After the preliminary basic research on the problems encountered during the production period of Gulong shale oil in the Songliao Basin, NE China, and the scientific exploration, the special characteristics of Gulong ...After the preliminary basic research on the problems encountered during the production period of Gulong shale oil in the Songliao Basin, NE China, and the scientific exploration, the special characteristics of Gulong shale oil in terms of reservoir space, phase distribution, flow pattern, and mineral evolution are proposed. The main results are as follows :(1) The source of organic matter, mechanism of hydrocarbon generation and expulsion, and key factors affecting shale oil abundance;(2) The types and structural characteristics of the reservoir and their contribution to porosity and permeability;(3) The mineral origin and evolution of minerals and their influence on reservoir availability, sensitivity, and compressibility;(4) The rock mechanical characteristics and fracture propagation law of Gulong shale;(5) The shale oil products, phase change law and main control factors of adsorption and desorption conversion of Gulong shale oil;(6) The mechanism of shale oil-liquid, solid-liquid gas interaction and enhanced oil recovery. Three key research suggestions are proposed to realize the large-scale economic utilization of the Gulong shale oil as follows:(1) Deepen research on the mechanism of oil and gas generation and discharge, storage and transportation, to guide the selection of geological sweet spots of shale oil;(2) Deepen research on the compressibility and fracture initiation mechanism to support the selection of engineering sweet spots and optimization of engineering design;(3) Deepen research on the fluid interaction mechanism under reservoir conditions, os us to guide the optimization of development schemes and the selection of EOR technologies. A successful development of Gulong shale oil requires global experts and scholars to contribute multidisciplinary innovative ideas and technical ideas to solve production problems.展开更多
The Sichuan–Tibet railway construction has received significant attention from both China and abroad.The new section from Ya’an to Nyingchi is about 1018.6 km long,including 69 tunnels with a total length of 841.7 k...The Sichuan–Tibet railway construction has received significant attention from both China and abroad.The new section from Ya’an to Nyingchi is about 1018.6 km long,including 69 tunnels with a total length of 841.7 km.The longest tunnel(Yigong tunnel)is 42.4 km long.The successful construction of the Sichuan–Tibet railway depends largely on tunnel construction.Due to the complex conditions,tunnel construction for the Sichuan–Tibet railway poses great challenges to the research community.This paper aims to illustrate the necessity of interdisciplinary and joint research to solve problems associated with tunnel construction that will be encountered in the immediate future and facilitate the communication and exchange of ideas between disciplines.To this end,based on a systematic analysis of the available data related to Sichuan–Tibet railway tunnels,six major aspects of the geology,environment,and engineering conditions are identified.Next,based on the engineering responses from the Sichuan–Tibet railway tunnels,potential technical problems and risk characteristics are predicted and evaluated.Further,six key scientific issues are identified and discussed based on a coupled multi-layer analysis of essential tunnel engineering issues.Finally,research directions,technical ideas,and research methods that should be carried out for this project are proposed.展开更多
This paper gives a definition of the Industrial Internet and expounds on the academic connotation of the future Industrial Internet.From this foundation,we outline the development and current status of the Industrial ...This paper gives a definition of the Industrial Internet and expounds on the academic connotation of the future Industrial Internet.From this foundation,we outline the development and current status of the Industrial Internet in China and globally.Moreover,we detail the avant-garde paradigms encompassed within the National Natural Science Foundation of China(NSFC)’s“Future Industrial Internet Fundamental Theory and Key Technologies”research plan and its corresponding management strategies.This research initiative endeavors to enhance interdisciplinary collaborations,aiming for a synergistic alignment of industry,academia,research,and practical implementations.The primary focus of the research plan is on the pivotal scientific challenges inherent to the future industrial internet.It is poised to traverse the“first mile”,encompassing foundational research and pioneering innovations specific to the industrial internet,and seamlessly bridges to the“last mile”,ensuring the effective commercialization of scientific and technological breakthroughs into tangible industrial market applications.The anticipated contributions from this initiative are projected to solidify both the theoretical and practical scaffolding essential for the cultivation of a globally competitive industrial internet infrastructure in China.展开更多
基金Supported by the National Natural Science Foundation of China(72088101)。
文摘After the preliminary basic research on the problems encountered during the production period of Gulong shale oil in the Songliao Basin, NE China, and the scientific exploration, the special characteristics of Gulong shale oil in terms of reservoir space, phase distribution, flow pattern, and mineral evolution are proposed. The main results are as follows :(1) The source of organic matter, mechanism of hydrocarbon generation and expulsion, and key factors affecting shale oil abundance;(2) The types and structural characteristics of the reservoir and their contribution to porosity and permeability;(3) The mineral origin and evolution of minerals and their influence on reservoir availability, sensitivity, and compressibility;(4) The rock mechanical characteristics and fracture propagation law of Gulong shale;(5) The shale oil products, phase change law and main control factors of adsorption and desorption conversion of Gulong shale oil;(6) The mechanism of shale oil-liquid, solid-liquid gas interaction and enhanced oil recovery. Three key research suggestions are proposed to realize the large-scale economic utilization of the Gulong shale oil as follows:(1) Deepen research on the mechanism of oil and gas generation and discharge, storage and transportation, to guide the selection of geological sweet spots of shale oil;(2) Deepen research on the compressibility and fracture initiation mechanism to support the selection of engineering sweet spots and optimization of engineering design;(3) Deepen research on the fluid interaction mechanism under reservoir conditions, os us to guide the optimization of development schemes and the selection of EOR technologies. A successful development of Gulong shale oil requires global experts and scholars to contribute multidisciplinary innovative ideas and technical ideas to solve production problems.
基金the financial support by the National Natural Science of China(Grant No.51738002)the National Key R&D Program of China(Grant No.2017YFC0805401).
文摘The Sichuan–Tibet railway construction has received significant attention from both China and abroad.The new section from Ya’an to Nyingchi is about 1018.6 km long,including 69 tunnels with a total length of 841.7 km.The longest tunnel(Yigong tunnel)is 42.4 km long.The successful construction of the Sichuan–Tibet railway depends largely on tunnel construction.Due to the complex conditions,tunnel construction for the Sichuan–Tibet railway poses great challenges to the research community.This paper aims to illustrate the necessity of interdisciplinary and joint research to solve problems associated with tunnel construction that will be encountered in the immediate future and facilitate the communication and exchange of ideas between disciplines.To this end,based on a systematic analysis of the available data related to Sichuan–Tibet railway tunnels,six major aspects of the geology,environment,and engineering conditions are identified.Next,based on the engineering responses from the Sichuan–Tibet railway tunnels,potential technical problems and risk characteristics are predicted and evaluated.Further,six key scientific issues are identified and discussed based on a coupled multi-layer analysis of essential tunnel engineering issues.Finally,research directions,technical ideas,and research methods that should be carried out for this project are proposed.
文摘This paper gives a definition of the Industrial Internet and expounds on the academic connotation of the future Industrial Internet.From this foundation,we outline the development and current status of the Industrial Internet in China and globally.Moreover,we detail the avant-garde paradigms encompassed within the National Natural Science Foundation of China(NSFC)’s“Future Industrial Internet Fundamental Theory and Key Technologies”research plan and its corresponding management strategies.This research initiative endeavors to enhance interdisciplinary collaborations,aiming for a synergistic alignment of industry,academia,research,and practical implementations.The primary focus of the research plan is on the pivotal scientific challenges inherent to the future industrial internet.It is poised to traverse the“first mile”,encompassing foundational research and pioneering innovations specific to the industrial internet,and seamlessly bridges to the“last mile”,ensuring the effective commercialization of scientific and technological breakthroughs into tangible industrial market applications.The anticipated contributions from this initiative are projected to solidify both the theoretical and practical scaffolding essential for the cultivation of a globally competitive industrial internet infrastructure in China.