Conventional repairing methods for asphalt pavement have some inconveniences,such as insufficient strength,and are typically time-consuming.To address these issues,this study proposes a new technological method to des...Conventional repairing methods for asphalt pavement have some inconveniences,such as insufficient strength,and are typically time-consuming.To address these issues,this study proposes a new technological method to design and prepare a high-performance assembled asphalt concrete block for fast repair of the potholes.A series of composite modified asphalt binders with 10%crumb rubber(CR)and different dosages(0%,1%,3%,5%)of polyurethane(PU)are examined to determine the optimized binder.Subsequently,the corresponding asphalt mixtures are prepared for further comparison and assessment of engineering properties,such as moistureinduced damage,high-temperature deformation,and low-temperature cracking characteristics.The test results show that PU can significantly improve the high-temperature performance and hardness of(crumb rubber modified asphalt)CRMA binder;3%PU contributes allowing the resistance of CRMA mixture to moisture-induced damage at higher levels,particularly under water whole immersion;as 3%PU is added,the high-temperature rutting deformation resistance of the CRMA mixture increases significantly,and the low-temperature anti-cracking properties are also improved slightly.Therefore,the innovatively designed high-quality assembled fast-repairing asphalt concrete block is recommended as an appropriate option for highway maintenance.展开更多
基金the Scientific Technology R&D Project of CCCC Asset Management Co.,Ltd.(RP2022015294&RP2022015296).
文摘Conventional repairing methods for asphalt pavement have some inconveniences,such as insufficient strength,and are typically time-consuming.To address these issues,this study proposes a new technological method to design and prepare a high-performance assembled asphalt concrete block for fast repair of the potholes.A series of composite modified asphalt binders with 10%crumb rubber(CR)and different dosages(0%,1%,3%,5%)of polyurethane(PU)are examined to determine the optimized binder.Subsequently,the corresponding asphalt mixtures are prepared for further comparison and assessment of engineering properties,such as moistureinduced damage,high-temperature deformation,and low-temperature cracking characteristics.The test results show that PU can significantly improve the high-temperature performance and hardness of(crumb rubber modified asphalt)CRMA binder;3%PU contributes allowing the resistance of CRMA mixture to moisture-induced damage at higher levels,particularly under water whole immersion;as 3%PU is added,the high-temperature rutting deformation resistance of the CRMA mixture increases significantly,and the low-temperature anti-cracking properties are also improved slightly.Therefore,the innovatively designed high-quality assembled fast-repairing asphalt concrete block is recommended as an appropriate option for highway maintenance.