期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Seismic rehabilitation and analysis of Chaohe earth dam 被引量:1
1
作者 付磊 曾向武 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2005年第2期265-273,共9页
Stability of earth dams during earthquakes has been a major concern for gcotechnical engineers in seismic active regions. Liquefaction induced slope failure occurred at the upstream slope of a major earth dam in the s... Stability of earth dams during earthquakes has been a major concern for gcotechnical engineers in seismic active regions. Liquefaction induced slope failure occurred at the upstream slope of a major earth dam in the suburb of Beijing, China, during the 1976 Tangshan Earthquake. The gravelly soil with loose initial condition liquefied under relatively small ground vibration. In recent years, a major seismic rehabilitation project was carried out on a similar earth dam nearby using dumped quarry stone. Seismic stability analysis was carried out using model test, finite element simulation, and pseudostatic slope stability program after taking into account the influence of excess pore pressure. 展开更多
关键词 earth dam REHABILITATION stability analysis LIQUEFACTION riprap protection
下载PDF
Scour and Scour Countermeasures at Bridge Sites
2
作者 CHIEW Yee-Meng 《Transactions of Tianjin University》 EI CAS 2008年第4期289-295,共7页
This paper examines scour and scour countermeasures at bridge piers and abutments. Abutment scour is by far more complex than its counterpart associated with piers because of the possibility of the presence of a flood... This paper examines scour and scour countermeasures at bridge piers and abutments. Abutment scour is by far more complex than its counterpart associated with piers because of the possibility of the presence of a floodplain. Notwithstanding this, the mechanism of scour at both piers and abutments is very similar; moreover, the failure mechanisms associated with both armoring and flow-altering countermeasures are not very different. In rivers with a floodplain, abutment scour becomes much more complex. In cases where the abutment ends at or near to the floodplain, it can initiate bank erosion, which clearly is an important erosion problem that is quite distinct from the customary scour at either an abutment in rivers without a floodplain or a pier. For this reason, abutment scour can be very site-specific while pier-scour is more generic in nature. To this end, the ability to identify the type of abutment scour that may form in a particular channel is closely related to an engineer's ability to propose devices for effective scour countermeasure.By summarizing research efforts on using riprap as a pier or abutment countermeasure over the past few decades, this paper highlights the deficiencies of riprap in arresting pier scour. To this end, different failure mechanisms are identified. They are shear failure, winnowing failure, edge failure, bedform-induced failure and bed-degradation induced failure. Each failure mechanism can singly or, more likely, combine to cause the eventual breakdown of the riprap layer. The study shows that a riprap layer is vulnerable to other failure mechanisms even though it is adequately designed against shear failure, rendering it ineffective in arresting scour. 展开更多
关键词 abutment scour pier scour river engineering scour countermeasure riprap protection sediment transport
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部