This paper introduces the methods and technicalities of applicating information technology in a mining area railway transport system. The pattern Client /Server is adopted in this system. There are two types of client...This paper introduces the methods and technicalities of applicating information technology in a mining area railway transport system. The pattern Client /Server is adopted in this system. There are two types of clients, i.e. PC and terminal. This article focuses on the system demand analysis, the data flow, the system architecture and some technical details.展开更多
By integrating the merits of the map overlay method and the geographic information system (GIS), a GIS based map overlay method was developed to analyze comprehensively the environmental vulnerability around railway a...By integrating the merits of the map overlay method and the geographic information system (GIS), a GIS based map overlay method was developed to analyze comprehensively the environmental vulnerability around railway and its impact on the environment, which is adapted for the comprehensive assessment of railway environmental impact and the optimization of railway alignments. The assessment process of the GIS based map overlay method was presented, which includes deciding the system structure and weights of assessment factors, making environmental vulnerability grade maps, and evaluating the alternative alignments comprehensively to obtain the best one. With the GIS functions of spatial analysis, such as overlay analysis and buffer analysis, and functions of handling attribute data, the GIS based map overlay method overcomes the shortcomings of the existing map overlay method and the conclusion is more reasonable. In the end, a detailed case study was illustrated to verify the efficiency of the method.展开更多
Good equipment management is essential for the day to day management of an enterprise. Targeted at production opera-tion of the railway transportation department of a mining group and aimed at mine railway equipment m...Good equipment management is essential for the day to day management of an enterprise. Targeted at production opera-tion of the railway transportation department of a mining group and aimed at mine railway equipment management, we have estab-lished a management information system for the equipment in the entire process of the life cycle of equipment. The project deals with basic data about equipment, initial management, maintenance, operation and even disposal, based on a C/S and B/S structure. We adopted an object-oriented approach, dealing with software engineering, information engineering, economic and organizational measures. Thus, effective monitoring and control of the operation of railway equipment and its status in the entire process has been achieved.展开更多
In recent years, Japan, and especially rural areas have faced the growing problems of debt-ridden local railway lines along with the population decline and aging population. Therefore, it is best to consider the disco...In recent years, Japan, and especially rural areas have faced the growing problems of debt-ridden local railway lines along with the population decline and aging population. Therefore, it is best to consider the discontinuation of local railway lines and introduce replacement buses to secure the transportation methods of the local people especially in rural areas. Based on the above background, targeting local railway lines that may be discontinued in the near future, appropriate bus stops when provided with potential bus stops were selected, the present study proposed a method that introduces routes for railway replacement buses adopting ant colony optimization (ACO). The improved ACO was designed and developed based on the requirements set concerning the route length, number of turns, road width, accessibility of railway lines and zones without bus stops as well as the constraint conditions concerning the route length, number of turns and zones without bus stops. Original road network data were generated and processed adopting a geographic information systems (GIS), and these are used to search for the optimal route for railway replacement buses adopting the improved ACO concerning the 8 zones on the target railway line (JR Kakogawa line). By comparing the improved ACO with Dijkstra’s algorithm, its relevance was verified and areas needing further improvements were revealed.展开更多
The graph overlay method is used to evaluate the noise impact of route alignment and the results can serve as a reference for the route alignment optimal selection. The geographic information system(GIS), with its pow...The graph overlay method is used to evaluate the noise impact of route alignment and the results can serve as a reference for the route alignment optimal selection. The geographic information system(GIS), with its powerful function of handling attribute data and spatial analysis, is adopted to calculate the noise comprehensive impact area of each alignment. With the graph overlay method, the noise vulnerability and noise impact distribution are both taken into account in the noise impact assessment of route alignment. With GIS, the efficiency of work and the reliability of result are greatly improved. By a combination of them, the noise impact on environment is fully presented in a visual way and the assessment result has vital value in route alignment optimal selection. A detailed case study is illustrated and the efficiency of the method is verified.展开更多
Given the overwhelmed GSM-R network in China,the railway sector has turned to the public network to promote railway communication technologies.With 5G identified as the next-generation mobile communication network for...Given the overwhelmed GSM-R network in China,the railway sector has turned to the public network to promote railway communication technologies.With 5G identified as the next-generation mobile communication network for railways,China has proposed a holistic approach for the building of intelligent railway via 5G public network.Based on the characteristics of 5G and the classic services of railway,the paper proposes a categorized carrying scheme for railway in mobile communication network,as well as a graded scheme based on 5G-R.The paper then advises to accelerate the development of 5G-R equipment and adopt diverse mobile communication networks to carry railway business,which are of reference to future studies on the issue.展开更多
It is an important issue to identify important influencing factors in railway accident analysis.In this paper,employing the good measure of dependence for two-variable relationships,the maximal information coefficient...It is an important issue to identify important influencing factors in railway accident analysis.In this paper,employing the good measure of dependence for two-variable relationships,the maximal information coefficient(MIC),which can capture a wide range of associations,a complex network model for railway accident analysis is designed in which nodes denote factors of railway accidents and edges are generated between two factors of which MIC values are larger than or equal to the dependent criterion.The variety of network structure is studied.As the increasing of the dependent criterion,the network becomes to an approximate scale-free network.Moreover,employing the proposed network,important influencing factors are identified.And we find that the annual track density-gross tonnage factor is an important factor which is a cut vertex when the dependent criterion is equal to 0.3.From the network,it is found that the railway development is unbalanced for different states which is consistent with the fact.展开更多
文摘This paper introduces the methods and technicalities of applicating information technology in a mining area railway transport system. The pattern Client /Server is adopted in this system. There are two types of clients, i.e. PC and terminal. This article focuses on the system demand analysis, the data flow, the system architecture and some technical details.
文摘By integrating the merits of the map overlay method and the geographic information system (GIS), a GIS based map overlay method was developed to analyze comprehensively the environmental vulnerability around railway and its impact on the environment, which is adapted for the comprehensive assessment of railway environmental impact and the optimization of railway alignments. The assessment process of the GIS based map overlay method was presented, which includes deciding the system structure and weights of assessment factors, making environmental vulnerability grade maps, and evaluating the alternative alignments comprehensively to obtain the best one. With the GIS functions of spatial analysis, such as overlay analysis and buffer analysis, and functions of handling attribute data, the GIS based map overlay method overcomes the shortcomings of the existing map overlay method and the conclusion is more reasonable. In the end, a detailed case study was illustrated to verify the efficiency of the method.
文摘Good equipment management is essential for the day to day management of an enterprise. Targeted at production opera-tion of the railway transportation department of a mining group and aimed at mine railway equipment management, we have estab-lished a management information system for the equipment in the entire process of the life cycle of equipment. The project deals with basic data about equipment, initial management, maintenance, operation and even disposal, based on a C/S and B/S structure. We adopted an object-oriented approach, dealing with software engineering, information engineering, economic and organizational measures. Thus, effective monitoring and control of the operation of railway equipment and its status in the entire process has been achieved.
文摘In recent years, Japan, and especially rural areas have faced the growing problems of debt-ridden local railway lines along with the population decline and aging population. Therefore, it is best to consider the discontinuation of local railway lines and introduce replacement buses to secure the transportation methods of the local people especially in rural areas. Based on the above background, targeting local railway lines that may be discontinued in the near future, appropriate bus stops when provided with potential bus stops were selected, the present study proposed a method that introduces routes for railway replacement buses adopting ant colony optimization (ACO). The improved ACO was designed and developed based on the requirements set concerning the route length, number of turns, road width, accessibility of railway lines and zones without bus stops as well as the constraint conditions concerning the route length, number of turns and zones without bus stops. Original road network data were generated and processed adopting a geographic information systems (GIS), and these are used to search for the optimal route for railway replacement buses adopting the improved ACO concerning the 8 zones on the target railway line (JR Kakogawa line). By comparing the improved ACO with Dijkstra’s algorithm, its relevance was verified and areas needing further improvements were revealed.
基金Project (2004036125) supported by Postdoctoral Science Foundation of China project(2002F008 2003F012) supportedby the Science and Technology Research and Development Planning Projects of the Ministry of Railway of China
文摘The graph overlay method is used to evaluate the noise impact of route alignment and the results can serve as a reference for the route alignment optimal selection. The geographic information system(GIS), with its powerful function of handling attribute data and spatial analysis, is adopted to calculate the noise comprehensive impact area of each alignment. With the graph overlay method, the noise vulnerability and noise impact distribution are both taken into account in the noise impact assessment of route alignment. With GIS, the efficiency of work and the reliability of result are greatly improved. By a combination of them, the noise impact on environment is fully presented in a visual way and the assessment result has vital value in route alignment optimal selection. A detailed case study is illustrated and the efficiency of the method is verified.
文摘Given the overwhelmed GSM-R network in China,the railway sector has turned to the public network to promote railway communication technologies.With 5G identified as the next-generation mobile communication network for railways,China has proposed a holistic approach for the building of intelligent railway via 5G public network.Based on the characteristics of 5G and the classic services of railway,the paper proposes a categorized carrying scheme for railway in mobile communication network,as well as a graded scheme based on 5G-R.The paper then advises to accelerate the development of 5G-R equipment and adopt diverse mobile communication networks to carry railway business,which are of reference to future studies on the issue.
基金Supported by the Fundamental Research Funds for the Central Universities under Grant No.2016YJS087the National Natural Science Foundation of China under Grant No.U1434209the Research Foundation of State Key Laboratory of Railway Traffic Control and Safety,Beijing Jiaotong University under Grant No.RCS2016ZJ001
文摘It is an important issue to identify important influencing factors in railway accident analysis.In this paper,employing the good measure of dependence for two-variable relationships,the maximal information coefficient(MIC),which can capture a wide range of associations,a complex network model for railway accident analysis is designed in which nodes denote factors of railway accidents and edges are generated between two factors of which MIC values are larger than or equal to the dependent criterion.The variety of network structure is studied.As the increasing of the dependent criterion,the network becomes to an approximate scale-free network.Moreover,employing the proposed network,important influencing factors are identified.And we find that the annual track density-gross tonnage factor is an important factor which is a cut vertex when the dependent criterion is equal to 0.3.From the network,it is found that the railway development is unbalanced for different states which is consistent with the fact.