched to expose the internal surfaces for imaging. However, such sample preparation techniques have traditionally prevented the observation of the same sample over time, under realistic three-dimensional geometries and in an environment representative of real-world operating conditions. X-ray microscopy (XRM) is a rapidly emerging technique that enables non-destructive evaluation of buried structures within hard to soft materials in 3D, requiring little to no sample preparation. Furthermore in situ and 4D quantification of microstructural evolution under controlled environment as a function of time, temperature, chemistry or stress can be done repeatable on the same sample, using practical specimen sizes ranging from tens of microns to several cm diameter, with achievable imaging resolution from submicron to 50 nm. Many of these studies were reported using XRM in synchrotron beamlines. These include crack propagation on composite and construction materials; corrosion studies; microstructural changes during the setting of cement; flow studies within porous media to mention but a few.
文摘The study was carried out exclusively in Ghana to explore the approaches employed by consultants in risk assessment at the design phase of projects in Ghana. One hundred and fourteen (114) consultants were selected out of a population of one hundred and eighty six (186) from three main professional associations in Ghana made up of the Ghana Institute of Architects, Ghana Institution of Engineers and the Ghana Institution of Surveyors (Quantity Surveying Division) practicing in Ghana for the study. Both primary and secondary data were collected. A descriptive survey was also used to observe and describe the presence, frequency or absence of characteristics of a phenomenon as it naturally occurred, in order to gain additional information. A questionnaire was also designed to collect data from the architects, engineers and quantity surveyors. The data was analyzed using Statistical Package for the Social Scientists (SPSS) 17.0. Descriptive and inferential statistics, such as frequency tables, percentages and cross tabulations were used in the data analysis and summaries. Simple tests of associations were undertaken by using Chi square and Cramer’s V statistics to compare relationships between variables. Again, relative importance index was also used to analyze some of the data by computing to deduce their rankings. The relative importance index was used to analyze some of the data by computing to deduce their rankings. The research revealed that majority of consultants had an average knowledge of risk management. Based on the findings it was recommended that consultants undergo advanced training in risk assessment. It was therefore suggested that consultancy firms should develop a set of laid down procedures for consultants to use in risk assessment in order that the use of intuition employed by majority is lessened. The challenges observed in risk assessment and the remedial steps suggested curtailing the detrimental effects of risks would be of wide importance to many developing economies.
基金Funded by Regional Transportation Integration Technology of FAFU (No.Pytd 12006)Science and Technology project of Fujian Education Department (No.JB 11046)
文摘Due to the use of mechanical and electrical equipments in different buildings during construction phase, energy consumption produces large amounts of carbon emissions.Based on the energy use of China, we established a formula that was applicable to carbon-emission calculation, and discussed carbon-emission characteristics of concrete structures and steel construction.Owing to the difference of electrical and mechanical equipment used in construction phase, the results show that under the same conditions, the carbon emission intensity of a concrete structure building is much higher than that of a steel building.At last, we also put forward some emission reduction measures based on the calculation data of different buildings.
文摘In this paper,the dominance of the national enterprise and current situation of project management are analyzed on the basis of sum of Phase Ⅰ Construction management of the Three Gorges Project.From the start point of idea modification and inner reformation of enterprise,some of concrete suggestions enhancing the project management, are offered in the paper.
文摘Aim To assess the safety and tolerance of adefovir dipivoxil (ADV) in Chinese healthy volunteers. Methods A total of 52 healthy volunteers, 26 males and 26 females, aged from 19 to 26 were enrolled in the study. Forty-two subjects were randomized into 5, 10, 20, 40, and 60 mg dose groups (6 - 10 subjects in each) matched by sex and weight for single-dose trial. Ten subjects were orally given 10 mg of ADV tablets once daily for 7 d for multiple-dose trial. Physical examination, vital signs examination, electrocardiography, type-B ultrasonography, chest fluoroscopy, routine blood test, routine urine test, coagulation tests, and blood biochemical test were conducted on schedule and statistically evaluated. Results Asthenia frequently occurred in multiple-dose trial, nausea, abdominal pain, and diarrhea occurred in both single- and multiple-dose trials. ALT, bilirubin, CK, and LDH were slightly elevated. All adverse reactions and laboratory abnormalities were mild, and the frequency and severity were not related to doses. Conclusion ADV is safe and well tolerated in Chinese healthy volunteers at dose of 5 - 60 mg oncedaily or 10 nag once daily for 7 d. The recommended oral dosage regimen is 10 mg once daily. Attention should be paid to renal and liver functions, CK, AMY and LDH, if we take ADV for a long period of time.
文摘Objective:Fluzoparib(SHR3162)is a novel,potent poly(ADP-ribose)polymerases(PARP)1,2 inhibitor that showed anti-tumor activity in xenograft models.We conducted a phaseⅠ,first-in-human,dose-escalation and expansion(D-Esc and D-Ex)trial in patients with advanced solid cancer.Methods:This was a 3+3 phaseⅠD-Esc trial with a 3-level D-Ex at 5 hospitals in China.Eligible patients for DEsc had advanced solid tumors refractory to standard therapies,and D-Ex enrolled patients with ovarian cancer(OC).Fluzoparib was administered orally once or twice daily(bid)at 11 dose levels from 10 to 400 mg/d.Endpoints included dose-finding,safety,pharmacokinetics,and antitumor activity.Results:Seventy-nine patients were enrolled from March,2015 to January,2018[OC(47,59.5%);breast cancer(BC)(16,20.3%);colorectal cancer(8,10.1%),other tumors(8,10.1%)];48 patients were treated in the D-Esc arm and 31 in the D-Ex arm.The maximum tolerated dose(MTD)was 150 mg bid,with a half-life of 9.14 h.Grade 3/4 adverse events included anemia(7.6%)and neutropenia(5.1%).The objective response rate(ORR)was 30%(3/10)in patients with platinum-sensitive OC and 7.7%(1/13)in patients with BC.Among patients treated with fluzoparib≥120 mg/d,median progression-free survival(m PFS)was 7.2[95%confidence interval(95%CI),1.8-9.3]months in OC,9.3(95%CI,7.2-9.3)months in platinum-sensitive OC,and 3.5(range,2.0-28.0)months in BC.In patients with germline BC susceptibility gene mutation(g BRCAMut)(11/43 OC;2/16 BC),m PFS was 8.9 months for OC(range,1.0-23.2;95%CI,1.0-16.8)and 14 and 28 months for BC(those two patients both also had somatic BRCAMut).Conclusions:The MTD of fluzoparib was 150 mg bid in advanced solid malignancies.Fluzoparib demonstrated single-agent antitumor activity in BC and OC,particularly in BRCAMut and platinum-sensitive OC.
文摘Phase Ⅰ of clinical trials is the first stage of clinical pharmacology and body safety evaluation,including body tolerance test and pharmacokinetics test.The aim is providing evidence for dosage regimen and be the cornerstone of the preliminary assessment of efficacy and safety of phase Ⅱ of clinical trials.This text discussed the technique and requirement of phase Ⅰ of new drugs' clinical tolerance trials.
文摘The building sector plays a key role in the global economic,social,and environment development.The energy consumed during construction and operation processes accounts for around 40%of the global energy use.China is the largest developing country and its construction market is one of the largest markets in the world.Although the construction phase occupies only a short period over the entire life cycle of a building,it is still an essential aspect of the process.However,in China,the concept of green construction remains scarcely known among construction industry members.Green construction continues to experience a disparity in the Chinese construction industry.Therefore,the aim of this study is to appraise the concept of green construction in the Chinese construction industry and to consider how it could be applied in most Chinese construction projects.