期刊文献+
共找到221篇文章
< 1 2 12 >
每页显示 20 50 100
Two-Phase Multi Objective Fuzzy Linear Programming Approach for Sustainable Irrigation Planning
1
作者 D. G. Regulwar Jyotiba B. Gurav 《Journal of Water Resource and Protection》 2013年第6期642-651,共10页
The objective of the present study is to develop the irrigation planning model and to apply the same in the form of Two-Phase Multi Objective Fuzzy Linear Programming (TPMOFLP) approach for crop planning in command ar... The objective of the present study is to develop the irrigation planning model and to apply the same in the form of Two-Phase Multi Objective Fuzzy Linear Programming (TPMOFLP) approach for crop planning in command area of Jayakwadi Project Stage I, Maharashtra State, India. The development of TPMOFLP model is on the basis of various Linear Programming (LP) models and Multi Objective Fuzzy Linear Programming (MOFLP) models, these models have been applied for maximization of the Net Benefits (NB), Crop production (CP), Employment Generation (EG) and Manure Utilization (MU) respectively. The significant increase in the value of level of satisfaction (λ) has been found from 0.58 to 0.65 by using the TPMOFLP approach as compare to that of MOFLP model based on maxmin approach. The two-phase approach solution provides NB = 1503.56 Million Rupees, CP = 335729.30 Tons, EG = 29.74 Million Man days and MU = 160233.70 Tons respectively. The proposed model will be helpful for the Decision Maker (DM) to take a decision under conflicting situation while planning for different conflicting objectives simultaneously and has potential to find out an integrated irrigation planning with prime consideration for economic, social and environmental issue. 展开更多
关键词 SUSTAINABLE IRRIGATION planNING Multi Objective Fuzzy Linear PROGRAMMING Maxmin APPROACH TWO-phase APPROACH
下载PDF
可控电感在WPT系统动态性能的优化方法
2
作者 凌荣光 何磊杰 +3 位作者 刘巧 孟繁超 叶佳青 唐春森 《重庆大学学报》 CAS CSCD 北大核心 2024年第6期103-117,共15页
SS型Buck-WPT(Buck-wireless power transfer)系统由Buck电路和基本的SS型无线电能传输电路组成。该电路系统因为结构和控制方式简单、控制效果明显等优点在感应式无线电能传输方面得到广泛应用。但该电路的动态特性并不能满足一些时变... SS型Buck-WPT(Buck-wireless power transfer)系统由Buck电路和基本的SS型无线电能传输电路组成。该电路系统因为结构和控制方式简单、控制效果明显等优点在感应式无线电能传输方面得到广泛应用。但该电路的动态特性并不能满足一些时变系统对快速性的较高要求。例如,系统在启动时会存在较强震荡和较大超调,系统负载改变时稳定状态会发生改变且存在明显抖动,系统极限空载时原边谐振电流会增大,且该电流值远超出安全工作范围。本文提出了一种基于可控电感的SS型Buck-WPT系统。首先,分析了电感值可调的方法并在COMSOL中建立仿真模型验证其电感值可控的特性。其次,对SS型Buck-WPT系统进行数学建模,将SS型WPT系统作为Buck电路的特殊负载,推导SS型Buck-WPT系统状态空间方程。研究其三维空间内相轨迹的降维描述方法,将该系统用二维相轨迹描述系统运行过程。然后,通过分析启动阶段相轨迹运行规律,改进前级Buck电路。将传统Buck电路中的电感换成可控电感,运用其电感值可调的控制系统开通阶段的运行轨迹,使系统在1个开关周期内无超调快速进入稳态。当系统负载改变时,系统的输出电压会改变,且是不断抖动来回反复的过程,利用PI算法对系统进行恒流控制。通过可控电感控制系统相轨迹,使副边输出能无抖动快速进入稳态,保证输出电压不变。针对SS型谐振网络的Buck-WPT系统中出现空载大电流的问题,提出了将可控电感串联接入原边谐振网络的方法。实时检测原边谐振电流值,该值超过正常工作范围,感值就快速增大,减小原边谐振电流,达到空载时维持原边谐振电流安全值以下。最后,验证上述方法在优化SS型Buck-WPT系统动态特性的有效性,在Simulink中搭建仿真电路。该方法能减小工作条件改变时带来的系统抖动,且在不改变系统响应速度前提下减小超调,优化系统动态性能,增强系统抗负载扰动力,提高系统带负载能力有明显效果。 展开更多
关键词 无线电能传输 动态性能优化 可控电感 相轨迹规划
下载PDF
高超声速飞行器改进阻力加速度剖面设计
3
作者 王哲浩 李田 +2 位作者 闫海冬 胡玉东 高长生 《现代防御技术》 北大核心 2024年第2期115-123,共9页
针对高超声速飞行器在滑翔段标称轨迹制导过程中的阻力加速度剖面设计问题,提出了一种改进的阻力加速度剖面设计方法。为增大飞行器滑翔段航程,改善飞行状态参数,设计了以能量倒数为自变量的二次函数形式剖面,通过改变剖面中点处阻力加... 针对高超声速飞行器在滑翔段标称轨迹制导过程中的阻力加速度剖面设计问题,提出了一种改进的阻力加速度剖面设计方法。为增大飞行器滑翔段航程,改善飞行状态参数,设计了以能量倒数为自变量的二次函数形式剖面,通过改变剖面中点处阻力加速度值的方式对剖面形状进行调整,以满足高超声速飞行器各项约束。仿真结果表明,与传统二次函数阻力加速度剖面进行对比,该阻力加速度剖面能够增加最大滑翔距离,并改善飞行状态参数,能支持飞行器完成禁飞区绕飞任务。 展开更多
关键词 高超声速飞行器 标称轨迹制导 滑翔段 轨迹规划 阻力加速度剖面 过程约束
下载PDF
考虑长期负荷概率预测的储能多阶段优化配置
4
作者 李益民 董海鹰 +1 位作者 丁坤 王金岩 《综合智慧能源》 CAS 2024年第2期19-27,共9页
随着高比例新能源对电网的逐渐渗透,其出力的随机性和不确定性对电力系统的安全稳定运行提出了更高的要求。储能的源荷双向特征,可以作为灵活性资源提升电网的调节能力,当应用在电网侧时,储能配置的功率和容量大小影响电力系统的稳定运... 随着高比例新能源对电网的逐渐渗透,其出力的随机性和不确定性对电力系统的安全稳定运行提出了更高的要求。储能的源荷双向特征,可以作为灵活性资源提升电网的调节能力,当应用在电网侧时,储能配置的功率和容量大小影响电力系统的稳定运行和经济规划。提出了一种考虑长期负荷概率预测的储能多阶段优化配置方法,对电网侧的独立大规模储能进行容量配置。首先,分析电网侧独立储能的成本效益,以多阶段经济性最优为目标,采用非参数组合回归的长期负荷概率预测模型,建立优化模型并采用改进粒子群算法求解。最后,用酒泉地区电力系统进行算例分析,验证所提方法和模型的可行性和优越性,并且从峰谷电价差和新能源利用率两个方面对储能经济性进行了灵敏度分析。 展开更多
关键词 储能优化配置 长期负荷预测 多阶段规划 灵敏度分析 高比例新能源
下载PDF
“生长型”大学校园分期规划建设的研究与实践——以聊城大学东昌学院新校区建设设计项目为例
5
作者 祝军祥 《城市建筑》 2024年第4期143-149,共7页
文章在探讨“生长型”大学校园理念的背景下,以建设完成的聊城大学东昌学院新校区规划设计项目为例,深入研究校园的功能布局、道路交通、景观规划、建筑空间等层面的分期规划方法和策略,提炼出适用于“生长型”大学校园的实践经验,从而... 文章在探讨“生长型”大学校园理念的背景下,以建设完成的聊城大学东昌学院新校区规划设计项目为例,深入研究校园的功能布局、道路交通、景观规划、建筑空间等层面的分期规划方法和策略,提炼出适用于“生长型”大学校园的实践经验,从而为促进校园的灵活性、可持续性发展提供思路,以适应不断变化的学科发展、教育需求和社会环境。 展开更多
关键词 生长型大学 校园分期规划建设 聊城大学东昌学院新校区 校园功能布局 校园道路交通体系
下载PDF
基于积水高度的下凹桥区交通信号实时控制仿真模拟
6
作者 张岳 黄鹏 +3 位作者 尚巍 葛铜岗 田腾飞 张玮嘉 《安全与环境工程》 CAS CSCD 北大核心 2024年第4期109-115,132,共8页
针对目前各大城市下凹桥区降雨积水情态与交通管控无法联动,且下凹桥区降雨积水时交通安全及应急处理处置缺失的问题,系统地解析下凹桥区降雨积水水位感知、安全警示标识和交通信号管控的具体形式,确定下凹桥区周边交通路口相位信号配... 针对目前各大城市下凹桥区降雨积水情态与交通管控无法联动,且下凹桥区降雨积水时交通安全及应急处理处置缺失的问题,系统地解析下凹桥区降雨积水水位感知、安全警示标识和交通信号管控的具体形式,确定下凹桥区周边交通路口相位信号配时的调控模式,进而建立基于积水高度的下凹桥区交通实时控制系统,并采用交通仿真测试环境模拟评估下凹桥区周边交叉口相位信号配时优化方案在不同积水高度条件下的适应性和改善效果。结果表明:降雨天气将增加下凹桥区周边交叉口整体的延误和排队长度,而相位信号配时优化能有效提高下凹桥区周边交叉口的车辆通行能力,提升交叉口整体服务水平,降低降雨天气对交叉口交通带来的不利影响。 展开更多
关键词 下凹桥区 城市内涝 交通实时控制 积水高度 相位信号配时 仿真模拟
下载PDF
基于双旋转移相变压器的有源配电网多台区同步调压及降损优化策略
7
作者 杨鹏 李铁成 +3 位作者 邵晨 苏灿 王向东 孙广辉 《南方电网技术》 CSCD 北大核心 2024年第2期67-76,共10页
针对高比例可再生能源接入导致的配电网电压越限难题,以及现有调压方法难以兼顾双向调压及降损优化功能的问题,提出了一种基于相量合成原理并具有双向调压、可靠性高、成本低特性的串联型双旋转移相变压器(double rotating phase shift ... 针对高比例可再生能源接入导致的配电网电压越限难题,以及现有调压方法难以兼顾双向调压及降损优化功能的问题,提出了一种基于相量合成原理并具有双向调压、可靠性高、成本低特性的串联型双旋转移相变压器(double rotating phase shift transformer,DRPST)调节装置。首先,介绍了DRPST的拓扑结构、工作原理和等效电路,建立了其简化电路模型,在此基础上对电压越限原因进行了分析,构建了包含DRPST的有源配电网模型。其次,提出了基于DRPST的实时滚动双层优化策略,内层模型以电压偏差及线路损耗最小为目标,利用多目标粒子群算法进行了求解,并通过模糊隶属度函数方法确定内层模型Pareto解集最优折衷解,外层模型根据内层模型的最优折衷解,利用双闭环PI调节实现DRPST输出转子角度的无差控制。最后通过MATLAB/Simulink进行了仿真分析,验证了所提拓扑与控制方法的正确性和有效性。 展开更多
关键词 双旋转移相变压器 电压调节 双层规划 有源配电网
下载PDF
Phase-Division-Based Dynamic Optimization of Linkages for Drawing Servo Presses 被引量:4
8
作者 Zhi-Gang Zhang Li-Ping Wang Yan-Ke Cao 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2017年第6期1426-1437,共12页
Existing linkage-optimization methods are designed for mechanical presses; few can be directly used for servo presses, so development of the servo press is limited. Based on the complementarity of linkage opti- mizati... Existing linkage-optimization methods are designed for mechanical presses; few can be directly used for servo presses, so development of the servo press is limited. Based on the complementarity of linkage opti- mization and motion planning, a phase-division-based linkage-optimization model for a drawing servo press is established. Considering the motion-planning principles of a drawing servo press, and taking account of work rating and efficiency, the constraints of the optimization model are constructed. Linkage is optimized in two modes: use of either constant eccentric speed or constant slide speed in the work segments. The performances of optimized link- ages are compared with those of a mature linkage SL4- 2000A, which is optimized by a traditional method. The results show that the work rating of a drawing servo press equipped with linkages optimized by this new method improved and the root-mean-square torque of the servo motors is reduced by more than 10%. This research pro- vides a promising method for designing energy-saving drawing servo presses with high work ratings. 展开更多
关键词 Drawing servo press Linkage optimization phase-division Motion planning
下载PDF
Optimization of train plan for urban rail transit in the multi-routing mode 被引量:4
9
作者 Lianbo DENG Qiang ZENG +1 位作者 Wei GAO Song BIN 《Journal of Modern Transportation》 2011年第4期233-239,共7页
The train plan of urban rail transit under multi-routing mode can be divided into three parts: train formation, train operation periods and corresponding train counts of each routing in each period. Based on the anal... The train plan of urban rail transit under multi-routing mode can be divided into three parts: train formation, train operation periods and corresponding train counts of each routing in each period. Based on the analysis of passen- ger's general travel expenses and operator's benefits, the constraints and objective functions are defined and the multiobjective optimization model for the train plan of urban rail transit is presented. Factors considered in the multi- objective optimization model include transport capacity, the requirements of traffic organization, corporation benefits, passenger demands, and passenger choice behavior under multi-train-routing mode. According to the characteristics of this model and practical planning experience, a three-phase solution was designed to gradually optimize the train formarion, train counts as well as operation periods. The instance of Changsha Metro Line 2 validates the feasibility and efficiency of this approach. 展开更多
关键词 urban rail transit multi-train-routing train plan multi-objective model three-phase solution method
下载PDF
Minimum-time trajectory planning based on the shortest path for the wheeled mobile robot
10
作者 林风云 吕恬生 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2006年第3期360-363,共4页
The time-optimal trajectory planning is proposed under kinematic and dynamic constraints for a 2-DOF wheeled robot. In order to make full use of the motor’s capacity, we calculate the maximum torque and the minimum t... The time-optimal trajectory planning is proposed under kinematic and dynamic constraints for a 2-DOF wheeled robot. In order to make full use of the motor’s capacity, we calculate the maximum torque and the minimum torque by considering the maximum heat-converted power generated by the DC motor. The shortest path is planned by using the geometric method under kinematic constraints. Under the bound torques, the velocity limits and the maximum acceleration (deceleration) are obtained by combining with the dynamics. We utilize the phase-plane analysis technique to generate the time optimal trajectory based on the shortest path. At last, the computer simulations for our laboratory mobile robot were performed. The simulation results prove the proposed method is simple and effective for practical use. 展开更多
关键词 直流电动机 热分析 路径规划 移动机器人 最短时间控制
下载PDF
车务段集中模式下调度室生产指挥系统的设计与实现
11
作者 方卓禹 马亮 +1 位作者 郭进 张亚东 《铁路计算机应用》 2023年第6期36-41,共6页
针对当前铁路车务段调度室存在的调度管理薄弱、生产作业组织指挥缺少信息化手段等问题,基于C/S架构研发了车务段集中模式下的调度室生产指挥系统。以技术作业图表为核心,根据铁路局集团公司调度所下达的日班计划,辅助调度人员编制阶段... 针对当前铁路车务段调度室存在的调度管理薄弱、生产作业组织指挥缺少信息化手段等问题,基于C/S架构研发了车务段集中模式下的调度室生产指挥系统。以技术作业图表为核心,根据铁路局集团公司调度所下达的日班计划,辅助调度人员编制阶段计划,对车务段管辖范围内货运车站的股道、调车机车等资源集中安排,并对运转、货运等作业集中调度。通过作业进度报点反馈、现车信息实时上传、站存车自动推算、作业指标实时统计、交接班统计分析等功能,实时向铁路局调度所上传站存车、调车机车状态和作业进度等信息,为制定后续日班计划提供支撑。应用表明,该系统能够促进车务段生产指挥的信息化发展,提高车务段生产指挥的管理水平。 展开更多
关键词 车务段 生产指挥 阶段计划 信息系统 技术作业图表
下载PDF
基于WorldView-3卫星带状影像生产地形级地理场景数据 被引量:1
12
作者 刘冬枝 任毅 朱万雄 《测绘通报》 CSCD 北大核心 2023年第9期135-138,共4页
实景三维中国建设要求地方层面生产2 m格网DSM、DEM及优于0.5 m分辨率DOM的地形级地理场景数据。对WorldView-3卫星带状影像数据,采用传统的灰度匹配、特征匹配、变换域法匹配的方法,无法获得足够满足要求的连接点。本文采用基于频率相... 实景三维中国建设要求地方层面生产2 m格网DSM、DEM及优于0.5 m分辨率DOM的地形级地理场景数据。对WorldView-3卫星带状影像数据,采用传统的灰度匹配、特征匹配、变换域法匹配的方法,无法获得足够满足要求的连接点。本文采用基于频率相位匹配辅助的概率松弛控制点匹配方法进行连接点匹配,获得的满足精度要求的连接点数量多且分布均匀,后续生产的DSM、DEM及DOM地形级地理场景数据精度满足要求,为实景三维西藏察隅试点建设顺利开展提供了技术支撑。 展开更多
关键词 WorldView-3卫星带状影像 频率相位匹配 点位规划 概率松弛 地形级地理场景
下载PDF
西安灞渭滨水区域蓝绿体系规划与分步骤建设实践
13
作者 徐琰 王敏 +2 位作者 毛宇帆 陈一辉 张博雅 《中国园林》 CSCD 北大核心 2023年第S02期13-18,共6页
城市蓝绿空间是生态优先战略实施过程中的重要议题,其规划旨在合理构建生态结构与格局,为城市生态保护等提供重要支撑。西安灞渭滨水区域蓝绿体系建设是在中华人民共和国第十四届运动会大事件影响下进行的。赛前建设围绕规划核心区域和... 城市蓝绿空间是生态优先战略实施过程中的重要议题,其规划旨在合理构建生态结构与格局,为城市生态保护等提供重要支撑。西安灞渭滨水区域蓝绿体系建设是在中华人民共和国第十四届运动会大事件影响下进行的。赛前建设围绕规划核心区域和公共空间的环境提升,重点打造集文化体育场馆、城市公园、市民休闲广场于一体的城市新名片;赛后持续完善基础配套设施,建设滨水生态宜居城市。通过分析西安灞渭滨水空间的现状问题、建设目标,总结分阶段实施的要点步骤,以期在生态文明建设的指引下,从多个维度为类似的城市滨水空间环境营造提供借鉴。 展开更多
关键词 风景园林 西安灞渭滨水区域 蓝绿体系 规划与实践 分步骤建设
下载PDF
外包合同视角下的多设备分阶段成组维护策略
14
作者 张馨予 刘勤明 +1 位作者 叶春明 谢世锐 《中国机械工程》 EI CAS CSCD 北大核心 2023年第14期1683-1692,共10页
针对多设备串联生产系统的维护外包问题,提出了分阶段成组维护策略。将第三方维护特征引入的平均故障响应时间以及系统可用度相结合来衡量工厂对维护服务商的满意度。基于满意度分段,构建了可靠度约束下的分段式利润模型。采用多策略融... 针对多设备串联生产系统的维护外包问题,提出了分阶段成组维护策略。将第三方维护特征引入的平均故障响应时间以及系统可用度相结合来衡量工厂对维护服务商的满意度。基于满意度分段,构建了可靠度约束下的分段式利润模型。采用多策略融合的麻雀搜索算法求出不同分阶段策略对应的最优分组及维护方案,并据此制定维修计划以供维护外包合同中的双方参考。算例结果表明,四阶段成组维护策略相较于传统维护模式具有明显优势。 展开更多
关键词 服务外包 分阶段成组维护 串联生产系统 维修计划 麻雀搜索算法
下载PDF
风景里的医养社区——日照市五莲康福家园项目规划设计
15
作者 宦洪桥 宋鹏 《中国医院建筑与装备》 2023年第4期18-20,共3页
基于五莲县的整体意象以及项目的定位、场地特点及功能规划,对医养结合项目——康福家园进行了总体规划及建筑设计,体现了分期实施、依山就势、尺度舒适、传承文脉、内外交融的思路。
关键词 医养结合 规划设计 分期建设 文脉
下载PDF
我国湖泊水质恶化趋势及富营养化控制阶段划分 被引量:35
16
作者 许其功 曹金玲 +4 位作者 高如泰 丁京涛 姜磊 张慧 姜甜甜 《环境科学与技术》 CAS CSCD 北大核心 2011年第11期147-151,共5页
自20世纪70年代末至今30年间,我国的湖泊在人类活动的强烈干扰下,由贫-中营养状态为主逐步向富营养状态转变,富营养化湖泊的数量和面积呈现逐年增加的趋势,尤其是在东部平原湖区和云贵高原湖区,以太湖、巢湖和滇池等三湖为主的富营养化... 自20世纪70年代末至今30年间,我国的湖泊在人类活动的强烈干扰下,由贫-中营养状态为主逐步向富营养状态转变,富营养化湖泊的数量和面积呈现逐年增加的趋势,尤其是在东部平原湖区和云贵高原湖区,以太湖、巢湖和滇池等三湖为主的富营养化问题,更是引起了广泛的关注。伴随着湖泊富营养化的发展,我国在湖泊富营养化的防治上进行了不懈的努力,进入21世纪以来,几次大的蓝藻事件的发生,促使我国的湖泊管理由20世纪80年代以前的开发利用、保护与综合治理过渡到目前的规划防治,使得中国湖泊富营养化的管理和治理进入到一个全新的阶段。 展开更多
关键词 富营养化 控制阶段 规划防治
下载PDF
南水北调东线后续利用黄河输水方案研究
17
作者 苏柳 高涛 《云南水力发电》 2023年第9期313-317,共5页
南水北调东线一期工程于2013年11月15日全线正式通水运行。山东省作为东线一期工程受水区,虽然每年的净供水量在逐年增加,但与规划的山东省净供水量相比,仍有较大差距,工程调水能力未得到完全发挥。2015年淮委会同海委根据水利部的统一... 南水北调东线一期工程于2013年11月15日全线正式通水运行。山东省作为东线一期工程受水区,虽然每年的净供水量在逐年增加,但与规划的山东省净供水量相比,仍有较大差距,工程调水能力未得到完全发挥。2015年淮委会同海委根据水利部的统一部署和安排,共同编制完成了《南水北调东线后续工程规划总体方案》,提出东线二、三期合并实施建设方案。重点研究利用黄河输水方案的线路布局,分析该方案的影响和优缺点,论证方案的技术经济可行性,提出结论和建议。 展开更多
关键词 南水北调东线二期工程 输水方案 输水时间 水资源调度
下载PDF
免疫算法求解编组站阶段计划配流问题研究 被引量:16
18
作者 申永生 何世伟 +1 位作者 王保华 穆美如 《铁道学报》 EI CAS CSCD 北大核心 2009年第4期1-6,共6页
在编制编组站阶段计划时需解决的一个核心问题是确定出发列车的车流来源。本文针对该问题作了深入研究,以解编顺序为优化对象,在考虑解、编调机资源约束的情况下,以在正点出发列车数最大基础上考虑总停留车小时最小的解编顺序为目标建... 在编制编组站阶段计划时需解决的一个核心问题是确定出发列车的车流来源。本文针对该问题作了深入研究,以解编顺序为优化对象,在考虑解、编调机资源约束的情况下,以在正点出发列车数最大基础上考虑总停留车小时最小的解编顺序为目标建立数学模型,并设计了免疫算法中自适应克隆选择算法对其求解,其中抗体评价所需的配流结果通过lingo编程实现。算例证明了算法的有效性,为编组站阶段计划配流智能化提供了较好的解决途径。 展开更多
关键词 阶段计划 解编顺序 简单配流 自适应克隆选择算法
下载PDF
Beyond Defense: Proactive Approaches to Disaster Recovery and Threat Intelligence in Modern Enterprises
19
作者 Meysam Tahmasebi 《Journal of Information Security》 2024年第2期106-133,共28页
As cyber threats keep changing and business environments adapt, a comprehensive approach to disaster recovery involves more than just defensive measures. This research delves deep into the strategies required to respo... As cyber threats keep changing and business environments adapt, a comprehensive approach to disaster recovery involves more than just defensive measures. This research delves deep into the strategies required to respond to threats and anticipate and mitigate them proactively. Beginning with understanding the critical need for a layered defense and the intricacies of the attacker’s journey, the research offers insights into specialized defense techniques, emphasizing the importance of timely and strategic responses during incidents. Risk management is brought to the forefront, underscoring businesses’ need to adopt mature risk assessment practices and understand the potential risk impact areas. Additionally, the value of threat intelligence is explored, shedding light on the importance of active engagement within sharing communities and the vigilant observation of adversary motivations. “Beyond Defense: Proactive Approaches to Disaster Recovery and Threat Intelligence in Modern Enterprises” is a comprehensive guide for organizations aiming to fortify their cybersecurity posture, marrying best practices in proactive and reactive measures in the ever-challenging digital realm. 展开更多
关键词 Advanced Persistent Threats (APT) Attack phases Attack Surface DEFENSE-IN-DEPTH Disaster Recovery (DR) Incident Response plan (IRP) Intrusion Detection Systems (IDS) Intrusion Prevention System (IPS) Key Risk Indicator (KRI) Layered Defense Lockheed Martin Kill Chain Proactive Defense Redundancy Risk Management Threat Intelligence
下载PDF
车站班计划和阶段计划计算机编制方法的研究 被引量:4
20
作者 杜艳平 陈光伟 孙健 《铁路计算机应用》 2004年第7期1-3,共3页
针对现行车站班计划和阶段计划编制方法存在编制时间长、计划不准确、车流推算落后等弊端,提出在车站计算机信息系统中增加“班计划编制模块”和“阶段计划编制模块”,并运用计算机辅助推算车流,以实现车站自动化指挥生产,从而使运输工... 针对现行车站班计划和阶段计划编制方法存在编制时间长、计划不准确、车流推算落后等弊端,提出在车站计算机信息系统中增加“班计划编制模块”和“阶段计划编制模块”,并运用计算机辅助推算车流,以实现车站自动化指挥生产,从而使运输工作有序可控,达到提高运输效率和运输效益的目的。 展开更多
关键词 车站 班计划 阶段计划 车流推算
下载PDF
上一页 1 2 12 下一页 到第
使用帮助 返回顶部