According to the measured data after impoundment and operation of the Three Gorges Reservoir,the reservoir sediment deposition and downstream river channel scouring are described briefly and compared with the research...According to the measured data after impoundment and operation of the Three Gorges Reservoir,the reservoir sediment deposition and downstream river channel scouring are described briefly and compared with the research results achieved in the demonstration stage.It is indicated through analysis that the reservoir sediment deposition and downstream river channel scouring during 8-year impoundment and operation are still within the original forecast,so the original forecasting results are feasible.The further observation and comparison should be conducted because the comparison between the observed data and the original forecast is not so sufficient in time and the prototype observation and related research work should be strengthened in the future.展开更多
Gezhouba hydroproject was impounded and put into operation in 1981. In order to analyse the impact on the downstream river course, Jingjiang Hydrologic and Water Resources Survey Bureau of Changjiang Water Resources C...Gezhouba hydroproject was impounded and put into operation in 1981. In order to analyse the impact on the downstream river course, Jingjiang Hydrologic and Water Resources Survey Bureau of Changjiang Water Resources Commission has conducted prototype observation on the Yichang-Chenglingji river stretch. On basis of the observed data, the change in river regime and scour-sedimentation evolution and water surface profile below the dam are analysed systematically. The results show that the scouring of downstream river course mainly stretches from Yichang to Ouchikou, mainly occurring in 1980~1987; the scourring mainly takes place in the river channel and the water surface profile drops significantly in dry season,but not quite in high flood season.展开更多
基金support from the Technology Pillar Program during the"Eleventh Five-year Plan"Period (No.2006BAB05B02No.2006BAB05B03) are acknowledged
文摘According to the measured data after impoundment and operation of the Three Gorges Reservoir,the reservoir sediment deposition and downstream river channel scouring are described briefly and compared with the research results achieved in the demonstration stage.It is indicated through analysis that the reservoir sediment deposition and downstream river channel scouring during 8-year impoundment and operation are still within the original forecast,so the original forecasting results are feasible.The further observation and comparison should be conducted because the comparison between the observed data and the original forecast is not so sufficient in time and the prototype observation and related research work should be strengthened in the future.
文摘Gezhouba hydroproject was impounded and put into operation in 1981. In order to analyse the impact on the downstream river course, Jingjiang Hydrologic and Water Resources Survey Bureau of Changjiang Water Resources Commission has conducted prototype observation on the Yichang-Chenglingji river stretch. On basis of the observed data, the change in river regime and scour-sedimentation evolution and water surface profile below the dam are analysed systematically. The results show that the scouring of downstream river course mainly stretches from Yichang to Ouchikou, mainly occurring in 1980~1987; the scourring mainly takes place in the river channel and the water surface profile drops significantly in dry season,but not quite in high flood season.