In recent years, in Vietnam, economy has been developing rapidly. To ensure rapid and sustainable economic growth, strong support from the energy sector is required. Governments in Vietnam have invested in numerous hy...In recent years, in Vietnam, economy has been developing rapidly. To ensure rapid and sustainable economic growth, strong support from the energy sector is required. Governments in Vietnam have invested in numerous hydropower projects, many of which employ the EPC (Engineering, Procurement and Construction) contract. However, the EPC general contractors are facing many difficulties, resulting in schedule delays and considerable losses. This research is conducted to highlight the main risk factors in the delays of hydropower construction projects in Vietnam. The research employs the method of statistical calculations and risk analysis to obtain feedback from experts participating in similar projects. The research outcomes are as follows: identifying the risks that can cause delays in EPC hydroelectric construction projects in Vietnam;calculating and classifying the degree of impact of each risk to the progress of the construction. The practical significance of this study is to ensure the timely completion of projects, benefits for the investors, and the EPC general contractors.展开更多
The series of Summer Institute for Disaster and Risk Research is part of the implementation of the Hazard and Risk Science Base at Beijing Normal University,funded jointly by the State Administration of Foreign Expert...The series of Summer Institute for Disaster and Risk Research is part of the implementation of the Hazard and Risk Science Base at Beijing Normal University,funded jointly by the State Administration of Foreign Experts Affairs,Ministry of Education,and the Beijing Normal University.Who can apply?The Summer Institute is designed primarily for junior faculty and young researchers,post-docs and advanced doctoral students,who have shown strong interests and possessed research experience in the disaster and risk field.The application展开更多
Traditional occupational disease control and prevention has remained prevalent in China over recent decades. There are appropriately 30,000 new case reports of occupational diseases annually. Although China has alread...Traditional occupational disease control and prevention has remained prevalent in China over recent decades. There are appropriately 30,000 new case reports of occupational diseases annually. Although China has already established a series of occupational disease prevention programs, occupational health risk assessment (OHRA) strategies continue to be a limitation.展开更多
Security risk assessment refers to the process of identifying, analyzing, and evaluating potential security risks for an organization. An organization’s assets, personnel, and operations are protected through it as p...Security risk assessment refers to the process of identifying, analyzing, and evaluating potential security risks for an organization. An organization’s assets, personnel, and operations are protected through it as part of a comprehensive security program. Various security assessments models have been published in the literature to protect the Saudi organization’s assets, personnel, and operations. However, these models are redundant and were developed for specific purposes. Hence, the comprehensive security risk assessment model used to safeguard Saudi organizations’ assets, personnel, and operations is still omitted. Using a design science methodology, the objective of this study is to develop a comprehensive security risk assessment model called CSRAM to assess security risks in Saudi Arabian organizations based on the International Organization for Standardization and the International Electrotechnical Commission/Information security risk management (ISO/IEC 27005 ISRM) standard. CSRAM is made up of six stages: threat identification, vulnerability assessment, risk analysis, risk evaluation, risk treatment, and monitoring and review of the risk. The stages have many activities and tasks that need to be accomplished at each stage. Based on the results of the validation of the completeness of the CSRAM, we can say that the CSRAM covers the whole ISO/IEC 27005 ISRM standard, and it is complete.展开更多
Flooding is a global threat,necessitating a comprehensive management approach.Due to the complexity of managing flood hazards and risks,researchers have advocated for holistic,comprehensive,and integrated approaches.T...Flooding is a global threat,necessitating a comprehensive management approach.Due to the complexity of managing flood hazards and risks,researchers have advocated for holistic,comprehensive,and integrated approaches.This study,employing a systems thinking perspective,assessed global flood risk management research trends,gaps,and opportunities using132 published documents in BibTeX format.A systematic review of downloaded documents from the Scopus and Web of Science databases revealed slow progress of approximately 11.61% annual growth in applying systems thinking and its concomitant approaches to understanding global flood risk management over the past two decades compared to other fields like water resource management and business management systems.A significant gap exists in the application of systems thinking methodologies to flood risk management research between developed and developing countries,particularly in Africa,highlighting the urgency of reoriented research and policy efforts.The application gaps of the study methodology are linked to challenges outlined in existing literature,such as issues related to technical expertise and resource constraints.This study advocates a shift from linear to holistic approaches in flood risk management,aligned with the Sendai Framework for Disaster Risk Reduction 2015-2023 and the Sustainable Development Goals.Collaboration among researchers,institutions,and countries is essential to address this global challenge effectively.展开更多
文摘In recent years, in Vietnam, economy has been developing rapidly. To ensure rapid and sustainable economic growth, strong support from the energy sector is required. Governments in Vietnam have invested in numerous hydropower projects, many of which employ the EPC (Engineering, Procurement and Construction) contract. However, the EPC general contractors are facing many difficulties, resulting in schedule delays and considerable losses. This research is conducted to highlight the main risk factors in the delays of hydropower construction projects in Vietnam. The research employs the method of statistical calculations and risk analysis to obtain feedback from experts participating in similar projects. The research outcomes are as follows: identifying the risks that can cause delays in EPC hydroelectric construction projects in Vietnam;calculating and classifying the degree of impact of each risk to the progress of the construction. The practical significance of this study is to ensure the timely completion of projects, benefits for the investors, and the EPC general contractors.
文摘The series of Summer Institute for Disaster and Risk Research is part of the implementation of the Hazard and Risk Science Base at Beijing Normal University,funded jointly by the State Administration of Foreign Experts Affairs,Ministry of Education,and the Beijing Normal University.Who can apply?The Summer Institute is designed primarily for junior faculty and young researchers,post-docs and advanced doctoral students,who have shown strong interests and possessed research experience in the disaster and risk field.The application
基金supported by the Natural Science Foundation of China(81472961)the Joint Projects of the National Health and Family Planning Commission of China and the Health Bureau of Zhejiang Province(No.WSK 2014-2-004)the Zhejiang Provincial Program for the Cultivation of High-Level Innovative Health Talents
文摘Traditional occupational disease control and prevention has remained prevalent in China over recent decades. There are appropriately 30,000 new case reports of occupational diseases annually. Although China has already established a series of occupational disease prevention programs, occupational health risk assessment (OHRA) strategies continue to be a limitation.
文摘Security risk assessment refers to the process of identifying, analyzing, and evaluating potential security risks for an organization. An organization’s assets, personnel, and operations are protected through it as part of a comprehensive security program. Various security assessments models have been published in the literature to protect the Saudi organization’s assets, personnel, and operations. However, these models are redundant and were developed for specific purposes. Hence, the comprehensive security risk assessment model used to safeguard Saudi organizations’ assets, personnel, and operations is still omitted. Using a design science methodology, the objective of this study is to develop a comprehensive security risk assessment model called CSRAM to assess security risks in Saudi Arabian organizations based on the International Organization for Standardization and the International Electrotechnical Commission/Information security risk management (ISO/IEC 27005 ISRM) standard. CSRAM is made up of six stages: threat identification, vulnerability assessment, risk analysis, risk evaluation, risk treatment, and monitoring and review of the risk. The stages have many activities and tasks that need to be accomplished at each stage. Based on the results of the validation of the completeness of the CSRAM, we can say that the CSRAM covers the whole ISO/IEC 27005 ISRM standard, and it is complete.
基金the European Union-sponsored project Fostering Research&Intra-African Mobility&Education (FRAME) (Reference Number FRAM2000567),for the financial support in executing this research。
文摘Flooding is a global threat,necessitating a comprehensive management approach.Due to the complexity of managing flood hazards and risks,researchers have advocated for holistic,comprehensive,and integrated approaches.This study,employing a systems thinking perspective,assessed global flood risk management research trends,gaps,and opportunities using132 published documents in BibTeX format.A systematic review of downloaded documents from the Scopus and Web of Science databases revealed slow progress of approximately 11.61% annual growth in applying systems thinking and its concomitant approaches to understanding global flood risk management over the past two decades compared to other fields like water resource management and business management systems.A significant gap exists in the application of systems thinking methodologies to flood risk management research between developed and developing countries,particularly in Africa,highlighting the urgency of reoriented research and policy efforts.The application gaps of the study methodology are linked to challenges outlined in existing literature,such as issues related to technical expertise and resource constraints.This study advocates a shift from linear to holistic approaches in flood risk management,aligned with the Sendai Framework for Disaster Risk Reduction 2015-2023 and the Sustainable Development Goals.Collaboration among researchers,institutions,and countries is essential to address this global challenge effectively.