The planned Yunnan-Tibet railway goes through the northwest of Yunnan Province and the southeast of the Tibet Autonomous Region. Because of its location near the collision belt of the Eurasian and Indian plates, compl...The planned Yunnan-Tibet railway goes through the northwest of Yunnan Province and the southeast of the Tibet Autonomous Region. Because of its location near the collision belt of the Eurasian and Indian plates, complex engineering geological conditions and difficult engineering geological problems are encountered. The study is aimed at making the zoning assessment of crustal stability along the railway line so as to provide a better base for its construction, especially its line selection. For this purpose, the following seven influencing factors of crustal stability were selected and quantified by grading and scoring: active fault, seismic activity, geo-stress field, geo-strain field, geothermal field, geo-hazard, and lithologic character. Of these factors, the active fault, seismic activity and geo-hazard are the three most prominent factors influencing the railway construction. Along the railway line there are 1731703 calculation units to be divided. The zoning assessment calculation was completed by ArcGIS-based information fusion method. The assessment results aid railway line selection and show that there are 10 stable sectors, 28 relatively stable sectors, 23 relatively unstable sectors, and 20 unstable sectors along the Yunnan-Tibet railway line.展开更多
The equation for determining cross-fault representative value is calculated based on hanging wall and foot wall reference level surfaces. The cross-fault data reliability are analyzed base on the stability of referenc...The equation for determining cross-fault representative value is calculated based on hanging wall and foot wall reference level surfaces. The cross-fault data reliability are analyzed base on the stability of reference datum and observation points, thereby facili- tating plotting of the representative value curves after removing interference. The spatial and temporal characteristics of fault deformation abnormalities before the 2016 Menyuan Ms6.4 earthquake, as well as the fault-movement characteristics reflected by representa- tive value, are summarized. The results show that many site trends had changed 1-3 years before the Menyuan Ms6.4 earthquake in the Qilian Fault, reflecting certain background abnormalities. The short-term abnormalities centrally had appeared in the 6 months to 1 year period before the earthquake near and in the neighborhood of the source region, demonstrating a significantly increased number of short-term abnormalities. Many sites near and in the neighborhood of the source region had strengthened inverse activities or had changed from positive to inverse activities in the most recent 2-3 years, which reflect stress-field enhancements or adjustment features.展开更多
The issue on water environmental degradation in the source area of the Yellow River has been one of very serious ecological and socially economic problems. The temporal-spatial changes of water environment led to the ...The issue on water environmental degradation in the source area of the Yellow River has been one of very serious ecological and socially economic problems. The temporal-spatial changes of water environment led to the decreasing of land capacity and river disconnecting. The status of water environmental degradation in this paper was analyzed based on the data and field investigation. The results indicated that the surface water area in the region has obviously decreased owing to the climate changes and human irrational use of water resources and the continuous lowering of the regional groundwater table and the steadily decreasing tendency of the flow rate in the source areas of the Yellow River.展开更多
The Tibetan, Han and other ethnic people in Tibetan Autonomous Region labored hard to protect the forests and steppes and produce invisible ecological products. The forests and steppes in Qinghai -Tibet Plateau conser...The Tibetan, Han and other ethnic people in Tibetan Autonomous Region labored hard to protect the forests and steppes and produce invisible ecological products. The forests and steppes in Qinghai -Tibet Plateau conserved water and added the Jinsha River. In order to achieve sustainable development, it needs to construct compensating mechanism inter Provinces between the upper Yangtze River and the middle and lower Yangtze River, to implement carbon sink trading, and to assist farmers and herdsmen in the Tibet to get rich as soon as possible.展开更多
Authored by Li Ping and Li Xinhu, the book actually is the result of research into “schemes of construction of railways in Yunnan and Tibet.” The book centers around research into the scheme of construction of the Y...Authored by Li Ping and Li Xinhu, the book actually is the result of research into “schemes of construction of railways in Yunnan and Tibet.” The book centers around research into the scheme of construction of the YunnanTibet Railway, conducting comprehensive studies involving political, economic, technological, social and State security fields.展开更多
Construction on the last two(Mainling Tunnel and Zagar Tunnel)of the 47 tunnels pertaining to a railway linking Lhasa and Nyingchi in Tibet Autonomous Region has been completed on April 7.Lhasa-Nyingchi Railway is a s...Construction on the last two(Mainling Tunnel and Zagar Tunnel)of the 47 tunnels pertaining to a railway linking Lhasa and Nyingchi in Tibet Autonomous Region has been completed on April 7.Lhasa-Nyingchi Railway is a section of Sichuan-Tibet Railway,which is the first electrified railway in Tibet with a total length of 435 km and a designated speed of 160 km per hour.It is expected to be completed by the end of 2020,and start operation in 2021.展开更多
On June 25,2021,Tibet's first ectric railway,the Lhasa-Nyingchi Railway,was officially put into operation.This is the third railway to be opened in the Tibet Autonomous Region after the Qinghai-Tibet Railway and t...On June 25,2021,Tibet's first ectric railway,the Lhasa-Nyingchi Railway,was officially put into operation.This is the third railway to be opened in the Tibet Autonomous Region after the Qinghai-Tibet Railway and the Lhasa-Shigatse Railway.展开更多
The Sichuan–Tibet railway construction has received significant attention from both China and abroad.The new section from Ya’an to Nyingchi is about 1018.6 km long,including 69 tunnels with a total length of 841.7 k...The Sichuan–Tibet railway construction has received significant attention from both China and abroad.The new section from Ya’an to Nyingchi is about 1018.6 km long,including 69 tunnels with a total length of 841.7 km.The longest tunnel(Yigong tunnel)is 42.4 km long.The successful construction of the Sichuan–Tibet railway depends largely on tunnel construction.Due to the complex conditions,tunnel construction for the Sichuan–Tibet railway poses great challenges to the research community.This paper aims to illustrate the necessity of interdisciplinary and joint research to solve problems associated with tunnel construction that will be encountered in the immediate future and facilitate the communication and exchange of ideas between disciplines.To this end,based on a systematic analysis of the available data related to Sichuan–Tibet railway tunnels,six major aspects of the geology,environment,and engineering conditions are identified.Next,based on the engineering responses from the Sichuan–Tibet railway tunnels,potential technical problems and risk characteristics are predicted and evaluated.Further,six key scientific issues are identified and discussed based on a coupled multi-layer analysis of essential tunnel engineering issues.Finally,research directions,technical ideas,and research methods that should be carried out for this project are proposed.展开更多
Being constructed in southwestern China, the Sichuan–Tibet Railway(STR) travels across the eastern Tibetan Plateau where there is the most complex terrain and changeable weather in the world. Due to sparse ground-bas...Being constructed in southwestern China, the Sichuan–Tibet Railway(STR) travels across the eastern Tibetan Plateau where there is the most complex terrain and changeable weather in the world. Due to sparse ground-based observations over the Tibetan Plateau, precipitation products retrieved by remote sensing are more widely used;however,satellite-based precipitation products(SPPs) have not yet been strictly and systematically evaluated along the STR.This study aims to evaluate the performance of six SPPs by a series of metrics with available ground observations along the STR during 1998–2020. The six SPPs include the datasets derived from the Tropical Rainfall Measuring Mission(TRMM), Climate Prediction Center morphing technique(CMORPH), Global Precipitation Measurement(GPM), Global Satellite Mapping of Precipitation(GSMaP), Precipitation Estimation from Remotely Sensed Information Using Artificial Neural Networks(PERSIANN), and Fengyun-2 satellites precipitation estimate(FY2PRE). The results indicate that most of the SPPs can capture the precipitation characteristics on multiple timescales(monthly,daily, hourly, and diurnal cycle) as shown by the evaluated metrics. The probability density functions of the daily and hourly precipitation are also well represented by the SPPs, and 30 mm day^(-1) and 16 mm h^(-1) are identified as the daily and hourly thresholds of extreme precipitation events along the STR. The best SPP varies at different timescales:GPM and GSMaP are suitable for the monthly and daily scale, and FY2PRE and GPM are suited to the hourly scale.In general, GPM is relatively optimum on multiple timescales, and PERSIANN gives the worst performance. In addition, the SPPs perform worse at higher altitudes and for more intense precipitation. Overall, the results from this study are expected to provide essential reference for using the SPPs in meteorological services and disaster prevention in the STR construction and its future operation.展开更多
Bullet Train Debuts on New Railway in Tibet The first electrified railway in the Tibet Autonomous Region opened on June 25,linking the regional capital Lhasa with the city of Nyingchi,as Fuxing bullet trains enter off...Bullet Train Debuts on New Railway in Tibet The first electrified railway in the Tibet Autonomous Region opened on June 25,linking the regional capital Lhasa with the city of Nyingchi,as Fuxing bullet trains enter official operation on the plateau region.With a length of 435 km and a designed speed of 160 km per hour,the new railway is a single-line electrified railway.It is the first time that a Fuxing bullet train,which was independently developed by China,is transporting passengers in Tibet.展开更多
基金supported by the Special Project of Basic Work of Science and Technology(grant No. 2011FY110100)the Geological Survey of the Ministry of Land and Resources(grant No.1212010541404)the Project of the 12th Five-year National Sci-Tech Support Plan(grant No.2011BAK12B09)
文摘The planned Yunnan-Tibet railway goes through the northwest of Yunnan Province and the southeast of the Tibet Autonomous Region. Because of its location near the collision belt of the Eurasian and Indian plates, complex engineering geological conditions and difficult engineering geological problems are encountered. The study is aimed at making the zoning assessment of crustal stability along the railway line so as to provide a better base for its construction, especially its line selection. For this purpose, the following seven influencing factors of crustal stability were selected and quantified by grading and scoring: active fault, seismic activity, geo-stress field, geo-strain field, geothermal field, geo-hazard, and lithologic character. Of these factors, the active fault, seismic activity and geo-hazard are the three most prominent factors influencing the railway construction. Along the railway line there are 1731703 calculation units to be divided. The zoning assessment calculation was completed by ArcGIS-based information fusion method. The assessment results aid railway line selection and show that there are 10 stable sectors, 28 relatively stable sectors, 23 relatively unstable sectors, and 20 unstable sectors along the Yunnan-Tibet railway line.
基金supported by the Seismic Regime Tracking Project in the Year of 2016,China Earthquake Administration(2016010205 and 2016020204)
文摘The equation for determining cross-fault representative value is calculated based on hanging wall and foot wall reference level surfaces. The cross-fault data reliability are analyzed base on the stability of reference datum and observation points, thereby facili- tating plotting of the representative value curves after removing interference. The spatial and temporal characteristics of fault deformation abnormalities before the 2016 Menyuan Ms6.4 earthquake, as well as the fault-movement characteristics reflected by representa- tive value, are summarized. The results show that many site trends had changed 1-3 years before the Menyuan Ms6.4 earthquake in the Qilian Fault, reflecting certain background abnormalities. The short-term abnormalities centrally had appeared in the 6 months to 1 year period before the earthquake near and in the neighborhood of the source region, demonstrating a significantly increased number of short-term abnormalities. Many sites near and in the neighborhood of the source region had strengthened inverse activities or had changed from positive to inverse activities in the most recent 2-3 years, which reflect stress-field enhancements or adjustment features.
文摘The issue on water environmental degradation in the source area of the Yellow River has been one of very serious ecological and socially economic problems. The temporal-spatial changes of water environment led to the decreasing of land capacity and river disconnecting. The status of water environmental degradation in this paper was analyzed based on the data and field investigation. The results indicated that the surface water area in the region has obviously decreased owing to the climate changes and human irrational use of water resources and the continuous lowering of the regional groundwater table and the steadily decreasing tendency of the flow rate in the source areas of the Yellow River.
基金Supported by the Major and Special Entrust Project of National Social Science Fund(XZ1111)the Planning Fund Project of Ministry of Education(10YJAZH08)
文摘The Tibetan, Han and other ethnic people in Tibetan Autonomous Region labored hard to protect the forests and steppes and produce invisible ecological products. The forests and steppes in Qinghai -Tibet Plateau conserved water and added the Jinsha River. In order to achieve sustainable development, it needs to construct compensating mechanism inter Provinces between the upper Yangtze River and the middle and lower Yangtze River, to implement carbon sink trading, and to assist farmers and herdsmen in the Tibet to get rich as soon as possible.
文摘Authored by Li Ping and Li Xinhu, the book actually is the result of research into “schemes of construction of railways in Yunnan and Tibet.” The book centers around research into the scheme of construction of the YunnanTibet Railway, conducting comprehensive studies involving political, economic, technological, social and State security fields.
文摘Construction on the last two(Mainling Tunnel and Zagar Tunnel)of the 47 tunnels pertaining to a railway linking Lhasa and Nyingchi in Tibet Autonomous Region has been completed on April 7.Lhasa-Nyingchi Railway is a section of Sichuan-Tibet Railway,which is the first electrified railway in Tibet with a total length of 435 km and a designated speed of 160 km per hour.It is expected to be completed by the end of 2020,and start operation in 2021.
文摘On June 25,2021,Tibet's first ectric railway,the Lhasa-Nyingchi Railway,was officially put into operation.This is the third railway to be opened in the Tibet Autonomous Region after the Qinghai-Tibet Railway and the Lhasa-Shigatse Railway.
基金the financial support by the National Natural Science of China(Grant No.51738002)the National Key R&D Program of China(Grant No.2017YFC0805401).
文摘The Sichuan–Tibet railway construction has received significant attention from both China and abroad.The new section from Ya’an to Nyingchi is about 1018.6 km long,including 69 tunnels with a total length of 841.7 km.The longest tunnel(Yigong tunnel)is 42.4 km long.The successful construction of the Sichuan–Tibet railway depends largely on tunnel construction.Due to the complex conditions,tunnel construction for the Sichuan–Tibet railway poses great challenges to the research community.This paper aims to illustrate the necessity of interdisciplinary and joint research to solve problems associated with tunnel construction that will be encountered in the immediate future and facilitate the communication and exchange of ideas between disciplines.To this end,based on a systematic analysis of the available data related to Sichuan–Tibet railway tunnels,six major aspects of the geology,environment,and engineering conditions are identified.Next,based on the engineering responses from the Sichuan–Tibet railway tunnels,potential technical problems and risk characteristics are predicted and evaluated.Further,six key scientific issues are identified and discussed based on a coupled multi-layer analysis of essential tunnel engineering issues.Finally,research directions,technical ideas,and research methods that should be carried out for this project are proposed.
基金Supported by the National Natural Science Foundation of China(42030611 and 42165005)the Second Tibetan Plateau Scientific Expedition and Research(STEP)Program(2019QZKK0103 and 2019QZKK0106)Key Research and Development Plans of Tibet Autonomous Region in 2022(XZ202201ZY0008G)。
文摘Being constructed in southwestern China, the Sichuan–Tibet Railway(STR) travels across the eastern Tibetan Plateau where there is the most complex terrain and changeable weather in the world. Due to sparse ground-based observations over the Tibetan Plateau, precipitation products retrieved by remote sensing are more widely used;however,satellite-based precipitation products(SPPs) have not yet been strictly and systematically evaluated along the STR.This study aims to evaluate the performance of six SPPs by a series of metrics with available ground observations along the STR during 1998–2020. The six SPPs include the datasets derived from the Tropical Rainfall Measuring Mission(TRMM), Climate Prediction Center morphing technique(CMORPH), Global Precipitation Measurement(GPM), Global Satellite Mapping of Precipitation(GSMaP), Precipitation Estimation from Remotely Sensed Information Using Artificial Neural Networks(PERSIANN), and Fengyun-2 satellites precipitation estimate(FY2PRE). The results indicate that most of the SPPs can capture the precipitation characteristics on multiple timescales(monthly,daily, hourly, and diurnal cycle) as shown by the evaluated metrics. The probability density functions of the daily and hourly precipitation are also well represented by the SPPs, and 30 mm day^(-1) and 16 mm h^(-1) are identified as the daily and hourly thresholds of extreme precipitation events along the STR. The best SPP varies at different timescales:GPM and GSMaP are suitable for the monthly and daily scale, and FY2PRE and GPM are suited to the hourly scale.In general, GPM is relatively optimum on multiple timescales, and PERSIANN gives the worst performance. In addition, the SPPs perform worse at higher altitudes and for more intense precipitation. Overall, the results from this study are expected to provide essential reference for using the SPPs in meteorological services and disaster prevention in the STR construction and its future operation.
文摘Bullet Train Debuts on New Railway in Tibet The first electrified railway in the Tibet Autonomous Region opened on June 25,linking the regional capital Lhasa with the city of Nyingchi,as Fuxing bullet trains enter official operation on the plateau region.With a length of 435 km and a designed speed of 160 km per hour,the new railway is a single-line electrified railway.It is the first time that a Fuxing bullet train,which was independently developed by China,is transporting passengers in Tibet.