期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
ENERGY-SAVING MATCHING STRATEGY AND EXPERIMENTAL STUDY OF PUMPING SYSTEM FOR TRUCK-MOUNTED CONCRETE PUMP 被引量:1
1
作者 李艾民 陈飞 《Transactions of Nanjing University of Aeronautics and Astronautics》 EI 2013年第1期104-108,共5页
Aiming at the high fuel consumption and use-cost of truck-mounted concrete pump , an energy-saving matching strategy of pumping system is presented and the experimental study is conducted.Since pumping system occupies... Aiming at the high fuel consumption and use-cost of truck-mounted concrete pump , an energy-saving matching strategy of pumping system is presented and the experimental study is conducted.Since pumping system occupies most resources of engine , the matching strategy between engine and main pump is analyzed to meet the load demand and reduce the engine rational speed drop.The testing method is established to measure the fuel consumption of engine under various working conditions , and the experimental data are analyzed to find the law of the fuel consumption of engine.The system performance can be improved by adjusting the system input value.Finally , the energy-saving matching strategy is established to reduce the fuel consumption of truck for unit workload , which provides a new approach for the energy-saving of truck-mounted concrete pump. 展开更多
关键词 truck-mounted concrete pump pumping systeml energy saving speed drop of engine
下载PDF
Motion Planning of Concrete Pump Truck with End-Effector's Specified Path
2
作者 王欣 金辉 +3 位作者 吴迪 曹旭阳 明书君 孙吉胜 《Journal of Donghua University(English Edition)》 EI CAS 2016年第1期1-7,共7页
For motion planning of concrete pump truck( CPT) with end-effector's hosepipe path, this paper sets up the mathematic model,including definition of its motion planning,description of its state in C space( configur... For motion planning of concrete pump truck( CPT) with end-effector's hosepipe path, this paper sets up the mathematic model,including definition of its motion planning,description of its state in C space( configuration space) and its path length. An advanced rapidly-exploring random trees( RRT) algorithm is proposed, in which each tracing point dispersed from the end hosepipe path can map multi-states of CPT so as to make variety of motion path of CPT. For increasing search efficiency and motion path quality,this algorithm generates any random states of CPT in certain probability to trend to the initial state or target state mapped with the end hosepipe path,and to have the least cost between this random state and its parent state. A typical case and two special cases are analyzed in which the end hosepipe paths are reciprocating linear trajectory and planar or spatial sine curves respectively. Their results verify the feasibility and validity of the proposed algorithm. 展开更多
关键词 concrete pump truck(CPT) path planning rapidly-exploring random trees(RRT)
下载PDF
Analysis and application in controlling surrounding rock of support reinforced roadway in gob-side entry with fully mechanized mining 被引量:10
3
作者 DENG Yuehua TANG Jianxin +2 位作者 ZHU Xiangke FU Yong DAI Zhangyin 《Mining Science and Technology》 EI CAS 2010年第6期839-845,共7页
In order to optimize gob-side entry in fully-mechanized working face in moderate-thick-coal seams, we adopt a new attempt to pack roadside by pumping ordinary concrete, which is very important for the development of g... In order to optimize gob-side entry in fully-mechanized working face in moderate-thick-coal seams, we adopt a new attempt to pack roadside by pumping ordinary concrete, which is very important for the development of gob-side entry technology. The concrete has a long initial setting time and a low initial strength. So it is difficult to control the surrounding rock. In this paper, we analyze the effect of using roadside cable to reinforce supporting in gob-side entry surrounding rock controlling based on elas-tic-plastic and material mechanics knowledge. And then we propose a scheme that cable is used to reinforce roadside supporting and a single hydraulic prop is used as the temporary supporting in gob side. Using the numerical simulation software FLAC2D, we numerically simulated supporting scheme. Results of both the 2D modeling and the industrial test on No.3117 face in Jingang Mine prove that the scheme is feasible. The results show that the technology of protecting the roadway in gob-entry retained efficiently make up the deficiency of roadside packing with ordinary concrete, effectively control the roof strata and acquire a good result of retaining roadway. 展开更多
关键词 gob-side entry retained surrounding rock controlling cable reinforced roadside supporting FLAC2D single hydraulic prop roadside support pumping of concrete
下载PDF
Shanghai Tower
4
作者 Jian GONG 《Frontiers of Engineering Management》 2017年第1期106-109,共4页
Owner:Shanghai Tower Construction & Development Co.,Ltd.Contractor:Shanghai Construction Group Co.,Ltd.Architectural Designer:Gensler,USA Structural engineer:Thornton Tomasetti,USA Construction Drawing Designer:To... Owner:Shanghai Tower Construction & Development Co.,Ltd.Contractor:Shanghai Construction Group Co.,Ltd.Architectural Designer:Gensler,USA Structural engineer:Thornton Tomasetti,USA Construction Drawing Designer:Tongji Architectural Design(Group)Co.,Ltd.With a height of 632 m,the Shanghai Tower stands 展开更多
关键词 super-high-rise building green building integral steel platform formwork system large volume concrete concrete pumped for super-high building deep and large foundation pit combined anterograde and retrograde methods digitalized construction technology
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部