Due to the fluctuation and intermittency of distributed PV generation,battery energy storage is required with higher renewable installation towards carbon neutrality.Thus,the photovoltaic battery(PVB)system receives i...Due to the fluctuation and intermittency of distributed PV generation,battery energy storage is required with higher renewable installation towards carbon neutrality.Thus,the photovoltaic battery(PVB)system receives increasing attention.This study provides a critical review on PVB system design optimization,including system component sizing and strategy improvement studies,from mathematical modeling,evaluation system establish-ment to feasibility and optimization studies.Several PVB simulation software packages are compared and eval-uated,and acknowledged system models are presented.The evaluation indicators are summarized from various aspects with cases of various evaluation systems combining different indicators or using the Pareto front for multi-criteria system designing.The PVB system feasibility study is analyzed from system configuration varia-tion,critical technical and economic parameter analyses,rule-based operation strategies to future expectations like large-scale energy storage profitability,grid parity,and energy community trading platform.The targets,methods,tariffand time resolution influences,and PVB system capacity optimization design recommendations are critically discussed.The research directions for system operation development and future expectations are analyzed from system feasibility,flexibility to resilience.The co-planning of PVB system capacity and operation design optimization makes the problem complicated,leading to relatively short time resolution but more flexi-bility to system operation strategy.This study could provide guidance and references to distributed PVB system future design and optimization studies.展开更多
Small-hydro power station is often used in remote areas beside a river,but it doesn't match electricity demand so well,especially in dry seasons. A photovoltaic (PV) system with battery is a suitable option to com...Small-hydro power station is often used in remote areas beside a river,but it doesn't match electricity demand so well,especially in dry seasons. A photovoltaic (PV) system with battery is a suitable option to complement the electricity gap. In this paper,a new structure of megawatt-class PV system integrating battery at DC-bus (DC: direct current) is proposed to be used in hydro/PV hybrid power system,and 4 main designing considerations and several key equipments are discussed. In 2011,a 2 MWp PV station with the proposed structure was built up in Yushu,China. From stability analysis,the station shows a strong stability under load cut-in/off and solar irradiance's fluctuation.展开更多
基金support from the Hong Kong PhD Fellowship Scheme (HKPFS)and the Research Impact Fund (No.:R5007-18)of the Research Grant Council of the Hong Kong SAR Governmentthe National Key R&D Pro-gram of China through Grant 2022YFB4201003&2022YFB4200902.
文摘Due to the fluctuation and intermittency of distributed PV generation,battery energy storage is required with higher renewable installation towards carbon neutrality.Thus,the photovoltaic battery(PVB)system receives increasing attention.This study provides a critical review on PVB system design optimization,including system component sizing and strategy improvement studies,from mathematical modeling,evaluation system establish-ment to feasibility and optimization studies.Several PVB simulation software packages are compared and eval-uated,and acknowledged system models are presented.The evaluation indicators are summarized from various aspects with cases of various evaluation systems combining different indicators or using the Pareto front for multi-criteria system designing.The PVB system feasibility study is analyzed from system configuration varia-tion,critical technical and economic parameter analyses,rule-based operation strategies to future expectations like large-scale energy storage profitability,grid parity,and energy community trading platform.The targets,methods,tariffand time resolution influences,and PVB system capacity optimization design recommendations are critically discussed.The research directions for system operation development and future expectations are analyzed from system feasibility,flexibility to resilience.The co-planning of PVB system capacity and operation design optimization makes the problem complicated,leading to relatively short time resolution but more flexi-bility to system operation strategy.This study could provide guidance and references to distributed PVB system future design and optimization studies.
基金Chinese Academy of Science (No.KGCX2- YW- 366)Ministry of Science and Technology(No. 2011AA05A106)
文摘Small-hydro power station is often used in remote areas beside a river,but it doesn't match electricity demand so well,especially in dry seasons. A photovoltaic (PV) system with battery is a suitable option to complement the electricity gap. In this paper,a new structure of megawatt-class PV system integrating battery at DC-bus (DC: direct current) is proposed to be used in hydro/PV hybrid power system,and 4 main designing considerations and several key equipments are discussed. In 2011,a 2 MWp PV station with the proposed structure was built up in Yushu,China. From stability analysis,the station shows a strong stability under load cut-in/off and solar irradiance's fluctuation.