PhaseⅠcommissioning of the SSRF storage ring at 3.0 GeV was ended with encouraging results. Distortions and calibrations of the linear optics during the storage ring commissioning are discussed in this paper.The cali...PhaseⅠcommissioning of the SSRF storage ring at 3.0 GeV was ended with encouraging results. Distortions and calibrations of the linear optics during the storage ring commissioning are discussed in this paper.The calibration procedure has reduced sextupole-additional focusing effects by minimizing closed orbit deviation and corrected quadrupole magnetic coefficients with the linear optics from closed orbit (LOCO) technique.After fitting the closed orbit response matrix,linear optics of the storage ring is substantially corrected,and the measured parameters agree well with the design.Four optics modes were commissioned,and relevant machine physics studies were carried out.Their results are summarized.展开更多
文摘PhaseⅠcommissioning of the SSRF storage ring at 3.0 GeV was ended with encouraging results. Distortions and calibrations of the linear optics during the storage ring commissioning are discussed in this paper.The calibration procedure has reduced sextupole-additional focusing effects by minimizing closed orbit deviation and corrected quadrupole magnetic coefficients with the linear optics from closed orbit (LOCO) technique.After fitting the closed orbit response matrix,linear optics of the storage ring is substantially corrected,and the measured parameters agree well with the design.Four optics modes were commissioned,and relevant machine physics studies were carried out.Their results are summarized.