It is well known that there is abundant water resources in basin of the Yangtze River, the first largest river in China, which is mainly located in Southern China. However, water resources is very scarce in the basin ...It is well known that there is abundant water resources in basin of the Yangtze River, the first largest river in China, which is mainly located in Southern China. However, water resources is very scarce in the basin of the Yellow River, which is mainly located in Northern China. So the western route project of south-north water transfer scheme (WRP-SNWTS) aims to transfer water from the Yangtze River to the Yellow River. The area of WRP-SNWT, located in the upper reaches of the Yangtze River and the main areas of Sichuan and the marginal areas of the Qinghai-Tibet Plateau, has sufficient water resources but fragile ecology and environment. Therefore, it is necessary for WRP-SNWT to analyze the ecology water required. Based on the planning principles of from low elevation to high elevation, from small to large, from short to long and from easy to difficulty, the WRP-SNWT will be constructed through three stage projects. The western route first stage project of the south-north water transfer scheme (WRFST-SNWTS) is planned to transfer 4×10^9m^3/a from six tributaries of the Yalong river and from Dadu river to Jiaqu of Yellow River.. Daqu river and Niqu river are the branches of Xianshui river. Sequ river, Duke river, Make river and Ake river are the branches of Dadu river, which account for 65-70% of the total river run-off. It need more research and the rest run-off can satisfy channel ecology water required. According to analysis ecological water required which mainly satisfy for aquicolous biology in water-exporting region, such as low air temperature. Fish and aquicolous biology main living from May to August, and rivers are iced up from December to March of next year, ecology water required mainly for fish and aquicolous biology. The flow criterion of Tennant method is modified. The ecology water required of WRFSP-SNWTS is estimated by the flow data of Zhuwo gauging station, Zhuba gauging station, Chuosijia gauging station and Zumuzu gauging station. The result show that the ecology water required calculated by modified Tennant less 1 l percent than that of Tennant. This estimating result can supply more water resources for transferring to Yellow River. Meanwhile, this can supply gist for research transferring water of WRFSP-SNWTS.展开更多
The wetted perimeter method(WPM) is used in hydrology and hydraulics to calculate instream flows.The WPM requires few data.It requires only the values of the wetted perimeter,flow and water level,which can be obtained...The wetted perimeter method(WPM) is used in hydrology and hydraulics to calculate instream flows.The WPM requires few data.It requires only the values of the wetted perimeter,flow and water level,which can be obtained from the hydrologic stations of the river in question.In addition,the WPM is not limited by the impacts of human activities on the river runoff.Therefore,this method is generally suitable for the current conditions in China.However,the process of applying the WPM involves two key aspects:how to plot the curve describing the relationship between the wetted perimeter and the discharge and how to confirm the breakpoint of the wetted perimeter-discharge curve.The traditional method is to calculate the curvature or the slope of the wetted perimeter-discharge curve to obtain the minimum flow.According to this method,the minimum flow corresponds to the point of maximum curvature or to the point at which the slope of the curve is equal to 1.The wetted perimeter-discharge curve of a natural river is only part of the complete curve.Thus,the instream flow calculated by the traditional method is the minimum or maximum discharge.The new criterion for defining the breakpoint of the wetted perimeter-discharge curve is that the slope at the breakpoint is a relative maximum,the second-largest slope.The discharges at the breakpoints corresponded to the minimum flow levels required to maintain the ecological function of the river.The minimum instream flow requirements(MIFRs) of four typical reaches,Zhuba,Daofu,Ganzi and Zumuzu hydrological stations on the West Course of the First Stage Project of the South-North Water Transfer Project(WCFSPSNWTP),are calculated using an improved wetted perimeter method(IWPM).The results show that the MIFRs of Zhuba,Daofu,Ganzi and Zumuzu are approximately 9.06-14.5 m 3 s-1,20.7-43.5 m3 s-1,38.8-77.2 m 3 s-1 and 40.4-59.5 m 3 s-1,corresponding to 11.7%-33.9%,14.2%-37.6%,12.4%-28.4% and 17.5%-30.2%,respectively of the annual average flow(AAF).These MIFRs can maintain good ecological function in a river according to the criterion furnished by the Tennant method.展开更多
文摘It is well known that there is abundant water resources in basin of the Yangtze River, the first largest river in China, which is mainly located in Southern China. However, water resources is very scarce in the basin of the Yellow River, which is mainly located in Northern China. So the western route project of south-north water transfer scheme (WRP-SNWTS) aims to transfer water from the Yangtze River to the Yellow River. The area of WRP-SNWT, located in the upper reaches of the Yangtze River and the main areas of Sichuan and the marginal areas of the Qinghai-Tibet Plateau, has sufficient water resources but fragile ecology and environment. Therefore, it is necessary for WRP-SNWT to analyze the ecology water required. Based on the planning principles of from low elevation to high elevation, from small to large, from short to long and from easy to difficulty, the WRP-SNWT will be constructed through three stage projects. The western route first stage project of the south-north water transfer scheme (WRFST-SNWTS) is planned to transfer 4×10^9m^3/a from six tributaries of the Yalong river and from Dadu river to Jiaqu of Yellow River.. Daqu river and Niqu river are the branches of Xianshui river. Sequ river, Duke river, Make river and Ake river are the branches of Dadu river, which account for 65-70% of the total river run-off. It need more research and the rest run-off can satisfy channel ecology water required. According to analysis ecological water required which mainly satisfy for aquicolous biology in water-exporting region, such as low air temperature. Fish and aquicolous biology main living from May to August, and rivers are iced up from December to March of next year, ecology water required mainly for fish and aquicolous biology. The flow criterion of Tennant method is modified. The ecology water required of WRFSP-SNWTS is estimated by the flow data of Zhuwo gauging station, Zhuba gauging station, Chuosijia gauging station and Zumuzu gauging station. The result show that the ecology water required calculated by modified Tennant less 1 l percent than that of Tennant. This estimating result can supply more water resources for transferring to Yellow River. Meanwhile, this can supply gist for research transferring water of WRFSP-SNWTS.
基金supported by the National Natural Science Foundation of China (Grant No. 50809027)the Fundamental Research Funds for the Central Universities (Grant No. 11MG15)the Open Research Fund Program of State Key Laboratory of Water Resources and Hydropower Engineering Science (Grant No. 2009B050)
文摘The wetted perimeter method(WPM) is used in hydrology and hydraulics to calculate instream flows.The WPM requires few data.It requires only the values of the wetted perimeter,flow and water level,which can be obtained from the hydrologic stations of the river in question.In addition,the WPM is not limited by the impacts of human activities on the river runoff.Therefore,this method is generally suitable for the current conditions in China.However,the process of applying the WPM involves two key aspects:how to plot the curve describing the relationship between the wetted perimeter and the discharge and how to confirm the breakpoint of the wetted perimeter-discharge curve.The traditional method is to calculate the curvature or the slope of the wetted perimeter-discharge curve to obtain the minimum flow.According to this method,the minimum flow corresponds to the point of maximum curvature or to the point at which the slope of the curve is equal to 1.The wetted perimeter-discharge curve of a natural river is only part of the complete curve.Thus,the instream flow calculated by the traditional method is the minimum or maximum discharge.The new criterion for defining the breakpoint of the wetted perimeter-discharge curve is that the slope at the breakpoint is a relative maximum,the second-largest slope.The discharges at the breakpoints corresponded to the minimum flow levels required to maintain the ecological function of the river.The minimum instream flow requirements(MIFRs) of four typical reaches,Zhuba,Daofu,Ganzi and Zumuzu hydrological stations on the West Course of the First Stage Project of the South-North Water Transfer Project(WCFSPSNWTP),are calculated using an improved wetted perimeter method(IWPM).The results show that the MIFRs of Zhuba,Daofu,Ganzi and Zumuzu are approximately 9.06-14.5 m 3 s-1,20.7-43.5 m3 s-1,38.8-77.2 m 3 s-1 and 40.4-59.5 m 3 s-1,corresponding to 11.7%-33.9%,14.2%-37.6%,12.4%-28.4% and 17.5%-30.2%,respectively of the annual average flow(AAF).These MIFRs can maintain good ecological function in a river according to the criterion furnished by the Tennant method.