期刊文献+
共找到29,809篇文章
< 1 2 250 >
每页显示 20 50 100
Construction Safety Management of Mechanical and Electrical Installation Projects
1
作者 Honglou Chi 《Journal of Architectural Research and Development》 2024年第2期50-54,共5页
Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of exp... Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of expertise required and the potential risks involved,it is crucial to emphasize safety management during construction.This paper delves into the significance of construction safety management for electromechanical installation projects,identifies common problems encountered during construction,and proposes solutions.This analysis aims to provide relevant personnel with essential guidance and references for managing electromechanical installation projects safely. 展开更多
关键词 Construction safety Mechanical and electrical installation Installation engineering Engineering projects Safety management
下载PDF
Whole-Process Project Cost Management Based on Building Information Modeling (BIM)
2
作者 Liping Yan 《Journal of Architectural Research and Development》 2024年第4期57-62,共6页
The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the a... The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the application of BIM technology.This paper summarizes and analyzes the whole-process project cost management based on BIM,aiming to explore its application and development prospects in the construction industry.Firstly,this paper introduces the role and advantages of BIM technology in engineering cost management,including information integration,data sharing,and collaborative work.Secondly,the paper analyzes the key technologies and methods of the whole-process project cost management based on BIM,including model construction,data management,and cost control.In addition,the paper also discusses the challenges and limitations of the whole-process BIM project cost management,such as the inconsistency of technical standards,personnel training,and consciousness change.Finally,the paper summarizes the advantages and development prospects of the whole-process project cost management based on BIM and puts forward the direction and suggestions for future research.Through the research of this paper,it can provide a reference for construction cost management and promote innovation and development in the construction industry. 展开更多
关键词 Building Information Modeling(BIM) project cost management Data integration Information sharing Cost control
下载PDF
Key Points and Difficulties in the Management of a New Guangzhou 12th People’s Hospital Branch
3
作者 Liya Fang 《Journal of World Architecture》 2024年第3期63-71,共9页
During the 13th Five-Year Plan period,to improve medical and health services,the Guangzhou Municipal government invested billions in medical construction.During that time,Guangzhou was renewing its approval procedures... During the 13th Five-Year Plan period,to improve medical and health services,the Guangzhou Municipal government invested billions in medical construction.During that time,Guangzhou was renewing its approval procedures for construction projects,and the COVID-19 outbreak changed the requirements of hospital construction.In addition to focusing more on spatial planning and layout,the integration of specialized departments,large-scale medical equipment,and numerous intelligent systems increased the complexity of hospital construction projects.The success of these projects often hinges on the quality of the management team.If a hospital construction project manager lacks experience and an understanding of the project’s key aspects,they may struggle with organization,management,and problem-solving,leading to rework,resource waste,and delays.This paper uses the construction of a new Guangzhou 12th People’s Hospital branch as an example to describe the key points and difficulties in each stage of project construction and proposes solutions for the management of similar projects in the future. 展开更多
关键词 Hospital construction project project management management essentials
下载PDF
Integrating Project Management, Software Development, and Knowledge Management Models: A Case Study in a Public ICT Services Organization
4
作者 Jorge Luiz dos Santos Renelson Ribeiro Sampaio 《Social Networking》 2023年第1期1-27,共27页
In project-based organizations knowledge is a critical resource used to develop and deliver products and services with a high level of quality. Therefore, a systematic and sustainable process is necessary to coordinat... In project-based organizations knowledge is a critical resource used to develop and deliver products and services with a high level of quality. Therefore, a systematic and sustainable process is necessary to coordinate knowledge management, project management and product lifecycle. This scenario predominates in companies focused on the creation and maintenance of information systems. This article presents an exploratory study based on a framework that integrates cognitive, managerial, and operational processes in a public Brazilian organization that provides services in the area of information and communications technology, focusing on the construction and maintenance of information systems. Those processes are operationalized by three management models considering knowledge, project, and software development processes. Our proposal aims to understand the relationships between those three management models and their influence on the software development process in the organization under study. Our premise is based on the principle that cognitive management, project management, and software development management must be integrated to fulfill the demands of product development and service provision. The research data was composed of registers of working hours spent on software development and maintenance projects involving 244 people allocated to 5064 projects in the period from 2007 to 2013. The study resulted in the identification of the relationships among the three management models adopted by the organization, with emphasis on knowledge management activities, which were not directly identified, making it difficult to account for and measure them. We established a set of activities connected to each one of the knowledge management model phases. Since those activities were not visible before, our approach contributed to build a systematic process to register and relate activities linked to the dimensions of cognitive processes, project management, and software construction. 展开更多
关键词 Knowledge management Knowledge Sharing Integrated management project Teams Software Development
下载PDF
How Does Robotics Process Automation (RPA) Affect Project Management Practices
5
作者 Mounir El Khatib Amna Almarri +1 位作者 Asma Almemari Aysha Alqassimi 《Advances in Internet of Things》 2023年第2期13-30,共18页
The main purpose of this literature review is to understand the effectiveness and impacts of Robotics Process Automation (RPA) on the practices of Project Management (PM). For attaining the purposes of the research st... The main purpose of this literature review is to understand the effectiveness and impacts of Robotics Process Automation (RPA) on the practices of Project Management (PM). For attaining the purposes of the research study, an extensive literature review was conducted, which helped in gaining a theoretical understanding. These findings were then justified with the help of current and relevant secondary sources in the analysis section. The findings suggested that RPA is quite advantageous for implementing in varied aspects of a business, especially in the field of project management. However, it can pose several challenges, which need to be taken into due consideration by the organizations during execution such as the capabilities of the employees and the abilities of the existing systems to incorporate automation, among others. It was ultimately concluded that RPA is highly advantageous for project management teams but its effective implementation is the key to success. 展开更多
关键词 ROBOTICS Robotics Process Automation project management PLATFORMS
下载PDF
Evaluating the Impact of Workshop Management on the Progress of Road Construction Projects(Case Study:Road Construction Projects of Tehran Province)
6
作者 Morteza Modarresi Fatemeh Mousavi 《Journal of Management Science & Engineering Research》 2023年第1期49-59,共11页
Construction projects,including road construction,are very important.Therefore,a lot of money is spent on these projects every year.So,the lack of proper planning will increase the cost and cause irreparable damage to... Construction projects,including road construction,are very important.Therefore,a lot of money is spent on these projects every year.So,the lack of proper planning will increase the cost and cause irreparable damage to the country.The role of workshop management is one of the most important factors in increasing the cost of these types of projects.Generally,workshop management plays a very important role in improving the quality and quantity of projects and has an important place in the project implementation process.Therefore,this study evaluated the impact of workshop management on the progress of road construction projects on a case-by-case basis in road construction projects in Tehran province.According to the purpose of the research,this study was a descriptive-survey type.In addition,the tool used in this research was a questionnaire.The statistical population of this research included all experts and specialists in road construction projects,among whom 65 people were selected by snowball method.Then the collected data were analyzed using SPSS software.The results of this study showed that the management of the workshop and its role in the control and implementation of projects is a complex process,which can be implemented at high levels and effectively by combining scientific and experimental training.And a very important point in the discussion of workshop management is applying scientific management to the use of valuable experiences from others.Because management knowledge not only does not negate the use of these experiences,but also emphasizes the necessity of using them.In other words,improving the knowledge of workshop management is one of the requirements for the implementation of value engineering in construction projects,especially road construction,and it is very important. 展开更多
关键词 Construction projects Workshop management SNOWBALL Road construction
下载PDF
The Importance of Construction Project Archives Management and Ways to Strengthen it
7
作者 Meicong Tao 《Journal of Architectural Research and Development》 2023年第6期43-48,共6页
China’s economy has been developing rapidly in recent years,leading to an acceleration of urbanization,which in turn caused the number of construction projects in various regions to increase significantly.Archives ar... China’s economy has been developing rapidly in recent years,leading to an acceleration of urbanization,which in turn caused the number of construction projects in various regions to increase significantly.Archives are important information for construction projects.The quality of archives management can have a great impact on the quality and economic benefits of construction projects.For this reason,it is necessary to increase the emphasis on archives management of construction projects and take effective management measures.This article introduces the concept of construction project archives,highlights the significance of effective management in construction project archives,and examines prevalent issues along with practical measures to enhance construction project archives management,with the goal of offering valuable insights for archive managers. 展开更多
关键词 Construction projects Archives management Strengthening measures
下载PDF
The Planning, Organization and Management of Post-disaster Reconstruction of the Lushan Earthquake Based on the Local as the Main Body 被引量:3
8
作者 Zeng Fan Qiu Jian Han Xiao 《Earthquake Research in China》 CSCD 2016年第1期131-144,共14页
A new organization and management mechanism with the local government as the main body was created during the post-disaster reconstruction of the "4. 20 " Lushan earthquake,in which the experiences and lesso... A new organization and management mechanism with the local government as the main body was created during the post-disaster reconstruction of the "4. 20 " Lushan earthquake,in which the experiences and lessons were drawn from the "5. 12"Wenchuan earthquake. Correspondingly, the local government conducted an exploration of the organization and management mode in the field of planning and construction. The effective experiences have been accumulated, including working out a full coverage planning,taking the leading part in the urban-rural planning,and exercising whole space control over the disaster area. An innovation management mode named as "Five Generals Pattern"was implemented in the construction projects. In view that the rural housing reconstruction was a weak link, a new approach to improving the construction management was investigated,by means of strengthening on-site supervision,establishing a technical platform,and bolstering public participation. 展开更多
关键词 PLANNING organization and management Lushan earthquake Wenchuanearthquake post-disaster reconstruction The local as the main body FiveGenerals Pattern
下载PDF
Impacts of Bad Weathers in Growing Season on Apples and Post-disaster Management Measures
9
作者 Xueying LI Jie HAO +5 位作者 Jianzhong FENG Xinmin YAN Xian'ge WANG Wenzhang JI Xuehua LI Xiangmin SUO 《Asian Agricultural Research》 2018年第12期52-54,共3页
Apple cultivation has special requirements for climatic conditions. The period from May to August is a key period for apple growth.During this period,extreme weather occurs frequently,such as extreme high temperature,... Apple cultivation has special requirements for climatic conditions. The period from May to August is a key period for apple growth.During this period,extreme weather occurs frequently,such as extreme high temperature,strong wind,hail,and floods. This paper introduced these extreme weathers and came up with some corresponding management measures. 展开更多
关键词 BAD WEATHER APPLE post-disaster management
下载PDF
Project Management in College Students' Interpreting Practice 被引量:1
10
作者 孙瑾 《海外英语》 2019年第3期173-174,共2页
Nowadays, college students, as a main part of interpreters, have engaged more and more in interpreting practices in formsof foreign guests’reception, telephone interpreting, escort interpreting and consecutive interp... Nowadays, college students, as a main part of interpreters, have engaged more and more in interpreting practices in formsof foreign guests’reception, telephone interpreting, escort interpreting and consecutive interpreting, etc. However, these practicesstill remain a lot of problems, such as low quality, disordered management and improper resource utilization, which are in urgentneed of systematic interpreting project management. Combined with the features of students’interpreting practice, students-oriented interpreting project can better manage these problems above and build a standardized and effective language servicegroup. After summarizing the features of students’interpreting practice, this paper will focus on the concrete application of interpreting project management in college students’interpreting practice. Furthermore, this paper will also provide specific work flowand methods in students-oriented interpreting project. 展开更多
关键词 INTERPRETING project management INTERPRETING project management students’interpreting practice students-oriented INTERPRETING project project managER CONSULTANT INTERPRETER
下载PDF
Reliability model of organization management chain of South-to-North Water Diversion Project during construction period 被引量:3
11
作者 Feng Jingchun Zhou Yang +2 位作者 Hong Yuzhen Zhao Shixin Ren Xiaoqiang 《Water Science and Engineering》 EI CAS 2008年第4期107-113,共7页
In order to analyze the indispensability of the organization management chain of the South-to-North Water Diversion Project (SNWDP), two basic forms (series connection state and mixed state of both series connectio... In order to analyze the indispensability of the organization management chain of the South-to-North Water Diversion Project (SNWDP), two basic forms (series connection state and mixed state of both series connection and parallel connection) of the organization management chain can be abstracted. The indispensability of each form has been studied and is described in this paper. Through analysis of the reliability of the two basic forms, reliability models of the organization management chain in the series connection state and the mixed state of both series connection and parallel connection have been set up. 展开更多
关键词 South-to-North Water Diversion project reliability model management chain parallel connection series connection
下载PDF
θ-improved limited tolerance relation model of incomplete information system for evaluation of water conservancy project management modernization 被引量:4
12
作者 Yu-qin GAO Guo-hua FANG Ya-qin LIU 《Water Science and Engineering》 EI CAS CSCD 2013年第4期469-477,共9页
The modernization of water conservancy project management is a complicated engineering system involving a management system, a management method, management personnel, the exertion of social, economic, and ecological ... The modernization of water conservancy project management is a complicated engineering system involving a management system, a management method, management personnel, the exertion of social, economic, and ecological effects, and so on. However, indices for evaluating the modernization of water conservancy project management are usually unobtainable in practical applications. Conducting appropriate extension of the classical rough set theory and then applying it to an incomplete information system are the key to the application of the rough set theory Based on analysis of some extended rough set models in incomplete information systems, a rough set model based on the θ-improved limited tolerance relation is put forward. At the same time, upper approximation and lower approximation are defined under this improved relation. According to the evaluation index system and management practices, the threshold for θ is defined. An example study indicates the practicability and maneuverability of the model. 展开更多
关键词 Key words: modernization of water conservancy project management O-improved limitedtolerance relation model upper and lower approximations threshold
下载PDF
Assessment of Diversity, Distribution, Conservation Status and Preparation of Management Plan for Medicinal Plants in the Catchment Area of Parbati Hydroelectric Project Stage-Ⅲ in Northwestern Himalaya 被引量:4
13
作者 S.S. Samant Jitendra S. Butola Aman Sharma 《Journal of Mountain Science》 SCIE CSCD 2007年第1期34-56,共23页
The developmental activities, particularly the construction of hydroelectric projects are causing a great loss of biodiversity in the Indian Himalayan Region. The Himaehal Pradesh, a part of IHR is well known for the ... The developmental activities, particularly the construction of hydroelectric projects are causing a great loss of biodiversity in the Indian Himalayan Region. The Himaehal Pradesh, a part of IHR is well known for the development of hydroelectric projects. The Parbati H.E. Project is amongst the major projects of the State. The different stages of the project are all causing loss of biodiversity of the area. Stage Ⅲ of the Parbati H.E. Project is a run of the river scheme on the Sainj River downstream of Power House of Parbati H.E. Project Stage Ⅱ. The project shall utilize regulated discharge of Parbati H.E. Project Stage Ⅱ and inflow of River Sainj for power generation, and has been contemplated as a peaking station operating in tandem with Stage Ⅱ. The present study has been undertaken to see the impact of hydroelectric project on the biodiversity, particularly on medicinal plants. A total of 104 species of medicinal plants, belonging to different life forms, i.e., trees (23 spp.), shrubs (22 spp.), herbs (57 spp.) and ferns (2 spp.) were recorded. The species have been analyzed and studied for their distribution, classification, altitudinal zones, part (s) used, indigenous uses, nativity, endemism and rarity.Different parts of these species, such as whole plants, roots (including rhizomes and tubers), leaves, flowers, fruits, seeds, stems, barks, spikes, nuts and insect galls are used by the inhabitants for curing various diseases and ailments. 3o species are native to the Himalayan region, 9 species native to the Himalayan region and adjacent countries also and 65 species are non-natives. 9 species are near endemics. Considering the whole Himalaya as a biogeographie unit (sensu lato), the near endemics are endemic to the Himalaya. Among these species, Zanthoxylum armature is categorized as Endangered and Valeriana wallichii as Vulnerable. Hedychium spicatum, Rhus javanica, Berberis lycium, Thalictrum foliolossum, Salvia lanata, Rubia cordifolia and Bergenia ligulata may be considered as threatened species due to their over exploitation for trade. 90 species are propagated by seeds, 8 species by seeds and rhizomes/roots/tubers, 4 species by seeds and cuttings, and 2 species by sori. A management plan for the cultivation and conservation of the medicinal plants in the dam submergence area, and the commercially viable medicinal plants with high value in the catchment area is suggested. 展开更多
关键词 Hydroelectric project dam submergence area management plan medicinal plant DIVERSITY native endemic ENDANGERED conservation status indigenous uses Indian Himalaya
下载PDF
The practice of project construction and management of Three Gorges ship lock 被引量:2
14
作者 Fan Qixiang Yang Zongli Liu Gang 《Engineering Sciences》 EI 2011年第3期82-87,共6页
The double-line five-step ship-lock of Three Gorges Project (TGP) is an extra-large navigation structure with the maximum design total head and single-step delivery head in the world and complicated technical problems... The double-line five-step ship-lock of Three Gorges Project (TGP) is an extra-large navigation structure with the maximum design total head and single-step delivery head in the world and complicated technical problems.The shiplock is a challenging and world-class project integrating the advanced techniques and equipment,the up-to-date technologies and materials,as well as the advanced project management.Through 17-year construction and 9-year operation of the ship-lock,various difficulties in design,construction,equipment manufacturing and installation as well as system debugging have been overcome effectively.The project management ideas,management system,management methods,technological innovation and team building are summarized according to the management practice of the second stage main work of Three Gorges ship-lock. 展开更多
关键词 project management Three Gorges project ship-lock
下载PDF
Integrated Control Model for Time and Cost Risk in Project Management
15
作者 程铁信 张伟波 张勇 《Transactions of Tianjin University》 EI CAS 2002年第2期99-105,共7页
Time, cost and quality are the three main targets to be controled in project management. However, the control and management of time and cost risk are usually carried out respectively, which will bring such problems a... Time, cost and quality are the three main targets to be controled in project management. However, the control and management of time and cost risk are usually carried out respectively, which will bring such problems as the delay of schedule by reason of the impracticability of cash flow, the money difficulties caused by delay of schedule and so on. In order to control and manage the time and cost risk effectively and simultaneously, a time & cost risk control model based on schedule programme was established with the use of the quantitativemodels of BCWS, BCWP and ACWP in this paper. Subsequently, the analysis of variance for the whole project and the single activity was introduced on the basis of BCWS, BCWP and ACWP so that the project can be controlled and managed effectively. Furthermore, an example given behind in detail expressly illustrated that the model set up above was practicableto project management. However, the method of optimizing the cash flow based on time and cost risk to obtain BCWS should be considered properlyand carefully with respect to the different circumstances of the project, and an efficient and adequate interval report system should be set up on the site of the project. 展开更多
关键词 project management budgeted cost of work performed (BCWP) actual cost work performed (ACWP) budget cost of workscheduled (BCWS)
下载PDF
Control and Management of Construction Project Cost 被引量:1
16
作者 ZHU Lili 《Journal of Landscape Research》 2016年第4期7-8,共2页
Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of proje... Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of project cost is the principle that building units must obey in the whole process of project,particularly in the construction stage,so it is extremely important to control and manage the project cost.This paper first analyzed possible causes for the unreasonable cost of construction projects,and put forward pertinent strategies for the control and management of construction project cost. 展开更多
关键词 Construction project Construction stage project cost Control and management
下载PDF
Research on the Teaching Mode of Entrepreneurial Project Management General Courses 被引量:4
17
作者 Lai Yifei Zhao Xiaoqian Zhang Wan 《教育研究前沿(中英文版)》 2019年第2期42-47,共6页
Under the background of "the Belt and Road" and "Internet +", innovation and Entrepreneurial education in colleges and universities has been pushed to the focus of education. The opening of the cou... Under the background of "the Belt and Road" and "Internet +", innovation and Entrepreneurial education in colleges and universities has been pushed to the focus of education. The opening of the course 3.0 "Entrepreneurial Project Management" in General Studies course of Wuhan University is an innovative education mode under the requirements of the background of the times. The development of network information technology in the new era has brought about the subversion and reform of teaching mode. This paper first analyzes the problems and present situation of the teaching of Entrepreneurial project management, introduces the characteristics of the teaching mode, and makes effective research and exploration on the three teaching modes of Entrepreneurial project management, in order to provide reference for the curriculum teaching reform and to promote the teaching effect of innovation and Entrepreneurial courses in colleges and universities. 展开更多
关键词 GENERAL COURSE ENTREPRENEURIAL project management TEACHING MODE
下载PDF
A Comparative Analysis of RAD and Agile Technique for Management of Computing Graduation Projects 被引量:1
18
作者 Fazal Qudus Khan Saim Rasheed +2 位作者 Maged Alsheshtawi Tarig Mohamed Ahmed Sadeeq Jan 《Computers, Materials & Continua》 SCIE EI 2020年第8期777-796,共20页
Computing students face the problem with time and quality of the work while managing their graduation/senior projects.Rapid Application Development(RAD)model is based on continual user involvement for the process of r... Computing students face the problem with time and quality of the work while managing their graduation/senior projects.Rapid Application Development(RAD)model is based on continual user involvement for the process of requirement gathering via prototyping.After each iteration,the developers can validate the requirements that are completed in the iteration.Managing a project with RAD is easier but not flexible.On the other hand,Agile project management techniques focus on flexibility,agility,teamwork and quality based on user stories.Continual user involvement is avoided,which requires extensive maintenance time for fixing iteration and release of the story points.This also makes it necessary to provide onsite training to the users of the application.This research provides the pros and cons of RAD and Agile project management techniques,to help students in deciding the best approach for managing their graduation projects.For the evaluation of these techniques,similar case studies were given to the senior project students(having similar CGPAs)for building similar functionality-based applications.The two projects“Life Organizer”developed and managed using RAD and“Smart Patient Assistant(SPA)”developed and managed through Agile methodology were evaluated against the quality assurance criteria for senior projects.The study found that the project developed with RAD methodology performed 13.33%better in providing extensive and elaborated documentation than the students following the Agile technique.On the other hand,SPA-Agile based project,due to teamwork had 2.5%better implementation than Life Organizer-RAD based project. 展开更多
关键词 Rapid application development PROTOTYPING agile project management smart application development graduation project THESIS
下载PDF
Optimizing Bidders Selection of Multi-Round Procurement Problem in Software Project Management Using Parallel Max-Min Ant System Algorithm 被引量:1
19
作者 Dac-Nhuong Le Gia Nhu Nguyen +3 位作者 arish Garg Quyet-Thang Huynh Trinh Ngoc Bao Nguyen Ngoc Tuan 《Computers, Materials & Continua》 SCIE EI 2021年第1期993-1010,共18页
This paper presents a Game-theoretic optimization via Parallel Min-Max Ant System(PMMAS)algorithm is used in practice to determine the Nash equilibrium value to resolve the confusion in choosing appropriate bidders of... This paper presents a Game-theoretic optimization via Parallel Min-Max Ant System(PMMAS)algorithm is used in practice to determine the Nash equilibrium value to resolve the confusion in choosing appropriate bidders of multi-round procurement problem in software project management.To this end,we introduce an approach that proposes:(i)A Game-theoretic model of multiround procurement problem(ii)A Nash equilibrium strategy corresponds to multi-round strategy bid(iii)An application of PSO for the determination of global Nash equilibrium.The balance point in Nash Equilibrium can help to maintain a sustainable structure not only in terms of project management but also in terms of future cooperation.As an alternative of procuring entities subjectively,a methodology to support decision making has been studied using Nash equilibrium to create a balance point on benefit in procurement where buyers and suppliers need multiple rounds of bidding.Our goal focus on the balance point in Nash Equilibrium to optimizing bidder selection in multi-round procurement which is the most beneficial for both investors and selected tenderers.Our PMMAS algorithm is implemented based on MPI(message passing interface)to find the approximate optimal solution for the question of how to choose bidders and ensure a path for a win-win relationship of all participants in the procurement process.We also evaluate the speedup ratio and parallel efficiency between our algorithm and other proposed algorithms.As the experiment results,the high feasibility and effectiveness of the PMMAS algorithm are verified. 展开更多
关键词 Parallel min-max ant system multi-objective multi-round procurement software project management project conflicts Nash equilibrium game theory MPI
下载PDF
A Review on the Role of Risk Management (RM) and Value Engineering (VE) Tools for Project Successful Delivery 被引量:1
20
作者 Elysé Masengesho Ji Wei +1 位作者 Nadine Umubyeyi Rosette Niyirora 《World Journal of Engineering and Technology》 2021年第1期109-127,共19页
Both in developed and in developing countries, the construction industry is regarded as an economic investment activity without forgetting its significant relationship with national economic development due to its gre... Both in developed and in developing countries, the construction industry is regarded as an economic investment activity without forgetting its significant relationship with national economic development due to its great contributions to the national gross domestic product (GDP) of the country. Concerning construction processes, both risk management (RM) and value engineering (VE) techniques have commonalities from the beginning up to the completion of the project due to enhancing the project value/quality, meeting the project deadline, and reducing overall project cost. VE includes resolving the uncertainty of project objectives and ensuring that the project is delivered in a value for money way. The key point of RM is to solve the uncertainty of the project itself and its results to ensure that the specifications are achieved within the prescribed time, cost, and quality constraints. This review work is comparatively and collectively focus</span><span style="font-family:Verdana;">ed</span><span style="font-family:Verdana;"> on assessing the role of RM and VE tools for project successful delivery. It studies the points of difference and common features of the two aspects in terms of construction project delivery. So, this study concluded that in construction RM tool cannot be the chief aim of the all parties involved in the project execution because sometimes it produces itself negative results and reduces project management success. Therefore, RM needs a strong combination with VE due to the dependence of the target in identifying and assessing risks by considering the highest performance and lowest cost. The integration of RM and VE combination in a single study would avoid duplication of work and deliver better value for money thereby leading to better project outcomes. 展开更多
关键词 managing projects Risk management Value Engineering Proper project Delivery
下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部