The albite rim is present in most felsic gneisses of the Fuping Complex. The presence of the rim indicates the coexistence of plagioclase and K-feldspar in the rock. The rim is formed immediately after the myrmekite, ...The albite rim is present in most felsic gneisses of the Fuping Complex. The presence of the rim indicates the coexistence of plagioclase and K-feldspar in the rock. The rim is formed immediately after the myrmekite, and both textures were derived from the alteration of K-feldspar. The difference is that that there is no quartz present in the rim, and the rim is nearly albite and the anorthite content of the rim plagioclase is substantially lower than that of the myrmekite plagioclase. Formed at 400- 500~C the albite rim was derived from the K-feldspar composition adjustment in the late or post- magmatism stage. As the temperature decreased, the equilibrium between K-feldspar and plagioclase could be maintained, and reactions between the minerals occurred. The leucocratic veins in the complex show distinguished magma or migmatitic characteristics. The rim might form in the late magma or deuteric stage. The formation of the rim implies obvious granitic magmaor melt-injection activity. Typical metamorphic rocks cannot produce the rims. Anatexis after medium-high grade metamorphism might be subordinate. If present, the anatexis is water-present, but the rim texture cannot be taken as the symbol of anatexis.展开更多
Outlier detection is an important data screening type. RIM is a mechanism of outlier detection that identifies the contribution of data points in a regression model. A BIC-based RIM is essentially a technique develope...Outlier detection is an important data screening type. RIM is a mechanism of outlier detection that identifies the contribution of data points in a regression model. A BIC-based RIM is essentially a technique developed in this work to simultaneously detect influential data points and select optimal predictor variables. It is an addition to the body of existing literature in this area of study to both having an alternative to the AIC and Mallow’s Cp Statistic-based RIM as well as conditions of no influence, some sort of influence and perfectly single outlier data point in an entire data set which are proposed in this work. The method is implemented in R by an algorithm that iterates over all data points;deleting data points one at a time while computing BICs and selecting optimal predictors alongside RIMs. From the analyses done using evaporation data to compare the proposed method and the existing methods, the results show that the same data cases selected as having high influences by the two existing methods are also selected by the proposed method. The three methods show same performance;hence the relevance of the BIC-based RIM cannot be undermined.展开更多
Purpose–This study aims to introduce the achievements and benefits of applying wheel/rail-force–based maintenance interval extension of the C80 series wagon in China.Design/methodology/approach–Chinese wagons’exis...Purpose–This study aims to introduce the achievements and benefits of applying wheel/rail-force–based maintenance interval extension of the C80 series wagon in China.Design/methodology/approach–Chinese wagons’existing maintenance strategy had left a certain safety margin for the characteristics of widely running range,unstable service environment and submission to transportation organization requirements.To reduce maintenance costs,China railway(CR)has attempted to extend the maintenance interval since 2020.The maintenance cycle of C80 series heavy haul wagons is extended by three months(no stable routing)or 50,000 km(regular routing).However,in the meantime,the alarming rate of the running state,a key index to reflect the severe degree of hunting stability,by the train performance detection system(TPDS)for the C80 series heavy haul wagons has increased significantly.Findings–The present paper addresses a big data statistical way to evaluate the risk of allowing the C80 series heavy haul wagons to remain in operation longer than stipulated by the maintenance interval initial set.Through the maintenance and wayside-detectordata,whichis divided intothreestages,the extension period(three months),the current maintenance period and the previous maintenance period,this method reveals the alarming rate of hunting was correlated with maintenance interval.The maintainability of wagons will be achieved by utilizing wagon performance degradation modeling with the state of the wheelset and the often-contact side bearing.This paper also proposes a statistical model to return to the average safety level of the previous maintenance period’s baseline through correct alarming thresholds for unplanned corrective maintenance.Originality/value–The paper proposes an approach to reduce safety risk due to maintenance interval extension by effective maintenance program.The results are expected to help the railway company make the optimal solution to balance safety and the economy.展开更多
基金supported by the China Geological Survey (nos. 1212011120129,1212010811033,and 1212011120152)the National Natural Science Foundation of China (no. 41072053)
文摘The albite rim is present in most felsic gneisses of the Fuping Complex. The presence of the rim indicates the coexistence of plagioclase and K-feldspar in the rock. The rim is formed immediately after the myrmekite, and both textures were derived from the alteration of K-feldspar. The difference is that that there is no quartz present in the rim, and the rim is nearly albite and the anorthite content of the rim plagioclase is substantially lower than that of the myrmekite plagioclase. Formed at 400- 500~C the albite rim was derived from the K-feldspar composition adjustment in the late or post- magmatism stage. As the temperature decreased, the equilibrium between K-feldspar and plagioclase could be maintained, and reactions between the minerals occurred. The leucocratic veins in the complex show distinguished magma or migmatitic characteristics. The rim might form in the late magma or deuteric stage. The formation of the rim implies obvious granitic magmaor melt-injection activity. Typical metamorphic rocks cannot produce the rims. Anatexis after medium-high grade metamorphism might be subordinate. If present, the anatexis is water-present, but the rim texture cannot be taken as the symbol of anatexis.
文摘Outlier detection is an important data screening type. RIM is a mechanism of outlier detection that identifies the contribution of data points in a regression model. A BIC-based RIM is essentially a technique developed in this work to simultaneously detect influential data points and select optimal predictor variables. It is an addition to the body of existing literature in this area of study to both having an alternative to the AIC and Mallow’s Cp Statistic-based RIM as well as conditions of no influence, some sort of influence and perfectly single outlier data point in an entire data set which are proposed in this work. The method is implemented in R by an algorithm that iterates over all data points;deleting data points one at a time while computing BICs and selecting optimal predictors alongside RIMs. From the analyses done using evaporation data to compare the proposed method and the existing methods, the results show that the same data cases selected as having high influences by the two existing methods are also selected by the proposed method. The three methods show same performance;hence the relevance of the BIC-based RIM cannot be undermined.
文摘Purpose–This study aims to introduce the achievements and benefits of applying wheel/rail-force–based maintenance interval extension of the C80 series wagon in China.Design/methodology/approach–Chinese wagons’existing maintenance strategy had left a certain safety margin for the characteristics of widely running range,unstable service environment and submission to transportation organization requirements.To reduce maintenance costs,China railway(CR)has attempted to extend the maintenance interval since 2020.The maintenance cycle of C80 series heavy haul wagons is extended by three months(no stable routing)or 50,000 km(regular routing).However,in the meantime,the alarming rate of the running state,a key index to reflect the severe degree of hunting stability,by the train performance detection system(TPDS)for the C80 series heavy haul wagons has increased significantly.Findings–The present paper addresses a big data statistical way to evaluate the risk of allowing the C80 series heavy haul wagons to remain in operation longer than stipulated by the maintenance interval initial set.Through the maintenance and wayside-detectordata,whichis divided intothreestages,the extension period(three months),the current maintenance period and the previous maintenance period,this method reveals the alarming rate of hunting was correlated with maintenance interval.The maintainability of wagons will be achieved by utilizing wagon performance degradation modeling with the state of the wheelset and the often-contact side bearing.This paper also proposes a statistical model to return to the average safety level of the previous maintenance period’s baseline through correct alarming thresholds for unplanned corrective maintenance.Originality/value–The paper proposes an approach to reduce safety risk due to maintenance interval extension by effective maintenance program.The results are expected to help the railway company make the optimal solution to balance safety and the economy.