期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Prebaked Anode Carbon Project with 400 Thousand Tons Annual Capacity to Be Built in Guangxi
1
《China's Refractories》 CAS 2008年第1期51-51,共1页
On January 19, 2008, the ground breaking ceremony of prebaked anode carbon project with 400 thousand tons annual capacity of Pingguo Haohai Carbon Co. , Ltd was held in Pingguo Industry Zone of Guangxi province. After... On January 19, 2008, the ground breaking ceremony of prebaked anode carbon project with 400 thousand tons annual capacity of Pingguo Haohai Carbon Co. , Ltd was held in Pingguo Industry Zone of Guangxi province. After being put into production, the project with an investment of CNY 0.8 billion, will reach CNY 1.6 billion annual production value. 展开更多
关键词 PROJECT prebaked anode Carbon Project with 400 Thousand Tons Annual Capacity to Be Built in Guangxi CNY BE
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部