期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Construction Technology and Safety Risk Control Measures of Deep Foundation Pit Excavation 被引量:1
1
作者 Mingmin Jiang 《Journal of World Architecture》 2023年第2期24-29,共6页
Deep foundation pit excavation is a basic and key step involved in modern building construction.In order to ensure the construction quality and safety of deep foundation pits,this paper takes a project as an example t... Deep foundation pit excavation is a basic and key step involved in modern building construction.In order to ensure the construction quality and safety of deep foundation pits,this paper takes a project as an example to analyze deep foundation pit excavation technology,including the nature of this construction project,the main technical measures in the construction of deep foundation pit,and the analysis of the safety risk prevention and control measures.The purpose of this analysis is to provide scientific reference for the construction quality and safety of deep foundation pits. 展开更多
关键词 Construction engineering Deep foundation pit excavation Construction technology risk prevention and control measures
下载PDF
Controlling the Risk of Construction Delay in the Middle East: State-of-the-Art Review
2
作者 Omayma Hashim Motaleb Mohammed Kishk 《Journal of Civil Engineering and Architecture》 2015年第5期506-516,共11页
The financial crisis in late 2008 arrested economic development in the construction sector in the Middle East, with the result that investors' confidence in the sector is severely depressed. Delays constitute one of ... The financial crisis in late 2008 arrested economic development in the construction sector in the Middle East, with the result that investors' confidence in the sector is severely depressed. Delays constitute one of the highest impediments to project success. In this respect, the traditional management is no longer sufficient for construction project success. The objective of this study is to conduct a literature review to identify additional effective measures for controlling the potential delays risks in construction projects in order to maximize the opportunities for success in those projects. Thirty-six scholarly articles published between 2000 and 2011 are reviewed to identify related MDRC (measures for delays risks control). This survey reveals that 60% of the studies are related to decision-making, performance, risk management variations and poor management knowledge of stakeholders and that 20% of these studies are undertaken in the Middle East. A further 25% of the studies are related to the lack of financial risk by stakeholders, and of these 14% are in the Middle East. A knowledge gap is identified in terms of project performance, stakeholder management and risk management, which are seen as significant measures of success in controlling project delay. 展开更多
关键词 measures of delays risks control risk management project management STAKEHOLDERS Middle East.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部