This paper introduces how Longyuan Power Group Company successfully carried out foreign debt financing for Jiangsu's power projects through its overseas financing window-Xiongya (Virgin) Co. Ltd. The entire proces...This paper introduces how Longyuan Power Group Company successfully carried out foreign debt financing for Jiangsu's power projects through its overseas financing window-Xiongya (Virgin) Co. Ltd. The entire process of raising funds is revealed with regard to employment of foreign debt financing, selection of funded projects, preparation of project and financing documents, credit rating, roadshow, line of credit, and financing experiences.展开更多
The construction of wind power project is conducive to saving energy,reducing emissions and regulating energy structure. But it inevitably causes some impacts on the environment in the construction process. Because th...The construction of wind power project is conducive to saving energy,reducing emissions and regulating energy structure. But it inevitably causes some impacts on the environment in the construction process. Because that the height of wind power generator generally exceeds 100 m,and visual range in plain region is farther,it is necessary to scientifically and rationally evaluate and analyze landscape visual environment impact of wind power generator in plain region. One wind power farm project of Zhanjiang is located in typical plain region of Guangdong coast. Referring to traditional analytic method of landscape visual impact and comparing with actual situation for the same kind of project in the region,results show that it is " extremely sensitive" area at 0- 2. 5 km from wind power generator, " very sensitive" area at 2. 5- 5. 0 km, " sensitive" area at 5- 10 km, "generally sensitive" area at 10- 20 km,and non-sensitive area outside 20 km.展开更多
Two agreements to provide guarantees and insurance for an $80-million export buyers’ credit to a Pakistani thermal power project were signed on August in Beijing. The agreements were reached between the People’s Ins...Two agreements to provide guarantees and insurance for an $80-million export buyers’ credit to a Pakistani thermal power project were signed on August in Beijing. The agreements were reached between the People’s Insurance (Property) Co Ltd (PICC Property), Bank of China and the Harbin Power Engineering Co Ltd. The UCH power project of Pakistan, which will cost $630 million and have a 586 MW capacity, is one of Pakistan’s first batch of non-governmental power projects. It will be built in Pakistan by the General Electric International Operations Co Inc of the United States and the Harbin Power Engineering Co Ltd. The US firm展开更多
On April 25, the Hainan Changjiang nuclear power project, jointly invested by China National Nuclear Corporation (CNNC) and China Huaneng Group with 51% and 49% shares, respectively, formally
At the end of September, the approach way and linkage roads of Pengze Nuclear Power Project, a project developed by China Power Investment Corporation in Jiangxi Province, were all linked up, laying a solid foundation...At the end of September, the approach way and linkage roads of Pengze Nuclear Power Project, a project developed by China Power Investment Corporation in Jiangxi Province, were all linked up, laying a solid foundation for the construction of the project.展开更多
The general contracts of Fuqing and Fangjiashannuclear power projects affiliated to CNNC were signedon April 30th. It is the first time for CNNC to developnuclear power projects by EPC contracts includingdesign, purch...The general contracts of Fuqing and Fangjiashannuclear power projects affiliated to CNNC were signedon April 30th. It is the first time for CNNC to developnuclear power projects by EPC contracts includingdesign, purchasing and construction.Fuqing nuclear power project is located in展开更多
Power grid construction projects are distinguished by their wide variety,high investment,long payback period,and close relation to national development and human welfare.To improve the investment accuracy in such proj...Power grid construction projects are distinguished by their wide variety,high investment,long payback period,and close relation to national development and human welfare.To improve the investment accuracy in such projects and effectively prevent investment risks,this paper proposes an investment optimization decision-making method for multiple power grid construction projects under a certain investment scale.Firstly,an in-depth analysis of the characteristics and development requirements of China’s power grid projects was performed.Thereafter,the time sequence and holographic method was adopted to conduct multi-dimensional,multi-perspective risk assessment of different parts of power grid projects,and a holographic risk assessment index system was developed.Moreover,an investment decision model considering the comprehensive risk based on combination weighting was developed according to the output and input of power grid construction projects.A new combination weighting optimization method that takes into account the investment willingness of enterprises was designed to improve the current weighting evaluation methods.Finally,the validity and applicability of the proposed evaluation method were verified by case examples.展开更多
文摘This paper introduces how Longyuan Power Group Company successfully carried out foreign debt financing for Jiangsu's power projects through its overseas financing window-Xiongya (Virgin) Co. Ltd. The entire process of raising funds is revealed with regard to employment of foreign debt financing, selection of funded projects, preparation of project and financing documents, credit rating, roadshow, line of credit, and financing experiences.
文摘The construction of wind power project is conducive to saving energy,reducing emissions and regulating energy structure. But it inevitably causes some impacts on the environment in the construction process. Because that the height of wind power generator generally exceeds 100 m,and visual range in plain region is farther,it is necessary to scientifically and rationally evaluate and analyze landscape visual environment impact of wind power generator in plain region. One wind power farm project of Zhanjiang is located in typical plain region of Guangdong coast. Referring to traditional analytic method of landscape visual impact and comparing with actual situation for the same kind of project in the region,results show that it is " extremely sensitive" area at 0- 2. 5 km from wind power generator, " very sensitive" area at 2. 5- 5. 0 km, " sensitive" area at 5- 10 km, "generally sensitive" area at 10- 20 km,and non-sensitive area outside 20 km.
文摘Two agreements to provide guarantees and insurance for an $80-million export buyers’ credit to a Pakistani thermal power project were signed on August in Beijing. The agreements were reached between the People’s Insurance (Property) Co Ltd (PICC Property), Bank of China and the Harbin Power Engineering Co Ltd. The UCH power project of Pakistan, which will cost $630 million and have a 586 MW capacity, is one of Pakistan’s first batch of non-governmental power projects. It will be built in Pakistan by the General Electric International Operations Co Inc of the United States and the Harbin Power Engineering Co Ltd. The US firm
文摘On April 25, the Hainan Changjiang nuclear power project, jointly invested by China National Nuclear Corporation (CNNC) and China Huaneng Group with 51% and 49% shares, respectively, formally
文摘At the end of September, the approach way and linkage roads of Pengze Nuclear Power Project, a project developed by China Power Investment Corporation in Jiangxi Province, were all linked up, laying a solid foundation for the construction of the project.
文摘The general contracts of Fuqing and Fangjiashannuclear power projects affiliated to CNNC were signedon April 30th. It is the first time for CNNC to developnuclear power projects by EPC contracts includingdesign, purchasing and construction.Fuqing nuclear power project is located in
基金supported by the State Grid Science and Technology Project (SGTYHT/16-JS-198)
文摘Power grid construction projects are distinguished by their wide variety,high investment,long payback period,and close relation to national development and human welfare.To improve the investment accuracy in such projects and effectively prevent investment risks,this paper proposes an investment optimization decision-making method for multiple power grid construction projects under a certain investment scale.Firstly,an in-depth analysis of the characteristics and development requirements of China’s power grid projects was performed.Thereafter,the time sequence and holographic method was adopted to conduct multi-dimensional,multi-perspective risk assessment of different parts of power grid projects,and a holographic risk assessment index system was developed.Moreover,an investment decision model considering the comprehensive risk based on combination weighting was developed according to the output and input of power grid construction projects.A new combination weighting optimization method that takes into account the investment willingness of enterprises was designed to improve the current weighting evaluation methods.Finally,the validity and applicability of the proposed evaluation method were verified by case examples.