To improve the quality of the Hong Kong–Zhuhai–Macao Bridge paving project,a new paving layer material,Guss-mastic asphalt(GMA),was proposed in this paper by combining the advantages of two types of cast asphalt mix...To improve the quality of the Hong Kong–Zhuhai–Macao Bridge paving project,a new paving layer material,Guss-mastic asphalt(GMA),was proposed in this paper by combining the advantages of two types of cast asphalt mixtures:mastic asphalt(MA)and Guss asphalt(GA).Based on the characteristics of GMA,to simulate its actual production process,this study developed a small-simulated cooker mixing equipment.Moreover,the flow degree,60C dynamic stability,and impact toughness were proposed to be used to evaluate the construction and ease,high temperature stability,and fatigue resistance of GMA cast asphalt mixtures,respectively.Moreover,the quality control standards for GMA paving materials by indoor tests,field trial mix GMA material performance tests,and accelerated loading tests were finalized.The study showed that the developed simulated cooker yielded consistent mixing results in the same working environment as the engineering cooker device.Increasing the coarse aggregate incorporation rate,coarsening the mastic epure(ME)gradation composition,and using a smaller oil to stone ratio can reduce the flowability of the GMA materials to varying degrees.The four-point bending fatigue life and impact toughness of the different GMA materials are correlated well.A mobility of<20 s,60C dynamic stability of 400–800 times/mm,15C impact toughness of400 N⋅mm,and cooker car mixing temperature control standard of 210C–230C form an appropriate control index system for the design and production of GMA cast asphalt mixtures.Simultaneously,accelerated loading tests verified the accuracy and reliability of the quality control index system that has been used in the GMA paving project of the Hong Kong–Zhuhai–Macao Bridge deck and has achieved good application results.展开更多
In the process of continuous development of construction enterprises, new requirements have been put forward for construction projects. By strengthening the construction quality control of reinforced concrete shear wa...In the process of continuous development of construction enterprises, new requirements have been put forward for construction projects. By strengthening the construction quality control of reinforced concrete shear wall structure, the construction level of reinforced concrete can be continuously improved, the construction quality can be guaranteed, and the construction project can be successfully completed, which is worthy of extensive application and promotion in construction enterprises, thus providing a broader development space for construction enterprises.展开更多
The construction method of continuous paving of the upper and lower base of the water stable macadam base can improve the construction efficiency,overcome the quality problems of the traditional layered paving of the ...The construction method of continuous paving of the upper and lower base of the water stable macadam base can improve the construction efficiency,overcome the quality problems of the traditional layered paving of the upper and lower base,such as untimely curing,slow construction,poor interlayer bonding,contraction joint and interlayer,so as to ensure the construction quality of the water stable macadam.It is also the promotion and application of new technology.展开更多
CFG pile has been widely applied as one of the common ground treatment techniques. As a concealed work, the construction quality of pile foundation not only relates to the success of the project, but also concerns the...CFG pile has been widely applied as one of the common ground treatment techniques. As a concealed work, the construction quality of pile foundation not only relates to the success of the project, but also concerns the benefits of thousands of hot, seholds. Only strengthening the supervision and management during the construction and strictly designing and specifying CFG pile can ensure the construction quality of CFG pile. But most researches focus on operating mechanism and theoretical analysis, and there are fewer researches about the construction of CFG pile. The real construction of CFG pile has no specified operation and lacks of the construction guidance, which not only causes great problems and has great influence on the intensity of CFG pile, but also makes the real pile body have great difference from the design requirements. Therefore, the study on construction of CFG pile in the paper has great significance.展开更多
文摘To improve the quality of the Hong Kong–Zhuhai–Macao Bridge paving project,a new paving layer material,Guss-mastic asphalt(GMA),was proposed in this paper by combining the advantages of two types of cast asphalt mixtures:mastic asphalt(MA)and Guss asphalt(GA).Based on the characteristics of GMA,to simulate its actual production process,this study developed a small-simulated cooker mixing equipment.Moreover,the flow degree,60C dynamic stability,and impact toughness were proposed to be used to evaluate the construction and ease,high temperature stability,and fatigue resistance of GMA cast asphalt mixtures,respectively.Moreover,the quality control standards for GMA paving materials by indoor tests,field trial mix GMA material performance tests,and accelerated loading tests were finalized.The study showed that the developed simulated cooker yielded consistent mixing results in the same working environment as the engineering cooker device.Increasing the coarse aggregate incorporation rate,coarsening the mastic epure(ME)gradation composition,and using a smaller oil to stone ratio can reduce the flowability of the GMA materials to varying degrees.The four-point bending fatigue life and impact toughness of the different GMA materials are correlated well.A mobility of<20 s,60C dynamic stability of 400–800 times/mm,15C impact toughness of400 N⋅mm,and cooker car mixing temperature control standard of 210C–230C form an appropriate control index system for the design and production of GMA cast asphalt mixtures.Simultaneously,accelerated loading tests verified the accuracy and reliability of the quality control index system that has been used in the GMA paving project of the Hong Kong–Zhuhai–Macao Bridge deck and has achieved good application results.
文摘In the process of continuous development of construction enterprises, new requirements have been put forward for construction projects. By strengthening the construction quality control of reinforced concrete shear wall structure, the construction level of reinforced concrete can be continuously improved, the construction quality can be guaranteed, and the construction project can be successfully completed, which is worthy of extensive application and promotion in construction enterprises, thus providing a broader development space for construction enterprises.
文摘The construction method of continuous paving of the upper and lower base of the water stable macadam base can improve the construction efficiency,overcome the quality problems of the traditional layered paving of the upper and lower base,such as untimely curing,slow construction,poor interlayer bonding,contraction joint and interlayer,so as to ensure the construction quality of the water stable macadam.It is also the promotion and application of new technology.
文摘CFG pile has been widely applied as one of the common ground treatment techniques. As a concealed work, the construction quality of pile foundation not only relates to the success of the project, but also concerns the benefits of thousands of hot, seholds. Only strengthening the supervision and management during the construction and strictly designing and specifying CFG pile can ensure the construction quality of CFG pile. But most researches focus on operating mechanism and theoretical analysis, and there are fewer researches about the construction of CFG pile. The real construction of CFG pile has no specified operation and lacks of the construction guidance, which not only causes great problems and has great influence on the intensity of CFG pile, but also makes the real pile body have great difference from the design requirements. Therefore, the study on construction of CFG pile in the paper has great significance.