Based on real time price counting of electric power, an optimization model of time sharing power for electrolytic zinc process(EZP) was established by means of an incremental fuzzy neural network(FNN), which is adopte...Based on real time price counting of electric power, an optimization model of time sharing power for electrolytic zinc process(EZP) was established by means of an incremental fuzzy neural network(FNN), which is adopted to approximate the relationship of current efficiency, current density and acidity. Penalty function introduced and optimal objective function reconstructed, a single loop simulated annealing algorithm(SAA) by using mutation and extending searching spaces was used to obtain optimal time sharing power scheme. Industrial practical results show that the whole system can greatly decrease the power consumption of EZP and increase the time sharing profits.展开更多
Modeling and simulation have emerged as an indispensable approach to create numerical experiment platforms and study engineering systems.However,the increasingly complicated systems that engineers face today dramatica...Modeling and simulation have emerged as an indispensable approach to create numerical experiment platforms and study engineering systems.However,the increasingly complicated systems that engineers face today dramatically challenge state-of-the-art modeling and simulation approaches.Such complicated systems,which are composed of not only continuous states but also discrete events,and which contain complex dynamics across multiple timescales,are defined as generalized hybrid systems(GHSs)in this paper.As a representative GHS,megawatt power electronics(MPE)systems have been largely integrated into the modern power grid,but MPE simulation remains a bottleneck due to its unacceptable time cost and poor convergence.To address this challenge,this paper proposes the numerical convex lens approach to achieve state-discretized modeling and simulation of GHSs.This approach transforms conventional time-discretized passive simulations designed for pure-continuous systems into state-discretized selective simulations designed for GHSs.When this approach was applied to a largescale MPE-based renewable energy system,a 1000-fold increase in simulation speed was achieved,in comparison with existing software.Furthermore,the proposed approach uniquely enables the switching transient simulation of a largescale megawatt system with high accuracy,compared with experimental results,and with no convergence concerns.The numerical convex lens approach leads to the highly efficient simulation of intricate GHSs across multiple timescales,and thus significantly extends engineers’capability to study systems with numerical experiments.展开更多
With the development of new energy technology, there are increasing applications of grid-connected photovoltaic power generation system. However, there is little research on development of electromechanical model of l...With the development of new energy technology, there are increasing applications of grid-connected photovoltaic power generation system. However, there is little research on development of electromechanical model of large scale photovoltaic power station. The computational speed will be very slow if electromagnetic transient model is used for stability study because of its complexity. Therefore, study on electromechanical transient model of grid-connected photovoltaic power generation system is of great meaning. In this paper, electromagnetic transient model of photovoltaic power generation system is introduced first, and then a general electromechanical transient model is proposed. These two kinds of simulation model are set up in PSCAD. By comparing the simulation results of two models, the correctness and validity of the electromechanical transient model is verified. It provides reference model for efficient simulation and modeling of grid-connected photovoltaic power station in large-scale power systems.展开更多
This paper is devoted to development and study of models for operator training systems of heating power station processes management. It proposed a mathematical model describing the management processes of heating pow...This paper is devoted to development and study of models for operator training systems of heating power station processes management. It proposed a mathematical model describing the management processes of heating power units of the technological complex considering the relationship of technological variables in deviations effective in real time. A software complex is developed for the system of training of operators controlling processes in heating station units. Obtained results may be used in the course of development of computer training systems for operators of heating power stations with cross-linkage.展开更多
电力系统分析课程中有些概念抽象,不容易通过实际演示来完成,使得本门课程教与学都变得困难起来。采用具有可视化图形用户界面的Power World Simulator软件,可以很好地解决这些问题。文章介绍了这款全英文免费的软件,根据一个14节点电...电力系统分析课程中有些概念抽象,不容易通过实际演示来完成,使得本门课程教与学都变得困难起来。采用具有可视化图形用户界面的Power World Simulator软件,可以很好地解决这些问题。文章介绍了这款全英文免费的软件,根据一个14节点电力系统原型,建立了可视化的模型,使用该软件演示了潮流计算和短路计算等难点问题,显示了该软件给电力系统分析课程教与学带来的好处。展开更多
将可视化软件Power World Simulator应用于电力系统暂态稳定性仿真,介绍了仿真的步骤和发电机模型库,建立IEEE-3机9节点系统,先求得系统的潮流分布,然后选择发电机、励磁系统和稳定器的类型,设置三相短路故障,完成暂态稳定性仿真。通过...将可视化软件Power World Simulator应用于电力系统暂态稳定性仿真,介绍了仿真的步骤和发电机模型库,建立IEEE-3机9节点系统,先求得系统的潮流分布,然后选择发电机、励磁系统和稳定器的类型,设置三相短路故障,完成暂态稳定性仿真。通过分析和对比发电机6阶、5阶实用模型和经典2阶数学模型时的仿真结果,验证了暂态稳定性仿真结果的有效性。展开更多
The development direction of railways is toward the improvement of capacity and service quality, where the service quality includes safety, schedule, high speed, and comfort. In light of the existing cellular automato...The development direction of railways is toward the improvement of capacity and service quality, where the service quality includes safety, schedule, high speed, and comfort. In light of the existing cellular automaton models, in this paper, we develop a model to analyze the mixed running processes of trains with maximal speeds of 500 km/h and 350 km/h respectively in the moving block system. In the proposed model, we establish some sound rules to control the running processes of a train, where the rules include the departure rules in the intermediate stations, the overtaking rules, and the conditions of speed limitation for a train stopping at a station or passing through a station. With the consideration of the mixed ratio and the distance between two adjacent stations, the properties of the train traffic flow (including capacity and average speed) are simulated. The numerical results show that the interactions among different trains will affect the capacity, and a proper increase of the spatial distance between two adjacent stations can enhance the capacity and the average speed under the moving block.展开更多
Recently published results of field and laboratory experiments on the seismic/acoustic response to injection of direct current (DC) pulses into the Earth crust or stressed rock samples raised a question on a possibi...Recently published results of field and laboratory experiments on the seismic/acoustic response to injection of direct current (DC) pulses into the Earth crust or stressed rock samples raised a question on a possibility of electrical earthquake triggering. A physical mechanism of the considered phenomenon is not clear yet in view of the very low current density (10-7-10-s A/m^2) generated by the pulsed power systems at the epicenter depth (5-10 km) of local earthquakes occurred just after the current injection. The paper describes results of laboratory "earthquake" triggering by DC pulses under conditions of a spring-block model simulated the seismogenic fault. It is experimentally shown that the electric triggering of the laboratory "earthquake" (sharp slip of a movable block of the spring-block system) is possible only within a range of subcritical state of the system, when the shear stress between the movable and fixed blocks obtains 0.98-0.99 of its critical value. The threshold of electric triggering action is about 20 A/m^2 that is 7-8 orders of magnitude higher than estimated electric current density for Bishkek test site (Northern Tien Shan, Kirghizia) where the seismic response to the man-made electric action was observed. In this connection, the electric triggering phenomena may be explained by contraction of electric current in the narrow conductive areas of the faults and the corresponding increase in current density or by involving the secondary triggering mechanisms like electromagnetic stimulation of conductive fluid migration into the fault area resulted in decrease in the fault strength properties.展开更多
Maximum Power Point Tracking (MPPT) is an important process in Photovoltaic (PV) systems because of the need to extract maximum power from PV panels used in these systems. Without the ability to track and have PV pane...Maximum Power Point Tracking (MPPT) is an important process in Photovoltaic (PV) systems because of the need to extract maximum power from PV panels used in these systems. Without the ability to track and have PV panels operate at its maximum power point (MPP) entails power losses;resulting in high cost since more panels will be required to provide specified energy needs. To achieve high efficiency and low cost, MPPT has therefore become an imperative in PV systems. In this study, an MPP tracker is modeled using the IC algorithm and its behavior under rapidly changing environmental conditions of temperature and irradiation levels is investigated. This algorithm, based on knowledge of the variation of the conductance of PV cells and the operating point with respect to the voltage and current of the panel calculates the slope of the power characteristics to determine the MPP as the peak of the curve. A simple circuit model of the DC-DC boost converter connected to a PV panel is used in the simulation;and the output of the boost converter is fed through a 3-phase inverter to an electricity grid. The model was simulated and tested using MATLAB/Simulink. Simulation results show the effectiveness of the IC algorithm for tracking the MPP in PV systems operating under rapidly changing temperatures and irradiations with a settling time of 2 seconds.展开更多
This paper mainly deals with the simulation on the strength of the concrete armor block in model test. According to the requirement for the strength of blocks in models with various scales, the components of materials...This paper mainly deals with the simulation on the strength of the concrete armor block in model test. According to the requirement for the strength of blocks in models with various scales, the components of materials for model blocks and their proportions are determined. The failure of armor blocks on rubble-mound breakwaters is reproduced by model tests.展开更多
The complexity of distribution network model mainly depends on the model scale of grid-connected distributed photovoltaic (PV) power generation. Therefore, the simulation performance of multi-scale PV model is the key...The complexity of distribution network model mainly depends on the model scale of grid-connected distributed photovoltaic (PV) power generation. Therefore, the simulation performance of multi-scale PV model is the key factor of the simulation accuracy in the specific operating scenarios of distribution network. In this paper, a multi-scale model of grid connected PV distributed generation system is proposed based on the mathematical model of grid-connected distributed PV power generation. It is analyzed that differences of simulation performance, such as adaptability of simulation step size, accuracy of output and the effect on voltage profile of distribution network, between PV models with different scales in IEEE 33 node example. Simulation results indicate that the multi-scale model is effective in improving the accuracy and efficiency of simulation under different operating conditions of distribution network.展开更多
Binary logistic regression models are commonly used to assess the association between outcomes and covariates. Many covariates are inherently continuous, and have a variety of distributions, including those that are h...Binary logistic regression models are commonly used to assess the association between outcomes and covariates. Many covariates are inherently continuous, and have a variety of distributions, including those that are heavily skewed to the left or right. Existing theoretical formulas, criteria, and simulation programs cannot accurately estimate the sample size and power of non-standard distributions. Therefore, we have developed a simulation program that uses Monte Carlo methods to estimate the exact power of a binary logistic regression model. This power calculation can be used for distributions of any shape and covariates of any type (continuous, ordinal, and nominal), and can account for nonlinear relationships between covariates and outcomes. For illustrative purposes, this simulation program is applied to real data obtained from a study on the influence of smoking on 90-day outcomes after acute atherothrombotic stroke. Our program is applicable to all effect sizes and makes it possible to apply various statistical methods, logistic regression and related simulations such as Bayesian inference with some modifications.展开更多
The paper describes the application of an ANN based approach to the identification of the parameters relevant to the steady state behavior of composite power electronic device models of circuit simulation software. ...The paper describes the application of an ANN based approach to the identification of the parameters relevant to the steady state behavior of composite power electronic device models of circuit simulation software. The identification of model parameters of IGBT in PSPICE using BP neural network is illustrated.展开更多
HVDC technology has been widely used in modern power system. On one hand, HVDC has the advantages of economy, high efficiency and strong controllability. While on the other hand, it makes the dynamic characteristics o...HVDC technology has been widely used in modern power system. On one hand, HVDC has the advantages of economy, high efficiency and strong controllability. While on the other hand, it makes the dynamic characteristics of the power system becoming more and more complex. That puts forward a new challenge to system stability and raises new questions for power system simulation. This paper focuses on the interaction between AC and DC systems, especially the problem of commutation failure caused by AC system fault. Based on the data of China Southern Power Grid, this paper calculates the fault regions that may cause commutation failure and calculates the system critical clearance time under different load models, analyzes the impacts of different load models on commutation failure and the stability of AC/DC hybrid system.展开更多
In this paper, we developed a new continuous block method by the method of interpolation and collocation to derive new scheme. We adopted the use of power series as a basis function for approximate solution. We evalua...In this paper, we developed a new continuous block method by the method of interpolation and collocation to derive new scheme. We adopted the use of power series as a basis function for approximate solution. We evaluated at off grid points to get a continuous hybrid multistep method. The continuous hybrid multistep method is solved for the independent solution to yield a continuous block method which is evaluated at selected points to yield a discrete block method. The basic properties of the block method were investigated and found to be consistent, zero stable and convergent. The results were found to compete favorably with the existing methods in terms of accuracy and error bound. In particular, the scheme was found to have a large region of absolute stability. The new method was tested on real life problem namely: Dynamic model.展开更多
文摘Based on real time price counting of electric power, an optimization model of time sharing power for electrolytic zinc process(EZP) was established by means of an incremental fuzzy neural network(FNN), which is adopted to approximate the relationship of current efficiency, current density and acidity. Penalty function introduced and optimal objective function reconstructed, a single loop simulated annealing algorithm(SAA) by using mutation and extending searching spaces was used to obtain optimal time sharing power scheme. Industrial practical results show that the whole system can greatly decrease the power consumption of EZP and increase the time sharing profits.
基金the Major Program of National Natural Science Foundation of China(51490683).
文摘Modeling and simulation have emerged as an indispensable approach to create numerical experiment platforms and study engineering systems.However,the increasingly complicated systems that engineers face today dramatically challenge state-of-the-art modeling and simulation approaches.Such complicated systems,which are composed of not only continuous states but also discrete events,and which contain complex dynamics across multiple timescales,are defined as generalized hybrid systems(GHSs)in this paper.As a representative GHS,megawatt power electronics(MPE)systems have been largely integrated into the modern power grid,but MPE simulation remains a bottleneck due to its unacceptable time cost and poor convergence.To address this challenge,this paper proposes the numerical convex lens approach to achieve state-discretized modeling and simulation of GHSs.This approach transforms conventional time-discretized passive simulations designed for pure-continuous systems into state-discretized selective simulations designed for GHSs.When this approach was applied to a largescale MPE-based renewable energy system,a 1000-fold increase in simulation speed was achieved,in comparison with existing software.Furthermore,the proposed approach uniquely enables the switching transient simulation of a largescale megawatt system with high accuracy,compared with experimental results,and with no convergence concerns.The numerical convex lens approach leads to the highly efficient simulation of intricate GHSs across multiple timescales,and thus significantly extends engineers’capability to study systems with numerical experiments.
文摘With the development of new energy technology, there are increasing applications of grid-connected photovoltaic power generation system. However, there is little research on development of electromechanical model of large scale photovoltaic power station. The computational speed will be very slow if electromagnetic transient model is used for stability study because of its complexity. Therefore, study on electromechanical transient model of grid-connected photovoltaic power generation system is of great meaning. In this paper, electromagnetic transient model of photovoltaic power generation system is introduced first, and then a general electromechanical transient model is proposed. These two kinds of simulation model are set up in PSCAD. By comparing the simulation results of two models, the correctness and validity of the electromechanical transient model is verified. It provides reference model for efficient simulation and modeling of grid-connected photovoltaic power station in large-scale power systems.
文摘This paper is devoted to development and study of models for operator training systems of heating power station processes management. It proposed a mathematical model describing the management processes of heating power units of the technological complex considering the relationship of technological variables in deviations effective in real time. A software complex is developed for the system of training of operators controlling processes in heating station units. Obtained results may be used in the course of development of computer training systems for operators of heating power stations with cross-linkage.
文摘电力系统分析课程中有些概念抽象,不容易通过实际演示来完成,使得本门课程教与学都变得困难起来。采用具有可视化图形用户界面的Power World Simulator软件,可以很好地解决这些问题。文章介绍了这款全英文免费的软件,根据一个14节点电力系统原型,建立了可视化的模型,使用该软件演示了潮流计算和短路计算等难点问题,显示了该软件给电力系统分析课程教与学带来的好处。
文摘将可视化软件Power World Simulator应用于电力系统暂态稳定性仿真,介绍了仿真的步骤和发电机模型库,建立IEEE-3机9节点系统,先求得系统的潮流分布,然后选择发电机、励磁系统和稳定器的类型,设置三相短路故障,完成暂态稳定性仿真。通过分析和对比发电机6阶、5阶实用模型和经典2阶数学模型时的仿真结果,验证了暂态稳定性仿真结果的有效性。
基金Project supported by the State Social Science Fund Project, China (Grant No. 11CJY067)the Natural Science Foundation of Gansu Province, China (Grant No. 1107RJYA070)
文摘The development direction of railways is toward the improvement of capacity and service quality, where the service quality includes safety, schedule, high speed, and comfort. In light of the existing cellular automaton models, in this paper, we develop a model to analyze the mixed running processes of trains with maximal speeds of 500 km/h and 350 km/h respectively in the moving block system. In the proposed model, we establish some sound rules to control the running processes of a train, where the rules include the departure rules in the intermediate stations, the overtaking rules, and the conditions of speed limitation for a train stopping at a station or passing through a station. With the consideration of the mixed ratio and the distance between two adjacent stations, the properties of the train traffic flow (including capacity and average speed) are simulated. The numerical results show that the interactions among different trains will affect the capacity, and a proper increase of the spatial distance between two adjacent stations can enhance the capacity and the average speed under the moving block.
基金funded by Russian Foundation for Basic Research according to research project No.15-55-53104National Natural Science Foundation of China according to International cooperation project No.41511130032
文摘Recently published results of field and laboratory experiments on the seismic/acoustic response to injection of direct current (DC) pulses into the Earth crust or stressed rock samples raised a question on a possibility of electrical earthquake triggering. A physical mechanism of the considered phenomenon is not clear yet in view of the very low current density (10-7-10-s A/m^2) generated by the pulsed power systems at the epicenter depth (5-10 km) of local earthquakes occurred just after the current injection. The paper describes results of laboratory "earthquake" triggering by DC pulses under conditions of a spring-block model simulated the seismogenic fault. It is experimentally shown that the electric triggering of the laboratory "earthquake" (sharp slip of a movable block of the spring-block system) is possible only within a range of subcritical state of the system, when the shear stress between the movable and fixed blocks obtains 0.98-0.99 of its critical value. The threshold of electric triggering action is about 20 A/m^2 that is 7-8 orders of magnitude higher than estimated electric current density for Bishkek test site (Northern Tien Shan, Kirghizia) where the seismic response to the man-made electric action was observed. In this connection, the electric triggering phenomena may be explained by contraction of electric current in the narrow conductive areas of the faults and the corresponding increase in current density or by involving the secondary triggering mechanisms like electromagnetic stimulation of conductive fluid migration into the fault area resulted in decrease in the fault strength properties.
文摘Maximum Power Point Tracking (MPPT) is an important process in Photovoltaic (PV) systems because of the need to extract maximum power from PV panels used in these systems. Without the ability to track and have PV panels operate at its maximum power point (MPP) entails power losses;resulting in high cost since more panels will be required to provide specified energy needs. To achieve high efficiency and low cost, MPPT has therefore become an imperative in PV systems. In this study, an MPP tracker is modeled using the IC algorithm and its behavior under rapidly changing environmental conditions of temperature and irradiation levels is investigated. This algorithm, based on knowledge of the variation of the conductance of PV cells and the operating point with respect to the voltage and current of the panel calculates the slope of the power characteristics to determine the MPP as the peak of the curve. A simple circuit model of the DC-DC boost converter connected to a PV panel is used in the simulation;and the output of the boost converter is fed through a 3-phase inverter to an electricity grid. The model was simulated and tested using MATLAB/Simulink. Simulation results show the effectiveness of the IC algorithm for tracking the MPP in PV systems operating under rapidly changing temperatures and irradiations with a settling time of 2 seconds.
文摘This paper mainly deals with the simulation on the strength of the concrete armor block in model test. According to the requirement for the strength of blocks in models with various scales, the components of materials for model blocks and their proportions are determined. The failure of armor blocks on rubble-mound breakwaters is reproduced by model tests.
文摘The complexity of distribution network model mainly depends on the model scale of grid-connected distributed photovoltaic (PV) power generation. Therefore, the simulation performance of multi-scale PV model is the key factor of the simulation accuracy in the specific operating scenarios of distribution network. In this paper, a multi-scale model of grid connected PV distributed generation system is proposed based on the mathematical model of grid-connected distributed PV power generation. It is analyzed that differences of simulation performance, such as adaptability of simulation step size, accuracy of output and the effect on voltage profile of distribution network, between PV models with different scales in IEEE 33 node example. Simulation results indicate that the multi-scale model is effective in improving the accuracy and efficiency of simulation under different operating conditions of distribution network.
文摘Binary logistic regression models are commonly used to assess the association between outcomes and covariates. Many covariates are inherently continuous, and have a variety of distributions, including those that are heavily skewed to the left or right. Existing theoretical formulas, criteria, and simulation programs cannot accurately estimate the sample size and power of non-standard distributions. Therefore, we have developed a simulation program that uses Monte Carlo methods to estimate the exact power of a binary logistic regression model. This power calculation can be used for distributions of any shape and covariates of any type (continuous, ordinal, and nominal), and can account for nonlinear relationships between covariates and outcomes. For illustrative purposes, this simulation program is applied to real data obtained from a study on the influence of smoking on 90-day outcomes after acute atherothrombotic stroke. Our program is applicable to all effect sizes and makes it possible to apply various statistical methods, logistic regression and related simulations such as Bayesian inference with some modifications.
文摘The paper describes the application of an ANN based approach to the identification of the parameters relevant to the steady state behavior of composite power electronic device models of circuit simulation software. The identification of model parameters of IGBT in PSPICE using BP neural network is illustrated.
文摘HVDC technology has been widely used in modern power system. On one hand, HVDC has the advantages of economy, high efficiency and strong controllability. While on the other hand, it makes the dynamic characteristics of the power system becoming more and more complex. That puts forward a new challenge to system stability and raises new questions for power system simulation. This paper focuses on the interaction between AC and DC systems, especially the problem of commutation failure caused by AC system fault. Based on the data of China Southern Power Grid, this paper calculates the fault regions that may cause commutation failure and calculates the system critical clearance time under different load models, analyzes the impacts of different load models on commutation failure and the stability of AC/DC hybrid system.
文摘In this paper, we developed a new continuous block method by the method of interpolation and collocation to derive new scheme. We adopted the use of power series as a basis function for approximate solution. We evaluated at off grid points to get a continuous hybrid multistep method. The continuous hybrid multistep method is solved for the independent solution to yield a continuous block method which is evaluated at selected points to yield a discrete block method. The basic properties of the block method were investigated and found to be consistent, zero stable and convergent. The results were found to compete favorably with the existing methods in terms of accuracy and error bound. In particular, the scheme was found to have a large region of absolute stability. The new method was tested on real life problem namely: Dynamic model.