A novel operation control method for relay protection in flexible DC distribution networks with distributed power supply is proposed to address the issue of inaccurate fault location during relay protection,leading to...A novel operation control method for relay protection in flexible DC distribution networks with distributed power supply is proposed to address the issue of inaccurate fault location during relay protection,leading to poor performance.The method combines a fault-tolerant fault location method based on long-term and short-term memory networks to accurately locate the fault section.Then,an operation control method for relay protection based on adaptive weight and whale optimization algorithm(WOA)is used to construct an objective function considering the shortest relay protection action time and the smallest impulse current.The adaptive weight and WOA are employed to obtain the optimal strategy for relay protection operation control,reducing the action time and impulse current.Experimental results demonstrate the effectiveness of the proposed method in accurately locating faults and improving relay protection performance.The longest operation time is reduced by 4.7023 s,and the maximum impulse current is limited to 0.3 A,effectively controlling the impact of large impulse currents and enhancing control efficiency.展开更多
Several large-scale wind turbine tripping accidents occurred in Jiuquan wind power base in 2011.According to the on-site survey and analysis of these accidents related to relay protection,causes were found to be the c...Several large-scale wind turbine tripping accidents occurred in Jiuquan wind power base in 2011.According to the on-site survey and analysis of these accidents related to relay protection,causes were found to be the collection system defects and low correct operation rate of small current grounded line selectors of the unearthed neutral point collection system.By referring to both the characteristics of Jiuquan wind power base and arrangement of relay protection,the short-circuit features of wind power and its impacts on relay protection are analyzed.The collection system and the retrofit of the small current grounded line selector are improved by specific countermeasures.Finally,further research subjects are put forward.展开更多
Power grid vulnerability is a key issue with large blackouts, causing power disruption for millions of people. The complexity of power grid, together with excessive number of components, makes it difficult to be model...Power grid vulnerability is a key issue with large blackouts, causing power disruption for millions of people. The complexity of power grid, together with excessive number of components, makes it difficult to be modeled. Currently, researchers use complex networks to model and study the performance of power grids. In fact, power grids can be modeled into a complex network by making use of ring network topology, with substations and transmission lines denoted as nodes and edges, respectively. In this paper, three protection schemes are proposed and their effectiveness in protecting the power network under high and low-load attacks is studied. The proposed schemes, namely, Cascaded Load Cut-off (CLC), Cascaded Load Overflow (CLO) and Adaptive-Cascaded Load Overflow (A-CLO), improve the robustness of the power grids, i.e., decrease the value of critical tolerance. Simulation results show that CLC and CLO protection schemes are more effective in improving the robustness of networks than the A-CLO protection scheme. However, the CLC protection scheme is effective only at the expense that certain percentage of the network will have no power supply. Thus, results show that the CLO protection scheme dominates the other protection schemes, CLC and A-CLO, in terms of the robustness of the network, improved with the precise amount of load cut-off determined.展开更多
With the development of large-scale complicated modern power systems, the requirement for the associated protection scheme tends to be more stringent and its combination more complex. However, it is very difficult to ...With the development of large-scale complicated modern power systems, the requirement for the associated protection scheme tends to be more stringent and its combination more complex. However, it is very difficult to figure out the factors of failure of such systems. This paper proposes a Petri net model of a transmission line protection relaying system, including three types of relays as well as an automatic reclosing device, and shows how to diagnose serial failure of the system by analyzing invariant sets of the model. Furthermore, it gives four basic types of failure sequences and its execution is much more intuitive and effective than the traditional method.展开更多
This paper deals with an integration of directly measured electrical parameters with data acquired by data communication from protections and terminals into an advanced monitoring system. Based on the periodic test, t...This paper deals with an integration of directly measured electrical parameters with data acquired by data communication from protections and terminals into an advanced monitoring system. Based on the periodic test, the authors of this paper present the possibility of an extended evaluation and more accurate analysis of transient and failure events. For periodical testing, as implemented during the commissioning of power plants in the Czech Republic, a monitoring system of electrical equipment has been used, to record the courses of important electrical parameters and thus, proving the proper functioning of complex technological systems in various operation modes. Data from monitoring system were used to prove the successful results of the test or as a base data for further analysis of failures. The monitoring system has proved itself as a very useful device also when recording unexpected failure events, the cause of which was very quickly and accurately detected by the follow-up analysis. Initially, only the voltage and current data from measuring transformers, analogue transducers and contact relays were used as input data for the monitoring system. After the implementation of new digital protection technology and controlling terminals with inner data recorder, the data from digital devices could be also utilized for the monitoring system.展开更多
The research and development of ultra high speed protective relay of transmission line has got great interest and attention of protective relay engineer over the world. Several versions and schemes of ultra high speed...The research and development of ultra high speed protective relay of transmission line has got great interest and attention of protective relay engineer over the world. Several versions and schemes of ultra high speed relay have been studied and designed in recent twenty years. But only a few of them have got actual apiication in the power system. The relay based on the deviation of power frequency component (DPFC) can get very high reliability with ultra high speed so it has got wide application in Chinese power system. Thousands relay sets have been applied and its operation experience verifies their excellent performance. This paper summarizes the course of the development of the uItra high speed protective relay and compares the merits and defects of the main schemes which have been developed. The principle and successful pratice of the ultra high speed protection based on DPFC reIay are introduced.展开更多
Since opening of the Korean high-speed railway in 2004,the rate of electrification has been increasing rapidly,and safety of the supply of AC railways has become very important.And the digital protection relays in rai...Since opening of the Korean high-speed railway in 2004,the rate of electrification has been increasing rapidly,and safety of the supply of AC railways has become very important.And the digital protection relays in railway feeding system need more attention with the expansion of unmanned SSs(substations)and digital SSs.For accident prevention,it is necessary to develop accurate modeling and simulation technology for railway feeding devices of electric railway.And it is also important to continuously improve test methods and develop excellent relay algorithms and apply them to the protection system to prepare for unexpected accidents.In this study,after reduced modeling the AC railway power supply system using PSCAD/EMTDC(Power Systems Computer Aided Design/Electromagnetic Transient DC Analysis),the results were compared and verified with the numerical calculation using the symmetric coordinate method.It also presents a method of using the verified results for simulation and education for various railway accidents.This study result will be used for the construction of new lines as well as existing lines in the future railway business.展开更多
Shanghai Relay Plant (SRP) was founded in 1959. With continuous development in nearly 40 years, SRP has become one of the biggest specialized manufacturers of protective relaying and distribution automation equipment ...Shanghai Relay Plant (SRP) was founded in 1959. With continuous development in nearly 40 years, SRP has become one of the biggest specialized manufacturers of protective relaying and distribution automation equipment for power system in China and a key enterprise of the Ministry of Machinery Industry. SRP was evaluated a State Second-Grade Enterprise in 1988 and awarded展开更多
The intelligent substation relay protection facility is a fundamental element in construction of modern power system,based on the principles of flexibility,security and accuracy,and it can be divided into process laye...The intelligent substation relay protection facility is a fundamental element in construction of modern power system,based on the principles of flexibility,security and accuracy,and it can be divided into process layer and substation layer according to specific equipment.The former is suitable for individual sampling of disposable equipment,can be separated from the base station synchronization sampling,with the help of synchronous digital system and ping-pong algorithm to achieve synchronization of the overall sampling,that is to take the distribution protection components,through the separate transmission medium to realize the information transmission;the latter is for variable power plant components centralized backup protection,taking online real-time tuning technique.展开更多
Co-ordination of directional over current relays(DOCR) requires the selection and setting of relays so as to sequentially isolate only that portion of the power system where an abnormality has occurred.The problem of ...Co-ordination of directional over current relays(DOCR) requires the selection and setting of relays so as to sequentially isolate only that portion of the power system where an abnormality has occurred.The problem of coordinating protective relays in electrical power systems consists of selecting suitable settings such that their fundamental protective function is met,given operational requirements of sensitivity,selectivity,reliability and speed.Directional over current relays are best suited for protection of an interconnected sub-station transmission system.One of the major problems associated with this type of protection is the difficulty in coordinating relays.To insure proper coordination,all the main/back up relay pairs must be determined.This paper presents an effective algorithm to determine the minimum number of break points and main/back up relay pairs using relative sequence matrix(RSM).A novel optimization technique based on evolutionary programming was developed using these main/back up relay pairs for directional over current relay coordination in multi-loop networks.Since the problem has multi-optimum points,conventional mathematics based optimization techniques may sometimes fail.Hence evolutionary programming(EP) was used,as it is a stochastic multi-point search optimization algorithm capable of escaping from the local optimum problem,giving a better chance of reaching a global optimum.The method developed was tested on an existing 6 bus,7 line system and better results were obtained than with conventional methods.展开更多
As the false trips of remote protection relays are among the main reasons behind cascading blackouts, it is critical to design reliable relay protection. Even though common protection schemes on traditional power syst...As the false trips of remote protection relays are among the main reasons behind cascading blackouts, it is critical to design reliable relay protection. Even though common protection schemes on traditional power systems have been investigated for a few decades, cascading failures in recent years indicate more research needed in this area. Consequently, researchers have proposed agent-based methods on the Smart Grid (SG) to address this issue. However, these existing agent-based methods simply use TCP protocol without considering real-time communication requirements (such as bandwidth and delay). To deal with this issue, several methods for efficient network resource management are proposed. Furthermore, these existing methods do not consider the potential issues in practical communication networks, which may result in delay violation and trigger relay false trips. We have discussed simple backup solutions in the previous work. In this paper, in addition to network efficiency, we focus on improving the system reliability by exploring known power system information and minimizing the chances of false trips of important remote relays, e.g., defining power line priorities based on their importance. Moreover, to further improve the. system reliability, we also in- vestigate the peer-to-peer protection approaches to address the single point of failure of centralized control center.展开更多
文摘A novel operation control method for relay protection in flexible DC distribution networks with distributed power supply is proposed to address the issue of inaccurate fault location during relay protection,leading to poor performance.The method combines a fault-tolerant fault location method based on long-term and short-term memory networks to accurately locate the fault section.Then,an operation control method for relay protection based on adaptive weight and whale optimization algorithm(WOA)is used to construct an objective function considering the shortest relay protection action time and the smallest impulse current.The adaptive weight and WOA are employed to obtain the optimal strategy for relay protection operation control,reducing the action time and impulse current.Experimental results demonstrate the effectiveness of the proposed method in accurately locating faults and improving relay protection performance.The longest operation time is reduced by 4.7023 s,and the maximum impulse current is limited to 0.3 A,effectively controlling the impact of large impulse currents and enhancing control efficiency.
基金supported by National High Technology Research and Development Program of China(863Program)(No.2011AA05A104)
文摘Several large-scale wind turbine tripping accidents occurred in Jiuquan wind power base in 2011.According to the on-site survey and analysis of these accidents related to relay protection,causes were found to be the collection system defects and low correct operation rate of small current grounded line selectors of the unearthed neutral point collection system.By referring to both the characteristics of Jiuquan wind power base and arrangement of relay protection,the short-circuit features of wind power and its impacts on relay protection are analyzed.The collection system and the retrofit of the small current grounded line selector are improved by specific countermeasures.Finally,further research subjects are put forward.
文摘Power grid vulnerability is a key issue with large blackouts, causing power disruption for millions of people. The complexity of power grid, together with excessive number of components, makes it difficult to be modeled. Currently, researchers use complex networks to model and study the performance of power grids. In fact, power grids can be modeled into a complex network by making use of ring network topology, with substations and transmission lines denoted as nodes and edges, respectively. In this paper, three protection schemes are proposed and their effectiveness in protecting the power network under high and low-load attacks is studied. The proposed schemes, namely, Cascaded Load Cut-off (CLC), Cascaded Load Overflow (CLO) and Adaptive-Cascaded Load Overflow (A-CLO), improve the robustness of the power grids, i.e., decrease the value of critical tolerance. Simulation results show that CLC and CLO protection schemes are more effective in improving the robustness of networks than the A-CLO protection scheme. However, the CLC protection scheme is effective only at the expense that certain percentage of the network will have no power supply. Thus, results show that the CLO protection scheme dominates the other protection schemes, CLC and A-CLO, in terms of the robustness of the network, improved with the precise amount of load cut-off determined.
文摘With the development of large-scale complicated modern power systems, the requirement for the associated protection scheme tends to be more stringent and its combination more complex. However, it is very difficult to figure out the factors of failure of such systems. This paper proposes a Petri net model of a transmission line protection relaying system, including three types of relays as well as an automatic reclosing device, and shows how to diagnose serial failure of the system by analyzing invariant sets of the model. Furthermore, it gives four basic types of failure sequences and its execution is much more intuitive and effective than the traditional method.
文摘This paper deals with an integration of directly measured electrical parameters with data acquired by data communication from protections and terminals into an advanced monitoring system. Based on the periodic test, the authors of this paper present the possibility of an extended evaluation and more accurate analysis of transient and failure events. For periodical testing, as implemented during the commissioning of power plants in the Czech Republic, a monitoring system of electrical equipment has been used, to record the courses of important electrical parameters and thus, proving the proper functioning of complex technological systems in various operation modes. Data from monitoring system were used to prove the successful results of the test or as a base data for further analysis of failures. The monitoring system has proved itself as a very useful device also when recording unexpected failure events, the cause of which was very quickly and accurately detected by the follow-up analysis. Initially, only the voltage and current data from measuring transformers, analogue transducers and contact relays were used as input data for the monitoring system. After the implementation of new digital protection technology and controlling terminals with inner data recorder, the data from digital devices could be also utilized for the monitoring system.
文摘The research and development of ultra high speed protective relay of transmission line has got great interest and attention of protective relay engineer over the world. Several versions and schemes of ultra high speed relay have been studied and designed in recent twenty years. But only a few of them have got actual apiication in the power system. The relay based on the deviation of power frequency component (DPFC) can get very high reliability with ultra high speed so it has got wide application in Chinese power system. Thousands relay sets have been applied and its operation experience verifies their excellent performance. This paper summarizes the course of the development of the uItra high speed protective relay and compares the merits and defects of the main schemes which have been developed. The principle and successful pratice of the ultra high speed protection based on DPFC reIay are introduced.
基金the Ministry of Land,Infrastructure and Transport's Research Project on Railway Technology-Project(20RTRP-B146034-03)。
文摘Since opening of the Korean high-speed railway in 2004,the rate of electrification has been increasing rapidly,and safety of the supply of AC railways has become very important.And the digital protection relays in railway feeding system need more attention with the expansion of unmanned SSs(substations)and digital SSs.For accident prevention,it is necessary to develop accurate modeling and simulation technology for railway feeding devices of electric railway.And it is also important to continuously improve test methods and develop excellent relay algorithms and apply them to the protection system to prepare for unexpected accidents.In this study,after reduced modeling the AC railway power supply system using PSCAD/EMTDC(Power Systems Computer Aided Design/Electromagnetic Transient DC Analysis),the results were compared and verified with the numerical calculation using the symmetric coordinate method.It also presents a method of using the verified results for simulation and education for various railway accidents.This study result will be used for the construction of new lines as well as existing lines in the future railway business.
文摘Shanghai Relay Plant (SRP) was founded in 1959. With continuous development in nearly 40 years, SRP has become one of the biggest specialized manufacturers of protective relaying and distribution automation equipment for power system in China and a key enterprise of the Ministry of Machinery Industry. SRP was evaluated a State Second-Grade Enterprise in 1988 and awarded
文摘The intelligent substation relay protection facility is a fundamental element in construction of modern power system,based on the principles of flexibility,security and accuracy,and it can be divided into process layer and substation layer according to specific equipment.The former is suitable for individual sampling of disposable equipment,can be separated from the base station synchronization sampling,with the help of synchronous digital system and ping-pong algorithm to achieve synchronization of the overall sampling,that is to take the distribution protection components,through the separate transmission medium to realize the information transmission;the latter is for variable power plant components centralized backup protection,taking online real-time tuning technique.
文摘Co-ordination of directional over current relays(DOCR) requires the selection and setting of relays so as to sequentially isolate only that portion of the power system where an abnormality has occurred.The problem of coordinating protective relays in electrical power systems consists of selecting suitable settings such that their fundamental protective function is met,given operational requirements of sensitivity,selectivity,reliability and speed.Directional over current relays are best suited for protection of an interconnected sub-station transmission system.One of the major problems associated with this type of protection is the difficulty in coordinating relays.To insure proper coordination,all the main/back up relay pairs must be determined.This paper presents an effective algorithm to determine the minimum number of break points and main/back up relay pairs using relative sequence matrix(RSM).A novel optimization technique based on evolutionary programming was developed using these main/back up relay pairs for directional over current relay coordination in multi-loop networks.Since the problem has multi-optimum points,conventional mathematics based optimization techniques may sometimes fail.Hence evolutionary programming(EP) was used,as it is a stochastic multi-point search optimization algorithm capable of escaping from the local optimum problem,giving a better chance of reaching a global optimum.The method developed was tested on an existing 6 bus,7 line system and better results were obtained than with conventional methods.
文摘As the false trips of remote protection relays are among the main reasons behind cascading blackouts, it is critical to design reliable relay protection. Even though common protection schemes on traditional power systems have been investigated for a few decades, cascading failures in recent years indicate more research needed in this area. Consequently, researchers have proposed agent-based methods on the Smart Grid (SG) to address this issue. However, these existing agent-based methods simply use TCP protocol without considering real-time communication requirements (such as bandwidth and delay). To deal with this issue, several methods for efficient network resource management are proposed. Furthermore, these existing methods do not consider the potential issues in practical communication networks, which may result in delay violation and trigger relay false trips. We have discussed simple backup solutions in the previous work. In this paper, in addition to network efficiency, we focus on improving the system reliability by exploring known power system information and minimizing the chances of false trips of important remote relays, e.g., defining power line priorities based on their importance. Moreover, to further improve the. system reliability, we also in- vestigate the peer-to-peer protection approaches to address the single point of failure of centralized control center.