期刊文献+
共找到7篇文章
< 1 >
每页显示 20 50 100
Coupling interaction between biodiversity and aquatic habitat area in Western Route Project vicinity 被引量:1
1
作者 Shi-min TIAN Zhao-yin WANG +1 位作者 Xiang-jun LIU Shi-kui LIANG 《Water Science and Engineering》 EI CAS 2010年第3期354-360,共7页
The Western Route of the South-to-North Water Transfer Project will divert water from the upper Yangtze River and its tributaries, the Dadu River and Yalong River, to the upper Yellow River. The project may ease the w... The Western Route of the South-to-North Water Transfer Project will divert water from the upper Yangtze River and its tributaries, the Dadu River and Yalong River, to the upper Yellow River. The project may ease the water shortage in the Yellow River Basin. However, it may also have some effects on the ecosystem in the upper Yangtze River Basin. Benthic invertebrates play an important role in the river ecosystem, particularly in the circulation of materials and nutrition. Benthic invertebrates are widely used to quickly assess river ecosystems because of their rapid response to changes in the water environment. The diversity of benthic invertebrates is closely associated with the aquatic habitat area. This study examined this interaction by sampling the benthic invertebrates in an expanding area. The conclusions are that the diversity of benthic invertebrates begins to decrease when the aquatic habitat area is reduced to 45% of the original area, and decreases dramatically when the aquatic habitat area is reduced to 10% of the original area. The aquatic habitat area should be kept at more than 45% of the original area in order to maintain the significant diversity of benthic invertebrates. 展开更多
关键词 Western route project South-to-North Water Transfer project river ecosystem benthic invertebrates BIODIVERSITY aquatic habitat area
下载PDF
Eco-environmental benefit assessment of China's South-North Water Transfer Scheme——the middle route project
2
作者 DUANGuang-ming ZHAOJing-zhu LIUGuo-hua KEBing XIAOHan WUGang DENGHong-bing 《Journal of Environmental Sciences》 SCIE EI CAS CSCD 2004年第2期308-315,共8页
This paper assess the eco-environmental benefits that may come from the middle route project of China's South-North Water Transfer Scheme(SNWT) with principles and methods of eco-economics and planning reports of ... This paper assess the eco-environmental benefits that may come from the middle route project of China's South-North Water Transfer Scheme(SNWT) with principles and methods of eco-economics and planning reports of SNWT's middle route project. Some benefits were calculated in monetary units. To make sure that the results can be comparable with normal monetary indices, concrete assessment objects and the parameters are prudently selected according to the major characteristics of the project and its water import region. Primary assessment revealed that in different project construction stages, the benefit could be more than 13 07 billion RMB Yuan in 2010 and 19 79 billion RMB Yuan in 2030, respectively. The monetary value tends to increase with social-economic development. To realize these potential benefits, however, calls for more endeavors. 展开更多
关键词 China's South-North Water Transfer Scheme(SNWT) the middle route project of South-North Water Transfer(MRPSNWT) assessment ecosystem services monetary indices
下载PDF
Computing payment for ecosystem services in watersheds: An analysis of the Middle Route Project of South-to-North Water Diversion in China 被引量:12
3
作者 Zhengju Dong Yan Yan +5 位作者 Jing Duan Xiao Fu Qingrong Zhou Xiang Huang Xiangen Zhu Jingzhu Zhao 《Journal of Environmental Sciences》 SCIE EI CAS CSCD 2011年第12期2005-2012,共8页
Payment for ecosystem services (PES) has attracted considerable attention as an economic incentive for promoting natural resource management recently. As emphasis has been placed on using the incentive-based mechani... Payment for ecosystem services (PES) has attracted considerable attention as an economic incentive for promoting natural resource management recently. As emphasis has been placed on using the incentive-based mechanism by the central government, rapid progress on PES research and practice has been achieved. However PES still faces many difficulties. A key issue is the lack of a fully-fledged theory and method to clearly define the design scope, accounting and feasibility of PES criteria. An improved watershed criteria model was developed in light of research on PES practices in China, investigations on the water source area for the Middle Route Project of South-to-North Water Diversion and ecosystem services outflows theory. The basic principle of assessment is the direct and opportunity cost for ecological conservation and environmental protection in the water source area deduct nationally-financed PES and internal effect. Then the scope and the criteria methods were determined, and internal effect was put forward to define benefits brought from water source area. Finally, Shiyan City, which is the main water source area for the Project of Water Diversion, was analyzed by this model and its payment was calculated. The results showed that: (1) during 2003–2050, the total direct cost and opportunity cost would reach up to 262.70 billion and 256.33 billion Chinese Yuan (CNY, 2000 constant prices), i.e., 50.61% and 49.38% of total cost, respectively; (2) Shiyan City would gain 0.23, 0.06 and 0.03 CNY/m3 in 2014–2020, 2021–2030, and 2031–2050, respectively. 展开更多
关键词 WATERSHED payment for ecosystem services ecosystem services cost-benefit analysis Middle route project of South-to- North Water Diversion
原文传递
Land Cover Changes and Drivers in the Water Source Area of the Middle Route of the South-to-North Water Diversion Project in China from 2000 to 2015 被引量:2
4
作者 GAO Wenwen ZENG Yuan +2 位作者 ZHAO Dan WU Bingfang REN Zhiyuan 《Chinese Geographical Science》 SCIE CSCD 2020年第1期115-126,共12页
The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial u... The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial use.The water source area of the MR-SNWDP is the region that is most sensitive to and most affected by the construction of this water diversion project.In this study,we used Landsat Thematic Mapper(TM)and HJ-1 A/B images from 2000 to 2015 by an object-based approach with a hierarchical classification method for mapping land cover in the water source area.The changes in land cover were illuminated by transfer matrixes,single dynamic degree,slope zones and fractional vegetation cover(FVC).The results indicated that the area of cropland decreased by 31%and was replaced mainly by shrub over the past 15 years,whereas forest and settlements showed continuous increases of 29.2% and 77.7%,respectively.The changes in cropland were obvious in all slope zones and decreased most remarkably(–43.8%)in the slope zone above 25°.Compared to the FVC of forest and shrub,significant improvement was exhibited in the FVC of grassland,with a growth rate of 16.6%.We concluded that local policies,including economic development,water conservation and immigration resulting from the construction of the MR-SNWDP,were the main drivers of land cover changes;notably,they stimulated the substantial and rapid expansion of settlements,doubled the wetlands and drove the transformation from cropland to settlements in immigration areas. 展开更多
关键词 remote sensing land cover change object-based classification Middle route of the South-to-North Water Diversion project(MR-SNWDP) China
下载PDF
Geological conditions and key rock mechanics issues in the Western Route of South-to-North Water Transfer Project 被引量:2
5
作者 XuechaoWang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE 2011年第3期234-243,共10页
In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel... In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel boring machine (TBM). The classification standard of surrounding rocks is put forward on the basis of physical simulations and engineering practices. Damage, deformation and evolution of surrounding rocks induced by TBM excavation are discussed. Meanwhile, the long-term deformation mechanisms and stability of surrounding rocks are also studied. On this basis, a three-dimensional constitutive model for interbedded sandstone slate and a fiat shell-joint element-foundation system for calculating internal forces of segment lining are established. The deformation features of surrounding rocks of deep and steep interbedded sandstone slate and their influences on internal forces of segment lining are presented. Finally, the design methods of segment lining constructed in deep and steep flysch are proposed. 展开更多
关键词 the Western route of South-to-North Water Transfer project rock mechanics issues classification of surrounding rocks stability of surrounding rocks excavation-induced damage lining design
下载PDF
Water-saving potential evaluation of water-receiving regions in Shandong province on the East Route of the South-to-North Water Transfer Project of China
6
作者 YIN Xiao-lin GAO Yuan-yuan +1 位作者 WU Hai-ping ZHAO Xue-ming 《Journal of Groundwater Science and Engineering》 2020年第3期287-297,共11页
Taking 13 water-receiving areas on the East Route of the South-to-North Water Diversion Project(ERSNWDP)in Shandong Province as the study area,and comparing it with Jiangsu Province on the ERSNWDP and the Middle Route... Taking 13 water-receiving areas on the East Route of the South-to-North Water Diversion Project(ERSNWDP)in Shandong Province as the study area,and comparing it with Jiangsu Province on the ERSNWDP and the Middle Route of the South-to-North(MRSNWDP),the current water-saving potential of the water-receiving areas within the municipalities of Shandong was analyzed.Different water-saving scenarios were constructed and analyzed with key water-saving indexes in various industries.These indexes include the effective utilization coefficient of farmland irrigation water,total water consumption of industrial sectors with an added value of over 10000 RMB,average leakage rate of the urban public water supply pipe network and the penetration rate of water-saving appliances.Based on the scenarios,comprehensive water-saving potential of the 13 water-receiving area cities was calculated.The results show that the water-saving potential of the study area is at a relative high level.However,some cities still have a certain amount of water-saving potential for agriculture and industry to be elevated.Under the recommended water-saving scenario,the water-saving potential is 1.134 billion m3,accounting for 5.33%of the current total water consumption,of which 460 million m3 is in agriculture,600 million m3 in industry,is and 74.20 million m3 in urban domestic sector.Comprehensive water-saving measures for the study area were proposed from the aspects of agricultural,industrial and domestic water uses.Agricultural and industrial water saving are more significant.The major cities for agricultural water saving include Jining City,Heze City,Weifang City and Jinan City;the focus cities of industrial water saving mainly include Weihai City,Jining City and Qingdao City and etc.;the key water-saving areas for urban use mainly include Zaozhuang City,Jining City and Heze City. 展开更多
关键词 East route of South-to-North Water Diversion project Shandong water receiving area water-saving level water-saving potential
下载PDF
Simulation of Transport Channel in China's Middle Route South-to-North Water Transfer Project 被引量:3
7
作者 方神光 魏加华 +1 位作者 吴保生 尚毅梓 《Tsinghua Science and Technology》 SCIE EI CAS 2009年第3期367-377,共11页
The unsteady flow in the Middle Route South-to-North Water Transfer Channel was simulated numerically using an implicit solution procedure for the Saint Venant equations. An equivalent roughness was used to simulate t... The unsteady flow in the Middle Route South-to-North Water Transfer Channel was simulated numerically using an implicit solution procedure for the Saint Venant equations. An equivalent roughness was used to simulate the effect of many transfer structures on the water levels in the main channel. Various gate operating and control methods were analyzed to study the response to disturbances produced by varying the flow rates through the Tianjin outlet. The results show that when the inflow at the head changes in the same way as the sum of the flow rates through all the outlets, the transition time and the fluctuation of the water levels using the timed gate operation method are less than when using the simultaneous gate operation method, but the variations of the gate openings and flow rates through each control gate are much larger. The flow disturbances produced by the Tianjin outlet can be rectified within several channel sections and the transition time can be greatly shortened by allowing the water levels immediately upstream of the control gates to vary within proscribed ranges, rather than being held constant. 展开更多
关键词 Middle route South-to-North Water Transfer project unsteady flow open channel control system SIMULATION
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部