期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
APPLICATION OF CONVECTION-DIFFUSION EQUATION TO THEANALYSES OF CONTAMINATION BETWEEN BATCHESIN MULTI-PRODUCTS PIPELINE TRANSPORT 被引量:1
1
作者 邓松圣 蒲家宁 《Applied Mathematics and Mechanics(English Edition)》 SCIE EI 1998年第8期757-764,共8页
Contamination between batches in multi-products pipeline transport is studied. The influences of convection and diffusion on the contamination are studied in detail. Diffusion equations, which are mainly controlled by... Contamination between batches in multi-products pipeline transport is studied. The influences of convection and diffusion on the contamination are studied in detail. Diffusion equations, which are mainly controlled by convection, are developed under turbulent pipe flow. The diffusion equation is separated into a pure convection equation and a pure diffusion equation which are solved by characteristics method and finite difference method respectively to obtain numerical solutions. The results of numerical computation explain the forming and developing of contamination very well. 展开更多
关键词 products pipeline batching transport CONTAMINATION CONVECTION DIFFUSION numerical computation turbulent flow
全文增补中
Supply-based optimal scheduling of oil product pipelines 被引量:13
2
作者 Hao-Ran Zhang Yong-Tu Liang +2 位作者 Qiao Xiao Meng-Yu Wu Qi Shao 《Petroleum Science》 SCIE CAS CSCD 2016年第2期355-367,共13页
Oil product pipelines have features such as transporting multiple materials, ever-changing operating conditions, and synchronism between the oil input plan and the oil offloading plan. In this paper, an optimal model ... Oil product pipelines have features such as transporting multiple materials, ever-changing operating conditions, and synchronism between the oil input plan and the oil offloading plan. In this paper, an optimal model was established for a single-source multi-distribution oil pro- duct pipeline, and scheduling plans were made based on supply. In the model, time node constraints, oil offloading plan constraints, and migration of batch constraints were taken into consideration. The minimum deviation between the demanded oil volumes and the actual offloading volumes was chosen as the objective function, and a linear programming model was established on the basis of known time nodes' sequence. The ant colony optimization algo- rithm and simplex method were used to solve the model. The model was applied to a real pipeline and it performed well. 展开更多
关键词 Oil products pipeline Schedulingoptimization Linear programming (LP) modelAnt colony optimization algorithm (ACO) Simplex method (SM)
下载PDF
An MILP approach for detailed scheduling of oil depots along a multi-product pipeline 被引量:3
3
作者 Hao-Ran Zhang Yong-Tu Liang +2 位作者 Qi Liao Jing Ma Xiao-Han Yan 《Petroleum Science》 SCIE CAS CSCD 2017年第2期434-458,共25页
Oil depots along products pipelines are important components of the pipeline transportation system and down-stream markets.The operating costs of oil depots account for a large proportion of the total system’s operat... Oil depots along products pipelines are important components of the pipeline transportation system and down-stream markets.The operating costs of oil depots account for a large proportion of the total system’s operating costs.Meanwhile,oil depots and pipelines form an entire system,and each operation in a single oil depot may have influence on others.It is a tough job to make a scheduling plan when considering the factors of delivering contaminated oil and batches migration.So far,studies simultaneously considering operating constraints and contaminated oil issues are rare.Aiming at making a scheduling plan with the lowest operating costs,the paper establishes a mixed-integer linear programming model,considering a sequence of operations,such as delivery, export, blending,fractionating and exchanging operations,and batch property differences of the same oil as well as influence of batch migration on contaminated volume.Moreover,the paper verifies the linear relationship between oil concentration and blending capability by mathematical deduction.Finally,the model is successfully applied to one of the product pipelines in China and proved to be practical. 展开更多
关键词 products pipeline Oil depot Scheduling plan Mixed-integer linear programming (MILP) Contaminated oil Blending capacity
下载PDF
Sinopec's First Finished Product Pipeline Put into Operation
4
《China Oil & Gas》 CAS 2000年第4期38-41,共4页
关键词 Sinopec’s First Finished Product pipeline Put into Operation
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部